1,003
Views
7
CrossRef citations to date
0
Altmetric
Articles

Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: a relative importance index (RII) and exploratory factor analysis (EFA) approach

References

  • Adafin J, Rotimi JOB, Wilkinson S. 2020. Risk impact assessments in project budget development: quantity surveyors’ perspectives. Int J Constr Manag. 20(1):13–28.
  • Akçakanat Ö. 2016. Kurumsal Risk Yönetimi Ve Kurumsal Risk Yönetim Süreci. Süleyman Demirel Üniversitesi Vizyoner Derg. 4:30–46.
  • Al‐Bahar JF, Crandall KC. 1990. Systematic risk management approach for construction projects. J Constr Eng Manag. 116(3):533–546.
  • Altarejos-García L, Escuder-Bueno I, Serrano-Lombillo A, de Membrillera-Ortuño MG. 2012. Methodology for estimating the probability of failure by sliding in concrete gravity dams in the context of risk analysis. Struct Saf. 36-37:1–13.
  • Aminbakhsh S, Gunduz M, Sonmez R. 2013. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. J Safety Res. 46:99–105.
  • Arslan G, Kivrak S, Birgonul MT, Dikmen I. 2008. Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES). Autom. Constr. 17(4):480–488.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Proj Manag. 24(4):349–357.
  • Berganza JC, Broto C. 2012. Flexible inflation targets, forex interventions, and exchange rate volatility in emerging countries. J Int Money Financ. 31(2):428–444.
  • Bing L, Akintoye A, Edwards PJ, Hardcastle C. 2005. The allocation of risk in PPP/PFI construction projects in the UK. Int J Proj Manag. 23(1):25–35.
  • Bingol BN, Polat G. 2017. Measuring managerial capability of subcontractors using a KPI Model. Procedia Eng. 196:68–75.
  • Birgönül MT, Dikmen İ. 1996. İnşaat Projelerinin Risk Yöntemi (Risk Management for Construction Projects). Tek. Dergi. 7:1305–1326.
  • Blum SC, Silver RC, Poulin MJ. 2014. Perceiving risk in a dangerous world: Associations between life experiences and risk perceptions. Soc Cogn. 32(3):297–314.
  • Çelik GT, Oral EL. 2016. Big five and organizational commitment - the case of turkish construction professionals. Hum Resour Manag Res. 6:6–14.
  • Chan CTW. 2006. A decision-making matrix model for estimating construction project overhead, in. PMI® Research Conference: New Directions in Project Management. Montréal, Québec.
  • Chan CTW. 2012. The principal factors affecting construction project overhead expenses: an exploratory factor analysis approach. Constr Manag Econ. 30(10):903–914.
  • Çoşkun H, Erdiş E, Genç O. 2016. Eşzamanlı Mühendislik İstihdamının İnşaat Projelerinin Performansına Etkisi (Improving the Performance of Construction Projects by Employing Concurrent Engineering). Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Derg. 31(2):47–58.
  • de la Garza JM, Alcantara P, Kapoor M, Ramesh PS. 1994. Value of Concurrent Engineering for A/E/C Industry. J Manag Eng. 10(3):46–55.
  • Demirci M, Oral E, Erdiş E. 2004. İnşaat Firmalarında Teklif Fiyatı Belirleme Stratejileri. TMMOB İnşaat Mühendisleri Odası Adana Şubesi. 27:4–7.
  • Dixit S, Mandal SN, Thanikal JV, Saurabh K. 2019. Study of significant factors affecting construction productivity using relative importance index in indian construction industry. E3S Web Conf. 140:09010.
  • Duncan W. 2005. A guide to the project management body of knowledge (PMBOK guide). Sylva, NC: PMI Communications.
  • Enshassi A, Mohamed S, Abushaban S. 2009. Factors affecting the performance of construction projects in the gaza strip. J Civ Eng Manag. 15(3):269–280.
  • Erdis E, Coskun H, Genc O. 2015. Architects’ view of concurrent engineering in construction projects. Int J Thales Eng Sci. 1:1–15.
  • Genç O, Coşkun H, Erdiş E. 2020. The effect of design phase meetings on change orders in building construction projects. Çukurova Univ J Faculty Engin Arch. 35(2):425–431.
  • Genç O, Erdiş E, Çoşkun H. 2017. İnşaat Mühendisleri Özelinde Eş Zamanlı Mühendislik Yaklaşımının İrdelenmesi (Investigation of Civil Engineers’ Concurrent Engineering Approach). Çukurova Üniversitesi Mühendislik-Mimarlık Fakültesi Derg. 31(1):31–38.
  • Genç O, Erdis E, Oral E. 2016. İnşaat işlerinde yüklenici riskleri ve risk tutumları (Contractors' Risks and Risk Attitudes in Construc3on Projects), in: 1st International Mediterranean Science and Engineering Congress. Adana. 1:1191–1195.
  • Genç O, Erdis E, Oral E. 2018. İnşaat Firmalarinin Karşilaştiklari Potansiyel Risklerin Proje Başarisina Etkisi (Contractors' Risks and Risk Attudes in Construc3on Projects. Uludağ Univ J Fac Eng. 23(1):441–450.
