1,074
Views
12
CrossRef citations to date
0
Altmetric
Articles

Machine learning model for delay risk assessment in tall building projects

, &

References

  • Abd El-Razek ME, Bassioni HA, Mobarak AM. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841.
  • Aibinu AA, Odeyinka HA. 2006. Construction delays and their causative factors in Nigeria. J Constr Eng Manage. 132(7):667–677.
  • Akande KO, Owolabi TO, Olatunji SO. 2015. Investigating the effect of correlation-based feature selection on the performance of support vector machines in reservoir characterization. J Nat Gas Sci Eng. 22:515–522.
  • AlSehaimi A, Koskela L, Tzortzopoulos P. 2013. Need for alternative research approaches in construction management: case of delay studies. J Manage Eng. 29(4):407–413.
  • Assaf SA, Al-Khalil M, Al-Hazmi M. 1995. Causes of delay in large building construction projects. J Manage Eng. 11(2):45–50.
  • Attal A. 2010. Development of neural network models for prediction of highway construction cost and project duration [Doctoral dissertation]. Ohio University.
  • Aziz RF, Abdel-Hakam AA. 2016. Exploring delay causes of road construction projects in Egypt. Alexandria Eng J. 55(2):1515–1539.
  • Bayram S. 2017. Duration prediction models for construction projects: In terms of cost or physical characteristics? KSCE J Civ Eng. 21(6):2049–2060.
  • Benzécri JP. 1973. L’analyse des données. Vol. 2. Paris: Dunod; p. l.
  • Brownlee J. 2018. Machine learning mastery with Weka. https://machinelearningmastery.com/machinelearning-mastery-weka/.
  • Budayan C, Dikmen I, Talat Birgonul M, Ghaziani A. 2018. A computerized method for delay risk assessment based on fuzzy set theory using MS ProjectTM. KSCE J Civ Eng. 22(8):2714–2712.
  • Choi S, Kim YJ, Briceno S, Mavris D. 2016. Prediction of weather-induced airline delays based on machine learning algorithms. In 2016 IEEE/AIAA 35th Digital Avionics Systems Conference (DASC). IEEE. p. 1–6.
  • Cortes C, Vapnik V. 1995. Support-vector networks. Mach Learn. 20(3):273–297.
  • CTBUH. 2014. Dreams deferred: unfinished tall buildings. CTBUH J. 4:46–47.
  • Czarnigowska A, Sobotka A. 2014. Estimating construction duration for public roads during the preplanning phase. EPPM-J. 4(1):26–35.
  • Darko A, Chan AP, Adabre MA, Edwards DJ, Hosseini MR, Ameyaw EE. 2020. Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities. Autom Constr. 112:103081.
  • Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analysing factors affecting delays in Indian construction projects. Int J Project Manage. 30(4):479–489.
  • El-Kholy AM. 2019. Exploring the best ANN model based on four paradigms to predict delay and cost overrun percentages of highway projects. Int J Constr Manage. :1–19.
  • Enshassi A, Al‐Najjar J, Kumaraswamy M. 2009. Delays and cost overruns in the construction projects in the Gaza Strip. J Fin Man Prop Cons. 14(2):126–151.
  • Faridi AS, El‐Sayegh SM. 2006. Significant factors causing delay in the UAE construction industry. Constr Manage Econ. 24(11):1167–1176.
  • Fellows RF, Liu AM. 2015. Research methods for construction. West Sussex (UK): Wiley.
  • Fix E, Hodges J. 1951. Discriminatory analysis, nonparametric discrimination: Consistency properties. Texas: USAF School of Aviation Medicine, Randolph Field. Technical Report 4.
  • Fugar FD, Agyakwah-Baah AB. 2010. Delays in building construction projects in Ghana. CEB. 10(1/2):103.
  • García de Soto B, Agustí-Juan I, Joss S, Hunhevicz J. 2019. Implications of Construction 4.0 to the workforce and organizational structures. Int J Constr Manage. :1–13.
  • Gondia A, Siam A, El-Dakhakhni W, Nassar AH. 2020. Machine learning algorithms for construction projects delay risk prediction. J Constr Eng Manage. 146(1):04019085.
  • Gündüz M, Nielsen Y, Özdemir M. 2013. Quantification of delay factors using the relative importance index method for construction projects in Turkey. J Manage Eng. 29(2):133–139.
  • Gunduz M, Nielsen Y, Ozdemir M. 2015. Fuzzy assessment model to estimate the probability of delay in Turkish construction projects. J Manage Eng. 31(4):04014055.
  • Hossen MM, Kang S, Kim J. 2015. Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nucl Eng Technol. 47(3):362–379.
  • International Organization for Standardization Technical Committee. 2018. Risk management-guidelines (Standard No. ISO 31000: 2018). Washington, DC: International Organization for Standardization.
