Applying lean construction principles in road maintenance planning and scheduling

, , &

References

  • Agbulos A, Mohamed Y, Al-Hussein M, AbouRizk S, Roesch J. 2006. Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. J Constr Eng Manage. 132 (3):291–299.
  • Alberta Ministry of Transportation. 2006. Guidelines for assessing pavement preservation treatments and strategies. Alberta Infrastructure and Transportation. [accessed 2018 Dec 1]. http://www.transportation.alberta.ca/Content/docType233/Production/gappts.pdf.
  • Arbulu RJ, Tommelein ID. 2002. Value stream analysis of construction supply chains: case study on pipe supports used in power plants. 10th Annual Conference of the International Group for Lean Construction; Proceedings IGLC-10; Aug 6–8; Gramado, Brazil. p. 183–195.
  • Amador L, Magnuson S. 2011. Adjacency modeling for coordination of investments in infrastructure asset management: case study of Kindersley, Saskatchewan, Canada. Transp Res Rec. 2246(1):8–15.
  • American Society of Civil Engineers (ASCE). 2017. 2017 report card for America’s infrastructure. [accessed 2018 Aug 22]. http://www.infrastructurereportcard.org.
  • Aziz RF, Hafez SM. 2013. Applying lean thinking in construction and performance improvement. Alexandria Eng J. 52(4):679–695.
  • Ballard G. 2001. Cycle time reduction in home building. In: Ballard G, Chua D, editors. 9th Annual Conference of the International Group for Lean Construction; Aug 6–8; National University of Singapore, Singapore. p. 6–8.
  • Ballard G, Harper N, Zabelle T. 2003. Learning to see work flow: an application of lean concepts to precast concrete fabrication. Eng Constr Arch Manage. 10(1):6–14.
  • Bashir AM, Suresh S, Proverbs D, Gameson R. 2011. A critical, theoretical, review of the impacts of lean construction tools in reducing accidents on construction sites. Proceedings of 27th Annual ARCOM Conference, Bristol, UK, Association of Researchers in Construction Management; September; p. 5–7.
  • Ben-Alon L, Sacks R. 2017. Simulating the behavior of trade crews in construction using agents and building information modeling. Autom Constr. 74:12–27.
  • Canadian Infrastructure Report Card (CIRC). 2012. Canadian infrastructure report card, municipal roads and water systems. [accessed 2018 Dec 1] http://www.canadainfrastructure.ca.
  • Cho S, Ballard G. 2011. Last planner and integrated project delivery. Lean Constr J. 67–78.
  • Dave B, Kubler S, FräMling K, Koskela L. 2016. Opportunities for enhanced lean construction management using internet of things standards. Autom Constr. 61:86–97.
  • De Jong SJ, Beelaerts van Blokland WW. 2016. Measuring lean implementation for maintenance service companies. Lean Six Sigma J. 7(1):35–61.
  • Deshpande AS, Filson LE, Salem OM, Miller RA. 2012. Lean techniques in the management of the design of an industrial project. J Manage Eng. 28(2):221–223.
  • Diekmann JE, Balonick J, Krewedl M, Troendle L. 2003. Measuring lean conformance. 11th Annual Conference of the International Group for Lean Construction; Jul 22–24; Virginia Polytechnic and State University, USA.
  • Duran O, Capaldo A, Duran Acevedo PA. 2017. Lean maintenance applied to improve maintenance efficiency in thermoelectric power plants. Energies. 10(10):1653.
  • Elbagalati O, Elseifi MA, Gaspard K, Zhang Z. 2018. Development of an enhanced decision-making tool for pavement management using a neural network pattern-recognition algorithm. J Transp Eng Part B Pavements. 144(2):04018018.
  • Emiliani ML, Stec DJ. 2005. Leaders lost in transformation. Leadership Org Dev J. 26(5):370–387.
  • Emmitt S. 2014. Design management for architects. John Wiley & Sons.
  • Faghih-Imani A, Amador-Jimenez L. 2013. From strategic optimization to tactical plans: coordinating treatments of road infrastructure. 92th Annual meeting of the Transportation Research Board of the National Academies, No.13-0632; Jan 13–17; Washington, DC, USA.
  • Fewings P. 2013. Construction project management: an integrated approach. New York: Routledge.
  • Flynn JR, Vlok PJ. 2015. Lean approaches in asset management within the mining industry. In: Amadi-Echendu J, Hoohlo C, Mathew J, editors. 9th WCEAM Research Papers. Lecture Notes in Mechanical Engineering. Cham: Springer; p. 101–118. DOI: 10.1007/978-3-319-15536-4_9.
