239
Views
2
CrossRef citations to date
0
Altmetric
Articles

Marginalization of end-user stakeholder’s in public private partnership road projects in Nigeria

, , , , &

References

  • Abdel Aziz AM. 2007. Successful delivery of public-private partnerships for infrastructure development. J Constr Eng Manage. 133(12):918–931.
  • Abdullahi BC, Aziz AW. 2010. Nigeria’s housing policy and public-private partnership (PPP) strategy: reflections in achieving home ownership for low-income group in Abuja, Nigeria. In: 22nd International Housing Conference, ENHR; p. 4–7.
  • Akintoye A, Liyanage CL, Renukappa S. 2011. ARCOM doctoral workshop. Proceedings on Public Private Partnerships; Oct 12; United Kingdom: University of Central Lancashire.
  • Al-Saadi R, Abdou A. 2016. Factors critical for the success of public‒private partnerships in UAE infrastructure projects: experts’ perception. Int J Constr Manage. 16(3):234–248.
  • Amadi C, Carrillo P, Tuuli M. 2014. Stakeholder management in public private partnership projects in Nigeria: Towards a research agenda. In: Raiden AB, Aboagye-Nimo E, editors. Proceedings of the 30th Annual ARCOM Conference; Sep 1–3; Portsmouth (UK): Association of Researchers in Construction Management. p. 423–432.
  • Ament R, Begley J, Powell S, Stoy P. 2014. Roadside vegetation and soils on federal lands-evaluation of the potential for increasing carbon capture and storage and decreasing carbon emissions. Contract Number: DTFH68-07-E-00045. Available from: http://www.westerntransportationinstitute.org/documents/reports/4W3748_Final_Report.pdf.
  • Amoako C, Cobbinah PB, Niminga-Beka R. 2014. Urban infrastructure design and pedestrian safety in the Kumasi Central Business District, Ghana. J Transp Saf Secur. 6(3):235–256.
  • Anastasopoulos PC, Mannering FL. 2011. An empirical assessment of fixed and random parameter logit models using crash- and non-crash-specific injury data. Accid Anal Prev. 43(3):1140–1147.
  • Antipova A, Wilmot C. 2012. Alternative approaches for reducing congestion in Baton Rouge, Louisiana. J Transp Geogr. 24:404–410.
  • Anwar T, Liu C, Vu HL, Islam MS. 2016. Tracking the evolution of congestion in dynamic urban road networks. Proceedings of the 25th ACM International on Conference on Information and Knowledge Management; Oct 24–28; Indianapolis, USA; p. 2323–2328. ACM.
  • Awodele OA, Ogunlana SO, Akinradewo OF. 2012. Evaluation of public private partnership (ppp) as alternative procurement route for infrastructure development: case of Nigeria mega city. West Africa Built Environment Research (WABER) Conference; Jul 24–26, Abuja, Nigeria, Vol. 1, p. 329.
  • Babatunde SO, Perera S, Zhou L, Udeaja C. 2016. Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria. Built Environ Project Asset Manage. 6(1):74–91.
  • Balaban O. 2012. The negative effects of construction boom on urban planning and environment in Turkey: unraveling the role of the public sector. Habitat Int. 36(1):26–35.
  • Bekheet W. 2014. Short term performance and effect of speed humps on pavement condition of Alexandria Governorate roads. Alex Eng J. 53(4):855–861.
  • Caliendo C, De Guglielmo ML, Guida M. 2013. A crash-prediction model for road tunnels. Accid Anal Prev. 55:107–115.
  • Celik T. 2014. Developing a building construction associated social cost estimation system for Turkish construction industry [Doctoral dissertation]. University of Salford, Manchester, United Kingdom.
  • Cena LG, Keren N, Li W, Carriquiry AL, Pawlovich MD, Freeman SA. 2011. A Bayesian assessment of the effect of highway bypasses in Iowa on crashes and crash rate. J Saf Res. 42(4):241–252.
  • Chang Y-N, Lin L-H, Chen W-H, Liao H-Y, Hu P-H, Chen S-F, Fu S-H, Chang J, Peng Y-C. 2010. Quality control work group focusing on practical guidelines for improving safety of critically ill patient transportation in the emergency department. J Emerg Nurs. 36(2):140–145.
  • Cheung E. 2009. Developing a Best Practice Framework for Implementing Public Private Partnerships (PPP) in Hong Kong [PhD Thesis]. Australia: Queensland University of Technology.
  • Cheung E, Chan AP, Kajewski S. 2010. Suitability of procuring large public works by PPP in Hong Kong. Eng Const Arch Manage. 17(3):292–308.
