Introducing a system dynamic–based model of quality estimation for construction industry subcontractors’ works

, &

References

  • Abbasianjahromi H, Rajaie H, Shakeri E. 2013. A framework for subcontractor selection in the construction industry. J Civ Eng Manage. 19(2):158–168.
  • Abbasianjahromi H, Rajaie H, Shakeri E, Chokan F. 2014. A new decision making model for subcontractor selection and its order allocation. Project Manage J. 45(1):55–66.
  • Abbasianjahromi H, Sepehri M, Abbasi O. 2018. A decision-making framework for subcontractor selection in construction projects. Eng Manage J. 30(2):141–152.
  • Afshar MR, Shahhosseini V, Sebt MH. 2020. Optimal sub-contractor selection and allocation in a multiple construction project: project portfolio planning in practice. J Oper Res Soc. 1–14. doi: 10.1080/01605682.2020.1835450.
  • Afshar MR, Shahhosseini V, Sebt MH. 2021. An interval type-2 fuzzy MCDM model for work package subcontractor prequalification. Soft Comput. 25(1):635–648. doi: 10.1007/s00500-020-05173-3.
  • Arditi D, Chotibhongs R. 2005. Issues in subcontracting practice. J Constr Eng Manage. 131(8):866–876.
  • Arslan G, Kivrak S, Birgonul MT, Dikmen I. 2008. Improving sub-contractor selection process in construction projects: web-based sub-contractor evaluation system (WEBSES). Autom Constr. 17(4):480–488.
  • Artan Ilter D, Bakioglu G. 2018. Modeling the relationship between risk and dispute in subcontractor contracts. J Leg Aff Dispute Resolut Eng Constr. 10(1):04517022.
  • Avikal S, Jain R, Mishra PK. 2014. A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment. Appl Soft Comput J. 25:519–529.
  • Demirkesen S, Bayhan HG. 2019. Subcontractor selection with choosing-by-advantages (CBA) method. In: IOP Conference Series: Materials Science and Engineering.
  • Elazouni AM, Metwally FG. 2000. D-sub: decision support system for subcontracting construction works. J Constr Eng Manage. 126(3):191–199.
  • Enshassi A, Arain FM, Tayeh B. 2010. Subcontractor prequalification practices in palestine. Int J Constr Manage. 10(4):45–74.
  • Forrester J. 1961. Industrial dynamics. Cambridge, MA: MIT Press.
  • Gutierrez G, Paul A. 2000. Analysis of the effects of uncertainty, risk-pooling, and subcontracting mechanisms on project performance. Oper Res. 48(6):927–938.
  • Hartmann A, Ling FYY, Tan JSH. 2009. Relative importance of subcontractor selection criteria: evidence from Singapore. J Constr Eng Manage. 135(9):826–832.
  • Khanzadi M, Kaveh A, Alipour M, Mohammadi RK. 2017. Assessment of labor productivity in construction projects using system dynamic approach. Sci Iran. 24(6):2684–2695.
  • Khanzadi M, Nasirzadeh F, Alipour M. 2012. Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects. Autom Constr. 22:368–376.
  • Kozik R. 2016. Using a fuzzy DEMATEL method for analyzing the factors influencing subcontractors selection. In AIP Conference Proceedings.
  • Kumaraswamy MM, Matthews JD. 2000. Improved subcontractor selection employing partnering principles. J Manage Eng. 16(3):47–57.
  • Laryea S, Lubbock A. 2014. Tender pricing environment of subcontractors in the United Kingdom. J Constr Eng Manage. 140(1):04013029.
  • Lima Junior FR, Osiro L, Carpinetti LCR. 2014. A comparison between Fuzzy AHP and Fuzzy TOPSIS methods to supplier selection. Appl Soft Comput J. 21:194–209.
  • Marzouk MM, El Kherbawy AA, Khalifa M. 2013. Factors influencing sub-contractors selection in construction projects. HBRC J. 9(2):150–158.
  • Mawdesley MJ, Al-Jibouri S. 2010. Modelling construction project productivity using systems dynamics approach. Int J Productivity Perform Manage. 59(1):18–36. doi: 10.1108/17410401011006095.
  • Mbachu J. 2008. Conceptual framework for the assessment of subcontractors' eligibility and performance in the construction industry. Constr Manage Econ. 26(5):471–484.
  • Mungle S, Benyoucef L, Son YJ, Tiwari MK. 2013. A fuzzy clustering-based genetic algorithm approach for time-cost-quality trade-off problems: a case study of highway construction project. Eng Appl Artif Intell. 26(8):1953–1966.
  • Nasirzadeh F, Afshar A, Khanzadi M, Howick S. 2008. Integrating system dynamics and fuzzy logic modelling for construction risk management. Constr Manage Econ. 26(11):1197–1212.
  • Nasirzadeh F, Nojedehi P. 2013. Dynamic modeling of labor productivity in construction projects. Int J Project Manage. 31(6):903–911.
  • Ng ST, Luu CDT. 2008. Modeling subcontractor registration decisions through case-based reasoning approach. Autom Constr. 17(7):873–881.
  • Park M, Nepal MP, Dulaimi MF. 2004. Dynamic modeling for construction innovation. J Manage Eng. 20(4):170–177.
  • Pells D. 1993. The AMA handbook of project management. NewYork: AMA-COM.
  • Polat G. 2016. Subcontractor selection using the integration of the AHP and PROMETHEE methods. J Civ Eng Manage. 22(8):1042–1054. doi: 10.3846/13923730.2014.948910.
  • Richardson GP, Pugh AL. 1981. Introduction to system dynamics modeling with dynamo. Cambridge, MA: Wright Allen PR.
  • Rodrigues LLR, Dharmaraj N, Shrinivasa Rao BR. 2006. System dynamics approach for change management in new product development. Manage Res News. 29(8):512–523.
  • Shahhosseini V, Afshar MR, Amiri O. 2018. The root causes of construction project failure. Sci Iran. 25(1):93–108.
  • Sterman JD. 2000. Business dynamics: system thinking and modeling for complex world. New York, NY: McGraw-Hill.
  • Suhr J. 1999. The choosing by advantages decision making system. Westport: Quorum.
  • Wang D, Yung KL, Ip WH. 2001. A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment. IEEE Trans Syst Man Cybern Part C: Appl Rev. 31(2):189–198.
  • Yin H, Wang Z, Yu J, Ji Z, Ni H. 2009. Application of DEA cross-evaluation model in project dynamic alliance subcontractors selection. In 2009 International Workshop on Intelligent Systems and Applications.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.