  • Frost MR, Lithgow CM. 1998. Future trends in performance based contracting-legal and technical perspectives. ARRB Transport Research Ltd Conference; 19th, 1998; Sydney, New South Wales, Australia.
  • Galenko A, Perrone E, Scheingberg T. 2015. Project coordination model. Procedia Comput Sci. 52:83–89.
  • Government of New Brunswick. 2012. Capital maintenance of highways, chapter 5, New Brunswick Department of Transportation and Infrastructure. [accessed 2018 Dec 1]. http://www2.gnb.ca/content/gnb/en.html.
  • Green SD, May SC. 2005. Lean construction: arenas of enactment, models of diffusion and the meaning of leanness. Build Res Inf. 33(6):498–511.
  • Hammond J, Choo HJ, Austin S, Tommelein ID, Ballard G. 2000. Integrating design planning, scheduling, and control with DePlan. 8th Annual Conference of the International Group for Lean Construction; Jul 17–19; Brighton, United Kingdom.
  • Hamzeh F, Kallassy J, Lahoud M, Azar R. 2016. The first extensive implementation of lean and LPS in Lebanon: results and reflections. 24th Annual Conference of the International Group for Lean Construction; Jul 20–22; Boston, USA.
  • Howell J. 2014. Lean construction. Public Infrastruct Bul. 1(9):5.
  • Huber B, Reiser P. 2003. The marriage of CPM and lean construction. 11th Annual Conference of the International Group for Lean Construction; Jul 22–24; Virginia Polytechnic and State University, USA.
  • Kenley R. 2004. Project micro-management: practical site planning and management of work flow. 12th Annual Conference of the International Group for Lean Construction; Aug 3–5; Helsingor, Denmark.
  • Khadka M, Paz A. 2017. Comprehensive clusterwise linear regression for pavement management systems. J Transp Eng Part B Pavements. 143(4):04017014.
  • Kordestani Ghalenoeei N, Saghatforoush E, Athari Nikooravan H, Preece C. 2018. Evaluating solutions to facilitate the presence of operation and maintenance contractors in the pre-occupancy phases: a case study of road infrastructure projects. Int J Constr Manage. DOI: 10.1080/15623599.2018.1512027.
  • Koskela L. 1992. Application of the new production philosophy to construction. Stanford (CA): Center for Integrated Facility Engineering.
  • Koskela L. 2000. An exploration towards a production theory and its application to construction. VTT Technical Research Centre of Finland.
  • Koskela L, Howell G, Ballard G, Tommelein I. 2002. The foundations of lean construction. In: Best R, De Valence G, editors. Design and construction: building in value. Oxford, UK: Butterworth-Heinemann, p. 221–225.
  • Kung D, Alex DP, Al-Hussein M, Fernando S. 2008. Application of lean thinking to improve the productivity of water and sewer service installations. Can J Civ Eng. 35(4):418–430.
  • Lee EB, Ibbs CW, Thomas D. 2005. Minimizing total cost for urban freeway reconstruction with integrated construction/traffic analysis. J Infrastruct Syst. 11(4):250–257.
  • Liker J. 2004. The Toyota way: 14 management principles from the world’s greatest manufacturer. [Electronic version]. New York: McGraw-Hill.
  • Liu M, Ballard G. 2009. Factors affecting work flow reliability - a case study. In: Cuperus Y, Hirota EH, editors. 17th Annual Conference of the International Group for Lean Construction; Jul 15–17; Taipen, Taiwan. p. 177–186.
  • Miquel S, Condron J. 1991. Assessment of road maintenance by contract. Infrastructure and Urban Development Department technical paper; no. INU 91. Washington, D.C.: World Bank Group. http://documents.worldbank.org/curated/en/799611468767365537/Assessment-of-road-maintenance-by-contract.
  • Mohammadi A, Amador L, Elsaid F. 2019. Simplified pavement performance modelling with only two-time (one-year interval) observations: case study of Montreal Island. J Transp Eng Part B Pavement. 145(4):05019004.
  • Mohammadi A, Igwe C, Amador L, Nasiri F. 2018. Novel asset management framework for road maintenance. Fredericton (Canada): CSCE.
  • Moreira AV, Fwa TF, Oliveira JR, Costa L. 2017. Coordination of user and agency costs using two-level approach for pavement management optimization. Transp Res Rec. 2639(1):110–118.
  • Morgado J, Neves J. 2014. Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. J Constr Eng Manage. 140(11):04014050.
  • Nahmens I, Ikuma LH, Khot D. 2012. Kaizen and job satisfaction-a case study in industrialized homebuilding. Lean Constr J. 91–104.
  • Oh JS, Kim H, Park D. 2011. Bi-objective network optimization for spatial and temporal coordination of multiple highway construction projects. KSCE J Civ Eng. 15(8):1449–1455.