  • Chung D, Hensher DA, Rose JM. 2010. Toward the betterment of risk allocation: investigating risk perceptions of Australian stakeholder groups to public–private-partnership toll road projects. Res Transp Econ. 30(1):43–58.
  • Dirección General de Tráfico (DGT). 2013. Las principales cifras de la siniestralidad vial. España 2012.
  • Downs J, Horner M, Loraamm R, Anderson J, Kim H, Onorato D. 2014. Strategically locating wildlife crossing structures for Florida panthers using maximal covering approaches. Transactions in GIS. 18(1):46–65.
  • Egan AN, Schlueter J, Spooner DM. 2012. Applications of next-generation sequencing in plant biology. Am J Bot. 99(2):175–185.
  • El-Gohary NM, Osman H, El-Diraby TE. 2006. Stakeholder management for public private partnerships. Int J Project Manage. 24(7):595–604.
  • Elias W, Shiftan Y. 2011. The safety impact of land use changes resulting from bypass road constructions. J Transp Geogr. 19(6):1120–1129.
  • Elvik R. 2012. Speed limits, enforcement, and health consequences. Annu Rev Public Health. 33:225–238.
  • Eskerod P, Jepsen AL. 2013. Project stakeholder management. Great Britain: Gower Publishing, Ltd.
  • Ewing R, Meakins G, Bjarnson G, Hilton H. 2011. Transportation and land use. In: Danneberg AL, Frumkin H, Jackson RJ, editors. Making healthy places. Washington, D.C., United States: Island Press/Center for Resource Economics; p. 149–169.
  • Ferguson A. 2012. Qualitative evaluation of transportation construction related social costs and their impacts on the local community [MSc Thesis]. Arlington, Texas, USA: The University of Texas at Arlington.
  • Field A. 2013. Discovering statistics using IBM SPSS statistics. London, UK: Sage.
  • Gagnon JW, Dodd NL, Ogren KS, Schweinsburg RE. 2011. Factors associated with use of wildlife underpasses and importance of long‐term monitoring. J Wildlife Manage. 75(6):1477–1487.
  • Gangolells M, Casals M, Forcada N, Macarulla M, Cuerva E. 2016. Energy mapping of existing building stock in Spain. J Clean Prod. 112:3895–3904.
  • George D, Mallery M. 2003. Using SPSS for Windows step by step: a simple guide and reference. 4th ed. London: Pearson.
  • Gomez J, Vassallo JM, Herraiz I. 2016. Explaining light vehicle demand evolution in interurban toll roads: a dynamic panel data analysis in Spain. Transportation. 43(4):677–703.
  • Gregory R, Fischhoff B, Thorne S, Butte G. 2003. A multi-channel stakeholder consultation process for transmission deregulation. Energy Policy. 31(12):1291–1299.
  • Gunnigan L, Rajput R. 2010. Comparison of Indian PPP Construction Industry and European PPP Construction Industry: Process, Thresholds and Implementation. Proceedings of CIB WORLD CONGRESS 2010, Salford. [accessed 2015 Jan 12]. http://arrow.dit.ie/cgi/viewcontent.cgi?article=1002andcontext=beschconcon.
  • Gupta A, Agrawal S. 2013. Greenfield airport development in India: A case study of Bangalore international airport. [Accessed 2015 Jan 4]. http://papers.ssrn.com/sol3/papers.cfm?abstract_id=2311993.
  • Hill C, Jones G. 2007. Strategic management: an integrated approach. Ohio, USA: Cengage Learning.
  • Hunt DVL, Nash D, Rogers CDF. 2014. Sustainable utility placement via multi-utility tunnels. Tunnel Undergr Space Technol. 39:15–26.
  • Hsueh CM, Chang LM. 2017. Critical success factors for PPP infrastructure: perspective from Taiwan. J Chin Inst Eng. 40(5):370–377.
  • Ibem EO. 2011. Public-private partnership (PPP) in housing provision in Lagos Megacity region, Nigeria. Int J Housing Policy. 11(2):133–154.
  • Ibrahim AD, Price ADF, Dainty ARJ. 2009. Evaluation of key practices under the Local Improvement Finance Trust (LIFT) initiative for UK healthcare facilities. Eng Constr Archit Manage. 16(5):504–518.
  • Islam MT, El-Basyouny K. 2013. An integrated speed management plan to reduce vehicle speeds in residential areas: implementation and evaluation of the silverberry action plan. J Saf Res. 45:85–93.
  • Jenelius E, Koutsopoulos HN. 2013. Travel time estimation for urban road networks using low frequency probe vehicle data. Transport Res Part B Methodol. 53:64–81.