  • Kaming PF, Olomolaiye PO, Holt GD, Harris FC. 1997. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr Manage Econ. 15(1):83–94.
  • Kim S-Y, Tuan NV, Ogunlana SO. 2009. Quantifying schedule risk in construction projects using Bayesian belief networks. Int J Project Manage. 27(1):39–50.
  • Kim YJ, Choi S, Briceno S, Mavris D. 2016. A deep learning approach to flight delay prediction. In 2016 IEEE/AIAA 35th Digital Avionics Systems Conference (DASC). IEEE. p. 1–6.
  • Kuncheva LI, Rodríguez JJ. 2014. A weighted voting framework for classifiers ensembles. Knowl Inform Syst. 38(2):259–275.
  • Larrañaga P, Atienza D, Diaz-Rozo J, Ogbechie A, Puerto-Santana CE, Bielza C. 2018. Industrial applications of machine learning. Boca Raton (FL): CRC Press.
  • Lek S, Guégan JF. 1999. Artificial neural networks as a tool in ecological modelling, an introduction. Ecol Model. 120(2–3):65–73.
  • Lo TY, Fung IW, Tung KC. 2006. Construction delays in Hong Kong civil engineering projects. J Constr Eng Manage. 132(6):636–649.
  • Mahamid I, Bruland A, Dmaidi N. 2012. Causes of delay in road construction projects. J Manage Eng. 28(3):300–310.
  • McCulloch WS, Pitts W. 1943. A logical calculus of the ideas immanent in nervous activity. Bull Math Biophys. 5(4):115–133.
  • Moon KS. 2015. Supertall Asia/Middle East: Technological responses and contextual impacts. Buildings. 5(3):814–833.
  • Muneeswaran G, Manoharan P, Awoyera PO, Adesina A. 2018. A statistical approach to assess the schedule delays and risks in Indian construction industry. Int J Constr Manage. :1–12.
  • Ogunlana SO, Promkuntong K, Jearkjirm V. 1996. Construction delays in a fast-growing economy: comparing Thailand with other economies. Int J Project Manage. 14(1):37–45.
  • Olatunji SO. 2017. Extreme learning machines and support vector machines models for email spam detection. In Canadian Conference on Electrical and Computer Engineering. IEEE. p. 1–6.
  • Peško I, Mučenski V, Šešlija M, Radović N, Vujkov A, Bibić D, Krklješ M. 2017. Estimation of costs and durations of construction of urban roads using ANN and SVM. Complexity. 2017:1–13.
  • PricewaterhouseCoopers. 2017. Innovation for the earth. Davos: World Economic Forum. Technical Report 161222-113251-LA-OS.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Project Manage. 25(5):517–526.
  • Sanni-Anibire MO, Mohamad Zin R, Olatunji SO. 2020. Causes of delay in the global construction industry: a meta analytical review. Int J Constr Manage. 1–13.
  • Sethi H, Goraya A, Sharma V. 2017. Artificial intelligence based ensemble model for diagnosis of diabetes. Int J Adv Res Comp Sci. 8(5):1540–1548.
  • Sweis G, Sweis R, Abu Hammad A, Shboul A. 2008. Delays in construction projects: The case of Jordan. Int J Project Manage. 26(6):665–674.
  • Takeichi N, Kaida R, Shimomura A, Yamauchi T. 2017. Prediction of delay due to air traffic control by machine learning. In AIAA Modeling and Simulation Technologies Conference. p. 1323.
  • Tharwat A. 2018. Classification assessment methods. Appl Comput Inf. 1–13.
  • Toor S-U-R, Ogunlana S. 2008. Problems causing delays in major construction projects in Thailand. Constr Man Econ. 26(4):395–408.
  • Tumi SAH, Omran A, Pakir AHK. 2009. Causes of delay in construction industry in Libya. In: The International Conference on Economics and Administration; p. 265–272.
  • Wauters M, Vanhoucke M. 2017. A nearest neighbour extension to project duration forecasting with artificial intelligence. Eur J Oper Res. 259(3):1097–1111.
  • Witten IH, Frank E, Hall MA. 2011. Data mining: practical machine learning tools and techniques. Burlington, Massachusetts, USA: Morgan Kaufmann Publishers.
  • Wu X, Kumar V, Quinlan JR, Ghosh J, Yang Q, Motoda H, McLachlan GJ, Ng A, Liu B, Yu PS, et al. 2008. Top 10 algorithms in data mining. Knowl Inform Syst. 14(1):1–37.
  • Xia R, Zong C, Li S. 2011. Ensemble of feature sets and classification algorithms for sentiment classification. Inf Sci. 181(6):1138–1152.
  • Yaghini M, Khoshraftar MM, Seyedabadi M. 2013. Railway passenger train delay prediction via neural network model. J Adv Transp. 47(3):355–368.
  • Yu B, Song X, Guan F, Yang Z, Yao B. 2016. k-Nearest neighbor model for multiple-time-step prediction of short-term traffic condition. J Transp Eng. 142(6):04016018.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.