202
Views
2
CrossRef citations to date
0
Altmetric
Articles

The compounding effect of multiple disruptions on construction projects

&

References

  • Abdel-Hamid M, Abdelhaleem HM. 2020. Impact of poor labor productivity on construction project cost. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1788757.
  • Abotaleb IS, El-Adaway IH. 2018a. Managing construction projects through dynamic modeling: reviewing the existing body of knowledge and deriving future research directions. J Manage Eng. 34(6):04018033.
  • Abotaleb IS, El-Adaway IH. 2018b. First attempt toward a holistic understanding of the interdependent rippled impacts associated with out-of-sequence work in construction projects: system dynamics modeling approach. J Constr Eng Manage. 144(9):04018084.
  • Al-Kofahi ZG, Mahdavian A, Oloufa A. 2020. System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1711494.
  • Ballard G. 2000. The last planner system of production control [dissertation]. Birmingham (UK): University of Birmingham.
  • Ballard G, Howell G. 1998. Shielding production: essential step in production control. J Constr Eng Manage. 124(1):11–17.
  • Braimah N. 2008. An investigation into the use of construction delay and disruption analysis methodologies [dissertation]. Wolverhampton (UK): University of Wolverhampton.
  • Braimah N. 2014. Understanding construction delay analysis and the role of preconstruction programming. J Manage Eng. 30(5):04014023.
  • Burati JL, Jr Farrington JJ, Ledbetter WB. 1992. Causes of quality deviations in design and construction. J Constr Eng Manage. 118(1):34–49.
  • Burr A, Castro AM. 2016. Delay and disruption in construction contracts. London: Informa Law from Routledge.
  • Chang CL, Ogunlana SO, Saeed K. 1991. Construction project management: a system dynamics model. System dynamics 91. Proceedings of the 9th International Conference on System Dynamics; Bangkok, Thailand: Asian Institute of Technology. p. 108–115.
  • Dabirian S, Abbaspour S, Khanzadi M, Ahmadi M. 2019. Dynamic modelling of human resource allocation in construction projects. Int J Constr Manage. https://doi.org/10.1080/15623599.2019.1616411.
  • Dixit S, Mandal SN, Thanikal JV, Saurabh K. 2019. Evolution of studies in construction productivity: a systematic literature review (2006–2017). Ain Shams Eng J. 10(3):555–564.
  • Dixit S, Pandey AK, Mandal SN, Bansal S. 2017. A study of enabling factors affecting construction productivity: Indian scenario. Int J Civ Eng Technol. 8(6):741–758.
  • Ecem Yildiz A, Dikmen I, Talat Birgonul M. 2020. Using system dynamics for strategic performance management in construction. J Manage Eng. 36(2):04019051.
  • Etemadinia H, Tavakolan M. 2021. Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. Int J Constr Manage. 21(1):93–112.
  • Forrester JW. 1961. Industrial dynamics. Cambridge (MA): MIT Press.
  • Gharib S. 2021. Using system dynamics to study the effect of change orders on labor productivity [master's thesis]. Cairo, Egypt: The American University in Cairo. AUC Knowledge Fountain. https://fount.aucegypt.edu/etds/1559.
  • Goldratt EM. 2017. Critical chain: a business novel. London: Routledge.‏
  • Ibbs W, Berry M, Sun X. 2017. Visualizing skipped and out-of-sequence work. J Leg Aff Dispute Resolut Eng Constr. 9(4):05017006.
  • Kellner MI, Madachy RJ, Raffo DM. 1999. Software process simulation modeling: why? What, how? J Syst Software. 46(2–3):91–105.
  • Kim S, Chang S, Castro-Lacouture D. 2020. Dynamic modeling for analyzing impacts of skilled labor shortage on construction project management. J Manage Eng. 36(1):04019035.
  • Kisi KP, Mani N, Rojas EM, Foster ET. 2017. Optimal productivity in labor-intensive construction operations: pilot study. J Constr Eng Manage. 143(3):04016107.
  • Leon H, Osman H, Georgy M, Elsaid M. 2018. System dynamics approach for forecasting performance of construction projects. J Manage Eng. 34(1):04017049.
  • Ma L, Liu C. 2018. Decomposition of temporal changes in construction labour productivity. Int J Constr Manage. 18(1):65–77.