  • Kennedy CA, Stewart I, Facchini A, Cersosimo I, Mele R, Chen B, Uda M, Kansal A, Chiu A, Kim K-G, et al. 2015. Energy and material flows of megacities. Proc Natl Acad Sci USA. 112(19):5985–5990.
  • Knoeri C, Steinberger JK, Roelich K. 2016. End-user centred infrastructure operation: towards integrated end-use service delivery. J Clean Prod. 132:229–239.
  • Lafargeholcim. 2018. Murtala Mohammed international airport road project expands with help from Lafarge Africa Lafarge Holcim Worldwide. [Accessed 2020 Feb 13]. https://www.lafargeholcim.com/murtala-mohammed-airport-road-project-nigeria.
  • Lakshmanan TR. 2011. The broader economic consequences of transport infrastructure investments. J Transp Geogr. 19(1):1–12.
  • Leong N. 2012. The open road and the traffic stop: narratives and counter-narratives of the American dream. Fla L Rev. 64:305.
  • Leong CH, Liu JH. 2013. Whither multiculturalism? Global identities at a cross-roads. Int J Intercult Relat. 37(6):657–662.
  • Lesbarreres D, Fahrig L. 2012. Measures to reduce population fragmentation by roads: what has worked and how do we know? Trends Ecol Evol (Amst). 27(7):374–380.
  • Iossa, Martimort. 2016. Corruption in PPPs, incentives and contract incompleteness. Int J Indus Organ. 44:85–100.
  • Li J, Zou PX. 2011. Fuzzy AHP-based risk assessment methodology for PPP projects. J Constr Eng Manage. 137(12):1205–1209.
  • Lim G, Ahn H, Lee H. 2005. Formulating strategies for stakeholder management: a case-based reasoning approach. Expert Syst App. 28(4):831–840.
  • Loon JV, Frank L. 2011. Urban form relationships with youth physical activity: implications for research and practice. CPL Bibliogr. 26(3):280–308.
  • Lv X, El-Gohary N. 2016. Text analytics for supporting stakeholder opinion mining for large-scale highway projects. Procedia Eng. 145:518–524.
  • Majamaa W, Junnila S, Doloi H, Niemostö E. 2008. End-user oriented public-private partnerships in real estate industry. Int J Strateg Prop Manage. 12 (1):1–17.
  • Marinelli M, Petroutsatou K, Fragkakis N, Lambropoulos S. 2018. Rethinking new public infrastructure value for money in recession times: the Greek case. Int J Constr Manage. 18(4):331–342.
  • Matthews JC, Allouche EN, Sterling RL. 2015. Social cost impact assessment of pipeline infrastructure projects. Environ Impact Assess Rev. 50:196–202.
  • Mills BN, Andrey J, Hambly D. 2011. Analysis of precipitation-related motor vehicle collision and injury risk using insurance and police record information for Winnipeg, Canada. J Saf Res. 42(5):383–390.
  • Moriyama Y, Mitsuhashi M, Hirai S, Oguchi T. 2011. The effect on lane utilization and traffic capacity of adding an auxiliary lane. Procedia Social Behav Sci. 16:37–47.
  • Mostafa MA, El-Gohary NM. 2014. Stakeholder-sensitive social welfare–oriented benefit analysis for sustainable infrastructure project development. J Constr Eng Manage. 140(9):04014038.
  • Muhammad Z, Johar F. 2019. Critical success factors of public–private partnership projects: a comparative analysis of the housing sector between Malaysia and Nigeria. Int J Constr Manage. 19(3):257–269.
  • Nicolaisen MS. 2012. Forecasts: fact or fiction? Uncertainty and inaccuracy in transport project evaluation [Doctoral dissertation]. Aalborg: Aalborg University.
  • Norton SD, Blanco L. 2009. Public-private partnerships: a comparative study of new public management and stakeholder participation in the UK and Spain. Int J Public Policy. 4(3/4):214–231.
  • Nunnally JC, Bernstein IH. 1994. Psychometric theory. New York: McGraw-Hill.
  • Nwoye CF, Oni SI. 2016. An assessment of the carrying capacity of Lagos metropolitan roads: a case study of mile2-Apapa and Lekki-Epe Corridors. Arts Soc Sci J. 7(1):1–8.
  • Obeng-Atuah D, Poku-Boansi M, Cobbinah PB. 2017. Pedestrian crossing in urban Ghana: safety implications. J Transp Health. 5:55–69.
  • Odeck J. 2013. How accurate are national road traffic growth-rate forecasts?—The case of Norway. Transp Policy. 27:102–111.
  • Olander S. 2007. Stakeholder impact analysis in construction project management. Constr Manage Econ. 25(3):277–287.