  • Ontario Ministry of Transportation. 2018a. Provincial highways traffic volumes 2016. [accessed 2018 Dec 1]. http://www.raqsa.mto.gov.on.ca/techpubs/TrafficVolumes.nsf/tvweb.
  • Ontario Ministry of Transportation. 2018b. Pavement condition for provincial highways. [accessed 2018 Dec 1]. https://www.ontario.ca/data/pavement-condition-provincial-highways.
  • Ontario Ministry of Transportation. 2013. Pavement design and rehabilitation manual. 2nd edition. [accessed 2018 Dec 1]. www.bv.transports.gouv.qc.ca/mono/1165561.pdf.
  • Ontario Ministry of Transportation. 2016. Southern highways program (2016–2020). [accessed 2018 Dec 1]. http://www.mto.gov.on.ca.
  • Ontario Ministry of Transportation. 2017. Southern highways program (2017–2021). [accessed 2018 Dec 1]. http://www.mto.gov.on.ca.
  • Osman H. 2016. Coordination of urban infrastructure reconstruction projects. Struct Infrastruct Eng. 12(1):108–121.
  • Ramani PV, Lingan LK. 2019. Developing a lean model to reduce the design process cost of gas insulated switchgear foundation using value stream mapping – a case study. Int J Constr Manage. DOI: 10.1080/15623599.2019.1644756.
  • Sacks R, Koskela L, Dave B, Owen R. 2010a. Interaction of lean and building information modeling in construction. J Constr Eng Manage. 136(9):968–980.
  • Sacks R, Radosavljevic M, Barak R. 2010b. Requirements for building information modeling based lean production management systems for construction. Build Inf Model Collab Working Environ. 19(5):641–655.
  • Salem O, Solomon J, Genaidy A, Minkarah I. 2006. Lean construction: from theory to implementation. J Manage Eng. 22(4):168–175.
  • Samudio M, Alves T, da CL, Chambers D. 2011. Employing the principle of ‘going and seeing’ to construction. In: Rooke J, Dave B, editors. 19th Annual Conference of the International Group for Lean Construction; Jul 13–15; Lima, Peru.
  • Santos B, Picado-Santos L, Cavaleiro V. 2005. Road user costs in pavement management systems: methodologies and costs. Proceedings of the Fourth International Conference on Maintenance and Rehabilitation of Pavements and Technological Control; Aug 17–19; Belfast, UK.
  • Shah R, Ward PT. 2007. Defining and developing measures of lean production. J Oper Manage. 25(4):785–805.
  • Skilbrei OB, van Zandvoord W. 2009. Applying LEAN principles to achieve breakthrough performance gains from existing assets. Asia Pacific Oil and Gas Conference & Exhibition. Society of Petroleum Engineers; Aug 4–6; Jakarta, Indonesia. p. 808–811.
  • Sui Pheng L, Shang G, Pheng SL, Shang G. 2011. Bridging western management theories and Japanese management practices: case of the Toyota way model. Emerald Emerg Markets Case Stud. 1(1):1–20.
  • Sultana M, Rahman A, Chowdhury S. 2013. A review of performance-based maintenance of road infrastructure by contracting. Int J Prod Perform Manage. 62(3):276–292.
  • Suresh S, Bashir AM, Olomolaiye PO. 2012. A protocol for lean construction in developing countries. In: Ofori G, editor. Contemporary issues in construction in developing countries. London: Spon Press; p. 376–406.
  • Theiss L, Ullman GL, Moinet A. 2016. Guide to project coordination for minimizing work zone mobility impacts (No. FHWA-HOP-16-013). United States: Federal Highway Administration, Office of Operations.
  • Tommelein ID. 1999. Lean construction experiments using discrete-event simulation: techniques and tools for process re-engineering? Int J Comput-Integrat Design Constr. 1(2):53–63.
  • Van Nierop T. 2017. Improvement in asset management using a lean perspective: The contribution of lean in the maturity models of asset management [master of Science thesis]. Delft University of Technology.
  • Washington State Department of Transportation (WSDOT). 2015. Cost estimating manual for projects, M 3034.03. Engineering and Regional Operations, Development Division, Design Office, SAEO. [accessed 2020 Jun 29]. https://www.wsdot.wa.gov.
  • Wodalski MJ, Thompson BP, Whited G, Hanna AS. 2011. Applying lean techniques in the delivery of transportation infrastructure construction projects. Madison (WI): National Center for Freight and Infrastructure Research and Education (CFIRE) University of Wisconsin-Madison.
  • Womack JP, Jones DT. 2010. Lean thinking: banish waste and create wealth in your corporation. New York: Free Press.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.