  • Mitropoulos P, Nichita T. 2010. Critical concerns of production control system on projects with labor constraints: lessons from a residential case study. J Manage Eng. 26(3):153–159.
  • Moradi S, Nasirzadeh F, Golkhoo F. 2017. Modeling labor productivity in construction projects using hybrid SD-DES approach. Sci Iran. 24(6):2752–2761.
  • Nasir MK, Hadikusumo BH. 2019. System dynamics model of contractual relationships between owner and contractor in construction projects. J Manage Eng. 35(1):04018052.
  • Nasirzadeh F, Khanzadi M, Mir M. 2018. A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: an application to model construction workers' safety behaviour. Int J Constr Manage. 18(2):132–143.
  • Ogunlana S, Lim J, Saeed K. 1998. Desman: a dynamic model for managing civil engineering design projects. Comput Struct. 67(5):401–419.
  • Porwal A, Parsamehr M, Szostopal D, Ruparathna R, Hewage K. 2020. The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1854930.
  • Robinson S, Nance RE, Paul RJ, Pidd M, Taylor SJ. 2004. Simulation model reuse: definitions, benefits and obstacles. Simul Modell Pract Theory. 12(7–8):479–494.
  • Rød B, Lange D, Theocharidou M, Pursiainen C. 2020. From risk management to resilience management in critical infrastructure. J Manage Eng. 36(4):04020039.
  • Seresht NG, Fayek AR. 2018. Dynamic modeling of multifactor construction productivity for equipment-intensive activities. J Constr Eng Manage. 144(9):04018091. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001549.
  • Shafiei I, Eshtehardian E, Nasirzadeh F, Arabi S. 2020. Dynamic modeling to reduce the cost of quality in construction projects. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1845425.
  • Sing MC, Love PE, Edwards DJ, Liu J. 2016. Dynamic modeling of workforce planning for infrastructure projects. J Manage Eng. 32(6):04016019.
  • Soewin E, Chinda T. 2020. Development of a construction performance index in the construction industry: system dynamics modelling approach. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1742633.
  • Song L, AbouRizk SM. 2008. Measuring and modeling labor productivity using historical data. J Constr Eng Manage. 134(10):786–794.
  • Soto L. 2007. Construction design as a process for flow: applying lean principles to construction design [Master. thesis]. Cambridge: Massachusetts Institute of Technology.
  • Spiegelhalter D, Gilks WR, Richardson S, editors. 1995. Markov Chain Monte Carlo in Practice. 1st ed. New York: Chapman and Hall/CRC. https://doi.org/10.1201/b14835.
  • Sterman JD. 1992. Systems dynamic modeling for project management. Working paper. Cambridge (MA): Systems Dynamics Group, Sloan School of Management, Massachusetts Institute of Technology.
  • Taylor T, Ford D. 2008. Managing tipping point dynamics in complex construction projects. J Constr Eng Manage. 134(6):421–431.
  • Thomas HR, Maloney WF, Horner RMW, Smith GR, Handa VK, Sanders SR. 1990. Modeling construction labor productivity. J Constr Eng Manage. 116(4):705–726.
  • Thomas HR, Oloufa AA. 1995. Labor productivity, disruptions, and the ripple effect. Cost Eng. 37(12):49–54.
  • Thomas HR, Sanders SR, Bilal S. 1992. Comparison of labor productivity. J Constr Eng Manage. 118(4):635–650.
  • Thomas HR, Yiakoumis I. 1987. Factor model of construction productivity. J Constr Eng Manage. 113(4):623–639.
  • Thomas HR, Završki I. 1999. Construction baseline productivity: theory and practice. J Constr Eng Manage. 125(5):295–303.
  • Thomas HR. 1992. Effects of scheduled overtime on labor productivity. J Constr Eng Manage. 118(1):60–76.
  • Vahabi A, Nasirzadeh F, Mills A. 2020. Impact of project briefing clarity on construction project performance. Int J Constr Manage. https://doi.org/10.1080/15623599.2020.1802681.
  • Vitharana VHP, Chinda T. 2021. Development of a lower back pain prevention index for heavy equipment operators in the construction industry: system dynamics modelling. Int J Constr Manage. 21(7):677–693.
  • Wang J, Yuan H. 2017. System dynamics approach for investigating the risk effects on schedule delay in infrastructure projects. J Manage Eng. 33(1):04016029.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.