  • George D, Mallery P. 2007. SPPS for Windows step by step: A simple guide and reference. Boston, MA: Pearson A and B.
  • Gorsuch RL. 1988. Exploratory factor analysis. In: Handbook of multivariate experimental psychology. Boston, MA: Springer; p. 231–258.
  • Gravetter FJ, Forzano L-AB. 2012. Research methods for the behavioral sciences. CA: Wadsworth.
  • Gunduz M, Abdi EA. 2020. Motivational factors and challenges of cooperative partnerships between contractors in the construction industry. J Manage Eng. 36(4):04020018.
  • Hartmann A, Ling FYY, Tan JSH. 2009. Relative importance of subcontractor selection criteria: Evidence from Singapore. J Constr Eng Manage. 135(9):826–832.
  • Hendrickson CT, Au T. 1989. Project management for construction: fundamental concepts for owners, engineers, architects, and builders. NJ: Prentice Hall.
  • Hillson D, Grimaldi S, Rafele C. 2006. Managing project risks using a cross risk breakdown matrix. Risk Manag. 8(1):61–76.
  • Jadidoleslami S, Saghatforoush E, Zare Ravasan A. 2018. Constructability obstacles: an exploratory factor analysis approach. Int J Constr Manag 1–14. DOI: 10.1080/15623599.2018.1534044.
  • Jiang B. 2009. The effects of interorganizational governance on supplier’s compliance with SCC: An empirical examination of compliant and non-compliant suppliers. J Oper Manag. 27(4):267–280.
  • Kahraman A, Markowski PM. 2014. Tornado climatology of Turkey. Mon Weather Rev. 142(6):2345–2352.
  • Karim NAA. 2011. Risk allocation in Public Private Partnership (PPP) Project: A review on risk factors. Int J Sustain Constr Eng Technol. 2:8–16.
  • Keil M, Cule PE, Lyytinen K, Schmidt RC. 1998. A framework for identifying software project risks. Commun Acm. 41(11):76–83.
  • Khan O, Burnes B. 2007. Risk and supply chain management: Creating a research agenda. Int Jrnl Logistics Manage. 18(2):197–2116.
  • Kuşan H, Aytekin O, Özdemir İ. 2016. İnşaat Projelerinde Risklerin Bulanik Mantik Modeli İle Değerlendirilmesi (Evaluation of Risks in Construction Projects with Fuzzy Logic Model). NWSA. 11(1):1–14.
  • Marzouk MM, Abdelhamid MS, Elsheikh MT. 2012. Selecting building materials using system dynamics and ant colony optimization. In ICSDC 2011. American Society of Civil Engineers, Reston, VA, 577–584.
  • Mazlina Zaira M, Hadikusumo BHW. 2017. Structural equation model of integrated safety intervention practices affecting the safety behaviour of workers in the construction industry. Saf Sci. 98:124–135.
  • Mhetre K, Konnur BA, Landage AB. 2016. Risk management in construction industry. Int J Eng Res. 1:153–155.
  • Nepal MP, Park M, Son B. 2006. Effects of schedule pressure on construction performance. J Constr Eng Manage. 132(2):182–188.
  • Oghenekevwe O, Olusola O, Chukwudi US. 2014. An assessment of the impact of inflation on construction material prices in Nigeria. Pm World J. 3:1–22.
  • Perminova O, Gustafsson M, Wikström K. 2008. Defining uncertainty in projects – a new perspective. Int J Proj Manag. 26(1):73–79.
  • Roehl WS, Fesenmaier DR. 1992. Risk perceptions and pleasure travel: An exploratory analysis. J Travel Res. 30(4):17–26.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Proj Manag. 25(5):517–526.
  • Shouke C, Zhuobin W, Jie L. 2010. Comprehensive evaluation for construction performance in concurrent engineering environment. Int J Proj Manag. 28(7):708–718.
  • Skitmore M, Picken DH. 2000. The accuracy of pre-tender building price forecasts: an analysis of USA data. Information and Communication in Construction Procurement CIB W92 Procurement System Symposium.
  • Soewin E, Chinda T. 2018. Factors affecting construction performance: exploratory factor analysis. IOP Conf Ser: Earth Environ Sci. 140:012102.
  • Szymański P. 2017. Risk management in construction projects. Procedia Eng. 208:174–182.
  • Tserng HP, Lin PH. 2002. An accelerated subcontracting and procuring model for construction projects. Autom Constr. 11(1):105–125.
  • Uğur LO. 2006. İnşaat Sektöründe Riskler ve Risk Yönetimi. Ankara, Turkey: Türkiye Müteahhitler Birl; p. 1–153.
  • Yap JBH, Rou Chong J, Skitmore M, Lee WP. 2020. Rework causation that undermines safety performance during production in construction. J Constr Eng Manage. 146(9):04020106.
  • Yeo KT. 1990. Risks, classification of estimates, and contingency management. J Manag Eng. 6(4):458–470.
  • Zhao T, Kazemi SE, Liu W, Zhang M. 2018. The last mile: Safety management implementation in construction sites. Adv Civ Eng. 2018:1–15.
  • Zhi H. 1995. Risk management for overseas construction projects. Int J Proj Manag. 13(4):231–237.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.