References
- Anumba CJ, Evbuomwan NF. 1997. Concurrent engineering in design-build projects. Constr Manage Econ. 15(3):271–281.
- Austin SA, Baldwin AN, Steele JL. 2002. Improving building design through integrated planning and control. Eng, Constr Arch Manage. 9(3):249–258.
- Baiden BK. 2006.. Framework for the integration of the project delivery team [dissertation]. Leicestershire: Loughborough University.
- Baiden BK, Price A. 2011. The effect of integration on project delivery team effectiveness. Int J Proj Manage. 29(2):129–136.
- Baiden BK, Price ADF, Dainty A. 2006. The extent of team integration within construction projects. Int J Proj Manage. 24(1):13–23.
- Cheng MY, Tsai MH. 2008. Cross-organization process integration in design-build team. Autom Constr. 17(2):151–162.
- Chinowsky P, Diekmann J, Galotti V. 2008. Social network model of construction. J Constr Eng Manage. 134(10):804–812.
- Daly EM, Haahr M. 2007. Social network analysis for routing in disconnected delay-tolerant MANETs. Proceedings of the 8th ACM International Symposium on Mobile Ad Hoc Networking and Computing; Sep 9–14; Montréal, Québec, Canada. p. 32–40.
- El Wardani MA, Messner JI, Horman MJ. 2006. Comparing procurement methods for design-build projects. J Constr Eng Manage. 132(3):230–238.
- Elo S, Kyngäs H. 2008. The qualitative content analysis process. J Adv Nurs. 62(1):107–115.
- Fulford R, Standing C. 2014. Construction industry productivity and the potential for collaborative practice. Int J Proj Manage. 32(2):315–326.
- Goodier C, Gibb A. 2007. Future opportunities for offsite in the UK. Constr Manage Econ. 25(6):585–595.
- Hossain L. 2009. Communications and coordination in construction projects. Constr Manage Econ. 27(1):25–39.
- Hosseini MR, Martek I, Zavadskas EK, Aibinu AA, Arashpour M, Chileshe N. 2018. Critical evaluation of off-site construction research: A scientometric analysis. Autom Constr. 87:235–247.
- Hu X, Chong HY, Wang X, London K. 2019. Understanding stakeholders in off-site manufacturing: A literature review. J Constr Eng Manage. 145(8):03119003.
- Huisman M, van Duijn MA. 2011. A reader’s guide to SNA software. In: Scott J, Carrington PJ, editors. The SAGE handbook of social network analysis. London: SAGE Publications; p. 578–600.
- Lam EWM, Chan APC, Chan D. 2004. Benchmarking design-build procurement systems in construction. Benchmarking. 11(3):287–302.
- Lee CY, Chong HY, Liao PC, Wang X. 2018. Critical review of social network analysis applications in complex project management. J Manage Eng. 34(2):04017061.
- London K, Pablo Z. 2017. An actor-network theory approach to developing an expanded conceptualization of collaboration in industrialized building housing construction. Constr Manage Econ. 35(8-9):553–577.
- Lopez R, Chong HY, Moon S, Wang X. 2017. Case study on subcontracting arrangements in the scaffolding supply chain of a Liquefied Natural Gas infrastructure project. J Civil Eng Manage. 23(8):1136–1147.
- Love PED, Skitmore M, Earl G. 1998. Selecting a suitable procurement method for a building project. Constr Manage Econ. 16(2):221–233.
- Luo J, Zhang H, Sher W. 2017. Insights into architects’ future roles in off-site construction. CEB. 17(1):107–120.
- Mao C, Shen Q, Pan W, Ye K. 2015. Major barriers to off-site construction: the developer’s perspective in China. J Manage Eng. 31(3):04014043.
- Nahmens I, Bindroo V. 2011. Is customization fruitful in industrialized homebuilding industry? J Constr Eng Manage. 137(12):1027–1035.
- O’Connor JT, O’Brien WJ, Choi JO. 2016. Industrial project execution planning: modularization versus stick-built. Pract Period Struct Des Constr. 21(1):04015014.
- Othman MZ, Nawi MNM, Nifa FAA, Yaakob M, Rofie K, Zan ZM, Pozin M. 2016. A strategy towards team integration practice for improving the design and construction process in the Malaysian industrialized building projects. Int Rev Manage Mark. 6(S8):226–229.
- Otte E, Rousseau R. 2002. Social network analysis: a powerful strategy, also for the information sciences. J Inf Sci. 28(6):441–453.
- Pan W, Gibb AGF, Dainty A. 2008. Leading UK housebuilders’ utilization of offsite construction methods. Build Res Info. 36(1):56–67.
- Pryke SD. 2005. Towards a social network theory of project governance. Constr Manage Econ. 23(9):927–939.
- Rumane AR, editor. 2016. Construction management delivery system. In: Handbook of construction management, scope, schedule, and cost control. Boca Raton: CRC Press; p. 43–65.
- Said H. 2015. Prefabrication best practices and improvement opportunities for electrical construction. J Constr Eng Manage. 141(12):04015045.
- Tam VWY, Fung IWH, Sing MCP, Ogunlana SO. 2015. Best practice of prefabrication implementation in the Hong Kong public and private sectors. J Cleaner Prod. 109:216–231.
- Zheng X, Le Y, Chan APC, Hu Y, Li Y. 2016. Review of the application of social network analysis (SNA) in construction project management research. Int J Proj Manage. 34(7):1214–1225.