  • Olson B, Swenson D. 2011. Overtime effects on project team effectiveness. In: The Midwest Instruction and Computing Symposium, (MICS 2011); Apr 8–9; Duluth, Minnesota, USA.
  • Olusola Babatunde S, Opawole A, Emmanuel Akinsiku O. 2012. Critical success factors in public-private partnership (PPP) on infrastructure delivery in Nigeria. J Facil Manag. 10(3):212–225.
  • Osei V. 2013. The construction industry and its linkages to the Ghanaian economy–polices to improve the sector’s performance. Int J Develop Econ Sustain. 1(1):56–72.
  • Oviedo-Trespalacios O, Haque MM, King M, Washington S. 2017. Self-regulation of driving speed among distracted drivers: an application of driver behavioral adaptation theory. Traffic Injury Prevent. 18(6):599–605.
  • Oyedele LO. 2013. Avoiding performance failure payment deductions in PFI/PPP projects: model of critical success factors. J Perform Constr Facil. 27(3):283–294.
  • Pallant J. 2013. SPSS survival manual: a step by step guide to data analysis using IBM SPSS (5. uppl.). Maidenhead: McGraw-Hill.
  • Penz P, Drydyk J, Bose PS. 2011. Displacement by development: ethics, rights and responsibilities. Cambridge: Cambridge University Press.
  • Persaud B, Lan B, Lyon C, Bhim R. 2010. Comparison of empirical Bayes and full Bayes approaches for before-after road safety evaluations. Accid Anal Prev. 42(1):38–43.
  • Poole RW. Jr, 2000. Commercializing highways. Inst Public Affairs Rev. 52(4):9–10.
  • Qi Y, Srinivasan R, Teng H, Baker R. 2013. Analysis of the frequency and severity of rear-end crashes in work zones. Traffic Inj Prev. 14(1):61–72.
  • Queiroz C, Astesiano G, Serebrisky T. 2014. An overview of the Brazilian PPP experience from a stakeholders’ viewpoint. Washington, D.C., United States: Inter-American Development Bank.
  • Rangel T, Vassallo JM. 2013. Do public private partnerships improve road safety? The case of toll concessions in Spain. Transportation Research Board 92nd Annual Meeting (No. 13-0361); Jan 13–17; Washington, D.C., USA.
  • Sev A. 2011. A comparative analysis of building environmental assessment tools and suggestions for regional adaptations. Civil Eng Environ Syst. 28(3):231–245.
  • Shull AC, Church AH, Warner Burke W. 2014. Attitudes about the field of organization development 20 years later: the more things change, the more they stay the same. In: Research in organizational change and development; p. 1–28. Emerald Group Publishing Limited.
  • Smyth H, Edkins A. 2007. Relationship management in the management of PFI/PPP projects in the UK. Int J Project Manage. 25(3):232–240.
  • Sopha BM, Klöckner CA, Hertwich EG. 2013. Adoption and diffusion of heating systems in Norway: coupling agent-based modeling with empirical research. Environ Innov Soc Trans. 8:42–61.
  • Spector P. 2015. Summated rating scale construction: an introduction. London: Sage Publications.
  • Tabachnick BG, Fidell LS. 2007. Multivariate analysis of variance and covariance. Using multivariate statistics. 3:402–407.
  • Trochim W, Donnelly JP, Arora K. 2015. Research methods: the essential knowledge base. Nelson Education.
  • Ullah F, Thaheem MJ. 2018. Concession period of public private partnership projects: industry–academia gap analysis. Int J Constr Manage. 18(5):418–429.
  • Verhetsel A, Kessels R, Goos P, Zijlstra T, Blomme N, Cant J. 2015. Location of logistics companies: a stated preference study to disentangle the impact of accessibility. J Transp Geogr. 42:110–121.
  • Xiao R, Harrison C, Hudson SE. 2013. WorldKit: rapid and easy creation of ad-hoc interactive applications on everyday surfaces. In: Proceedings of the SIGCHI Conference on Human Factors in Computing Systems; p. 879–888. ACM.
  • Yuan J, Skibniewski MJ, Li Q, Zheng L. 2010. Performance objectives selection model in public-private partnership projects based on the perspective of stakeholders. J Manage Eng. 26(2):89–104.
  • Zawawi NAWA, Ahmad M, Umar AA, Khamidi MF, Idrus A. 2014. Financing PF2 projects: opportunities for Islamic project finance. Procedia Eng. 77:179–187.
  • Zitron J. 2006. Public–private partnership projects: towards a model of contractor bidding decision-making. J Purch Supply Manage. 12(2):53–62.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.