900
Views
21
CrossRef citations to date
0
Altmetric
Articles

Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran

, , , &

References

  • Abdelgawad M, Fayek AR. 2010. Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. J Constr Eng Manage. 136(9):1028–1036.
  • Ahmadi M, Behzadian K, Ardeshir A, Kapelan Z. 2016. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. J Civil Eng Manage. 23(2):300–310.
  • Boral S, Howard I, Chaturvedi SK, McKee K, Naikan V. 2020. An integrated approach for fuzzy failure modes and effects analysis using fuzzy AHP and fuzzy MAIRCA. Eng Fail Anal. 108:104195.
  • Chapman C, Ward S. 1996. Project risk management: processes, techniques and insights. Chichester, UK: John Wiley; 344 p.
  • Cheraghi E, Khalilzadeh M, Shojaei S, Zohrehvandi S. 2017. A mathematical model to select the risk response strategies of the construction projects: case study of Saba Tower. Procedia Comput Sci. 121:609–616.
  • Dehnavi A, Aghdam IN, Pradhan B, Varzandeh MHM. 2015. A new hybrid model using step-wise weight assessment ratio analysis (SWARA) technique and adaptive neuro-fuzzy inference system (ANFIS) for regional landslide hazard assessment in Iran. Catena. 135:122–148.
  • Ehsanifar M, Hemesy M. 2019. A new hybrid multi-criteria decision-making model to prioritize risks in the construction process under fuzzy environment (case study: the Valiasr Street underpass project). Int J Constr Manage. 1–16.
  • Farughi H, Alaniazar S, Mousavipour S, Moradi V. 2017. A practical framework based on fuzzy FMEA to diagnose causes of delay in construction projects. J Ind Manage Stud. 15:145–175.
  • Fattahi R, Khalilzadeh M. 2018. Risk evaluation using a novel hybrid method based on FMEA, extended Multimoora, and AHP methods under fuzzy environment. Saf Sci. 102:290–300.
  • Ghoushchi SJ, Yousefi S, Khazaeili M. 2019. An extended FMEA approach based on the Z-MOORA and fuzzy BWM for prioritization of failures. Appl Soft Comput. 81:105505.
  • Hosseinzadeh M, Gheidar Khaljani J. 2013. A review of methods for detecting product design risks. Standard management and quality. 3.
  • Ilbahar E, Karaşan A, Cebi S, Kahraman C. 2018. A novel approach to risk assessment for occupational health and safety usin g Pythagorean fuzzy AHP & fuzzy inference system. Saf Sci. 103:124–136.
  • Keršuliene V, Zavadskas EK, Turskis Z. 2010. Selection of rational dispute resolution method by applying new step‐wise weight assessment ratio analysis (SWARA). J Bus Econ Manage. 11(2):243–258.
  • Liu H-C, You J-X, Ding X-F, Su Q. 2015. Improving risk evaluation in FMEA with a hybrid multiple criteria decision making method. Int J Qual Reliab Manage. 32(7):763–782.
  • Liu H-C. 2016. FMEA using uncertainty theories and MCDM methods. Singapore: Springer; p. 13–27.
  • Mardani A, Nilashi M, Zakuan N, Loganathan N, Soheilirad S, Saman MZM, Ibrahim O. 2017. A systematic review and meta-Analysis of SWARA and WASPAS methods: Theory and applications with recent fuzzy developments. Appl Soft Comput. 57:265–292.
  • Mavi RK, Goh M, Zarbakhshnia N. 2017. Sustainable third-party reverse logistic provider selection with fuzzy SWARA and fuzzy MOORA in plastic industry. Int J Adv Manuf Technol. 91(5-8):2401–2418.
  • Miler J. 2005. A method of software project risk identification and analysis [Ph.D. thesis]. Gdańsk, Poland: Gdańsk Univ. of Technology, Faculty of Electronics, Telecommunications and Informatics.
  • Mohaghar A HDS, Arab A. 2017. Investigation and evaluation of Project risks based on BWM. Org Resourc Manage Res. 7(2):157–173.
  • Omidvar M, Nirumand F. 2017. Risk assessment using FMEA method and on the basis of MCDM, fuzzy logic and grey theory: A case study of overhead cranes. Health Saf Work. 7(1):63–76.
  • Patil SK, Kant R. 2014. A fuzzy AHP-TOPSIS framework for ranking the solutions of Knowledge Management adoption in supply chain to overcome its barriers. Expert Syst Appl. 41(2):679–693.
  • Rahimi Y, Tavakkoli-Moghaddam R, Iranmanesh SH, Vaez-Alaei M. 2018. Hybrid approach to construction project risk management with simultaneous FMEA/ISO 31000/evolutionary algorithms: empirical optimization study. J Constr Eng Manage. 144(6):04018043.
  • Rani P, Mishra AR, Pardasani KR. 2020. A novel WASPAS approach for multi-criteria physician selection problem with intuitionistic fuzzy type-2 sets. Soft Comput. 24(3):2355–2367.
  • Safari H, Faraji Z, Majidian S. 2016. Identifying and evaluating enterprise architecture risks using FMEA and fuzzy VIKOR. J Intell Manuf. 27(2):475–486.
  • Stamatis DH. 2003. Failure mode and effect analysis: FMEA from theory to execution. 2nd ed. American Society for Quality Press.
  • Tavakolan M, Mohammadi A. 2018. Risk management workshop application: a case study of Ahwaz Urban Railway project. Int J Constr Manage. 18(3):260–274.
  • Tian Z-p, Wang J-q, Zhang H-y. 2018. An integrated approach for failure mode and effects analysis based on fuzzy best-worst, relative entropy, and VIKOR methods. Appl Soft Comput. 72:636–646.
  • Turskis Z, Zavadskas EK, Antucheviciene J, Kosareva N. 2015. A hybrid model based on fuzzy AHP and fuzzy WASPAS for construction site selection. Int J Comput Commun. 10(6):113–128.
  • Vahdani B, Salimi M, Charkhchian M. 2015. A new FMEA method by integrating fuzzy belief structure and TOPSIS to improve risk evaluation process. Int J Adv Manuf Technol. 77(1-4):357–368.
  • Wideman RM. 1992. Project and program risk management: a guide to managing project risks and opportunities. [Ph.D. thesis]. Univerza v Mariboru, Ekonomsko-poslovna fakulteta.
  • Zegordi S, Nazari A, Rezaee Nik E. 2014. Project risk assessment by a hybrid approach using fuzzy-anp and fuzzy-topsis. Sharif J Ind Eng Manage. 29(1):3–14.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.