2,017
Views
11
CrossRef citations to date
0
Altmetric
Articles

Modelling the critical risk factors for modular integrated construction projects

, , &

References

  • Ameyaw EE, Chan APC. 2015. Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach. Expert Syst Appl. 42(12):5102–5116.
  • Brown TA. 2015. Confirmatory factor analysis for applied research. 2nd ed. The American Statistician. New York: The Guilford Press.
  • Chen C, Yu Y, Osei-Kyei R, Chan APC, Xu J. 2019. Developing a project sustainability index for sustainable development in transnational public–private partnership projects. Sustainable Devel. 27(6):1034.
  • Choi JO, O’Connor JT, Kim TW. 2016. Recipes for cost and schedule successes in industrial modular projects: Qualitative comparative analysis. J Constr Eng Manage. 142(10):04016055.
  • Chou Y-M, Polansky AM, Mason RL. 1998. Transforming non-normal data to normality in statistical process control. J Qual Technol. 30(2):133–141.
  • Construction Industry Council. 2018. About modular integrated construction. Hong Kong: Construction Industry Council.
  • Egan J. 1998. Rethinking construction: the report of the construction task force. United Kingdom: Construction Task Force.
  • Enshassi MSA, Walbridge S, West JS, Haas CT. 2019. Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. J Manage Eng. 35(4):05019004.
  • Fang DP, Xie F, Huang XY, Li H. 2004. Factor analysis-based studies on construction workplace safety management in China. Int J Project Manage. 22(1):43–49.
  • Goulding JS, Pour Rahimian F, Arif M, Sharp MD. 2015. New offsite production and business models in construction: priorities for the future research agenda. Arch Eng Design Manage. 11(3):163–184.
  • Hsiao SW. 1998. Fuzzy logic based decision model for product design. Int J Ind Ergon. 21(2):103–116.
  • Hsu PY, Angeloudis P, Aurisicchio M. 2018. Optimal logistics planning for modular construction using two-stage stochastic programming. Autom Constr. 94:47–61.
  • Hwang B-G, Shan M, Looi K-Y. 2018a. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. J Cleaner Prod. 183:183–193.
  • Hwang B-G, Shan M, Looi KY. 2018b. Knowledge-based decision support system for prefabricated prefinished volumetric construction. Autom Constr. 94:168–178.
  • Kim S, Nussbaum MA, Jia B. 2011. Low back injury risks during construction with prefabricated (panelised) walls: Effects of task and design factors. Ergonomics. 54(1):60–71.
  • Kim S, Nussbaum MA, Jia B. 2012. The benefits of an additional worker are task-dependent: Assessing low-back injury risks during prefabricated (panelized) wall construction. Appl Ergon. 43(5):843–849.
  • Lee JS, Kim YS. 2017. Analysis of cost-increasing risk factors in modular construction in Korea using FMEA. KSCE J Civ Eng. 21(6):1999–2010.
  • Li CZ, Hong J, Fan C, Xu X, Shen GQ. 2018. Schedule delay analysis of prefabricated housing production: A hybrid dynamic approach. J Cleaner Prod. 195:1533–1545.
  • Li CZ, Hong J, Xue F, Shen GQ, Xu X, Mok MK. 2016. Schedule risks in prefabrication housing production in Hong Kong: a social network analysis. J Cleaner Prod. 134(Part B):482–494.
  • Li CZ, Shen GQ, Xue F, Luo L, Xu X, Sommer L. 2017. Schedule risk modeling in prefabrication housing production. J Cleaner Prod. 153:692–706.
  • Li CZ, Xu X, Shen GQ, Fan C, Li X, Hong J. 2018. A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong. J Cleaner Prod. 185:366–381.
  • Li HX, Al-Hussein M, Lei Z, Ajweh Z. 2013. Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation. Can J Civ Eng. 40 (12):1184–1195.
  • Li M, Li G, Huang Y, Deng L. 2017. Research on investment risk management of Chinese prefabricated construction projects based on a system dynamics model. Buildings. 7(3):83.
  • Lingard H, Rowlinson S. 2006. Letter to the Editor. Construct Manage Econ. 24(11):1107–1109.
  • Lo SM. 1999. A fire safety assessment system for existing buildings. Fire Technol. 35(2):131–152.
  • Luo L, Mao C, Shen L, Li Z. 2015. Risk factors affecting practitioners’ attitudes toward the implementation of an industrialized building system a case study from China. Eng Const Arch Man. 22(6):622–643.
  • Luo L, Shen GQ, Xu G, Liu Y, Wang Y. 2019. Stakeholder-associated supply chain risks and their interactions in a prefabricated building project: A case study in Hong Kong. J Manage Eng. 35(2):05018015.
  • Mao C, Shen Q, Pan W, Ye K. 2015. Major barriers to off-site construction: The developer’s perspective in China. J Manage Eng. 31(3):04014043.
  • Norusis MJ. 2008. SPSS 16.0 Advanced statistical procedures companion. Upper Saddle River, NJ: Prentice-Hall.
  • Osei-Kyei R, Chan APC, Ameyaw EE. 2017. A fuzzy synthetic evaluation analysis of operational management critical success factors for public-private partnership infrastructure projects. Benchmarking. 24(7):2092–2112.
  • Pan W, Hon CK. 2018. Modular integrated construction for high-rise buildings. Proc Instit Civil Eng - Municipal Engineer. 1–12.
  • Project Management Institute. 2017. A guide to the project management body of knowledge (PMBOK Guide). 6th ed. Newton Square, PA: Project Management Institute.
  • Richard RB. 2005. Industrialised building systems: Reproduction before automation and robotics. Autom Constr. 14(4):442–451.
  • Richard R-B. 2006. Industrialize, flexible and demountable building systems. In: The CRIOCM 2006 International Symposium on “Advancement of Construction Management and Real Estate” INDUSTRIALISED, 1–11.
  • Sachs T, Tiong R, Qing Wang S. 2007. Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries: Survey results. Chinese Manage Studies. 1(2):126–148.
  • Shahtaheri Y, Rausch C, West J, Haas C, Nahangi M. 2017. Managing risk in modular construction using dimensional and geometric tolerance strategies. Autom Constr. 83:303–315.
  • Tavakol M, Dennick R. 2011. Making sense of Cronbach’s alpha. Int J Medical Education. 2:53–55.
  • Velamat S. 2012. Feasibility, Benefits and challenges of modular construction in high rise development in the United States: a developer's perspective [MSc Dissertation]. Massachusetts Institute of Technology, Cambridge, United States.
  • Wang Z, Hu H, Gong J. 2018. Simulation based multiple disturbances evaluation in the precast supply chain for improved disturbance prevention. J Cleaner Prod. 177:232–244.
  • Wuni IY, Shen GQ, Mahmud AT. 2019. Critical risk factors in the application of modular integrated construction: a systematic review. Int J Construct Manage. 1–15.
  • Wuni IY, Shen GQ. 2019a. Towards a decision support for modular integrated construction: An integrative review of the primary decision-making factors. Int J Construct Manage. 1–20.
  • Wuni IY, Shen GQ. 2019b. Critical success factors for modular integrated construction projects: a review. Building Res Inform. 1–22.
  • Wuni IY, Shen GQ. 2019c. Risks identification and allocation in the supply chain of Modular Integrated Construction (MiC). In: Al-Hussein M, editor. Proceedings of the 2019 Modular and Offsite Construction (MOC) Summit. Banff, Alberta, Canada: University of Alberta; p. 189–197.
  • Wuni IY, Shen GQ. 2019d. Holistic review and conceptual framework for the drivers of offsite construction: A total interpretive structural modelling approach. Buildings. 9(5):117–124.
  • Wuni IY, Shen GQ. 2020. Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies. J Cleaner Prod. 249:119347.
  • Xu Y, Chan APC, Yeung JFY. 2010. Developing a fuzzy risk allocation model for PPP projects in China. J Constr Eng Manage. 136(8):894–903.
  • Zadeh LA. 1965. Fuzzy sets. Inf Control. 8(3):338–353.
  • Zadeh LA. 1975. The concept of a linguistic variable and its application to approximate reasoning—II. Inf Sci. 8(3):199–249.
  • Zafar I, Wuni IY, Shen GQ, Ahmed S, Yousaf T. 2019. A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan. Int J Construct Manage. 1–19.
  • Zhang X. 2005. Critical success factors for public-private partnerships in infrastructure development. J Constr Eng Manage. 131(1):3–14.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.