274
Views
0
CrossRef citations to date
0
Altmetric
Articles

Roadway design and construction in infrastructure limited contexts: a risk breakdown structure

&

References

  • Abbasianjahromi H, Talebian R. 2018. Identifying the most important occupational diseases in the construction industry: case study of building industry in Iran. Int J Constr Manage. 21(3):1–11.
  • Adedokun OA, Ibironke OT, Dairo DO, Aje IO, Awodele OA, Opawole AD, Akinradewo OF, Abiola-Falemu JO. 2013. Evaluation of quantitative risk analysis techniques in selected large construction companies in Nigeria. J Facilities Manage. 11(4):1472–5967.
  • Afukaar F, Damsere-Derry J, Peters K, Starkey P. 2019. Rural transport services indicators: using a new mixed-methods methodology to inform policy in Ghana. Transp Res Interdiscip Perspect. 3:100074.
  • Ahmadi M, Behzadian K, Ardeshir A, Kapelan Z. 2017. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. J Civ Eng Manag. 23(2):300–310.
  • Aje I. 2012. The impact of contractors’ prequalification on construction project delivery in Nigeria. Eng Constr Architect Manage. 19(2):159–172.
  • Al-Hazim N, Salem ZA. 2015. Delay and cost overrun in road construction projects in Jordan. Int J Eng Technol. 4(2):288–293.
  • Alvand A, Mirhosseini SM, Ehsanifar M, Zeighami E, Mohammadi A. 2021. Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran. Int J Constr Manage. 1–23. https://doi.org/10.1080/15623599.2021.1877875.
  • Amadi AI, Higham A. 2017. Latent geotechnical pathogens inducing cost overruns in highway projects. J Financ Manage Property Constr. 22(3):269–285.
  • Amoatey CT, Ankrah ANO. 2017. Exploring critical road project delay factors in Ghana. J Facilities Manage. 15(2):110–127.
  • Aziz RF, Abdel-Hakam AA. 2016. Exploring delay causes of road construction projects in Egypt. Alex Eng J. 55(2):1515–1539.
  • Badalpur M, Nurbakhsh E. 2019. An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran. Int J Constr Manag. 21(9):1–9.
  • Bajjou MS, Chafi A. 2020. Empirical study of schedule delay in Moroccan construction projects. Int J Constr Manage. 20(7):783–800.
  • Bhatt N, Sarkar D. 2020. Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. Int J Constr Manage. 20(6):653–665.
  • Chang T, Deng X, Zuo J, Yuan J. 2018. Political risks in central Asian countries: factors and strategies. J Manage Eng. 34(2):04017059.
  • Chen Y, Hu Z, Liu Q, Zhao M. 2018. Risk propagation of delayed payment in stakeholder network of large hydropower project construction considering risk resistance and mitigation. Math Prob Eng. 2018:1–14.
  • Chileshe N, Hosseini MR, Jepson J. 2016. Critical barriers to implementing risk assessment and management practices (RAMP) in the Iranian construction sector. J Constr Dev Countries. 21(2):81–112.
  • Chileshe N, Yirenkyi‐Fianko AB. 2012. An evaluation of risk factors impacting construction projects in Ghana. J Eng Des Technol. 10(3):306–329.
  • Creswell JW. 2014. Research design. 4th ed. Thousand Oaks (CA): SAGE Publications.
  • Cruz CO, Marques RC, Franco D. 2015. Road-network development in quickly growing economies: Brazilian case study MG-050. J Infrastruct Syst. 21(4):05015002.
  • De Oliveira Alves LB, Maeda S, Morikawa S, Kato H. 2019. Can transportation change land property rights in developing rural areas? Case study of land titles in a Brazilian municipality. J Transp Res Board. 2673(5):220–229.
  • Edinger H, Ngulube N, Ntsoane M. 2019. Capital projects in a digital age: Africa Construction trends Report 2019. Johannesburg (South Africa): Deloitte.
  • Edoho FM. 2015. Entrepreneurship and socioeconomic development: catalysing African transformation in the 21st century. Afr J Econom Man Stud. 6(2):127–147.
  • Gundes S, Aydogan G. 2016. Bibliometric analysis of research in international construction. Can J Civ Eng. 43(4):304.
  • Gyadu-Asiedu W, Danso H, Asubonteng JA. 2013. Assessment of the performance of local and foreign road construction firms in Ghana. Int J Constr Manage. 13(4):53–73.
  • Hasan R, Suliman SMA, Malki YA. 2014. An investigation into the delays in road projects in Bahrain. Int J Res Eng Sci. 2(2):38–47.
  • Hillson D. 2003. Using a risk breakdown structure in project management. J Facilities Manage. 2(1):85–97.
  • Holzmann V, Spiegler I. 2011. Developing risk breakdown structure for information technology organizations. Int J Project Manage. 29(5):537–546.
  • Hossain MA, Raiymbekov D, Nadeem A, Kim JR. 2019. Delay causes in Kazakhstan’s construction projects and remedial measures. Int J Constr Manage. 1–19. https://doi.org/10.1080/15623599.2019.1647635.
  • Jing S, Li R, Yan J, Zhang S. 2019. The development of demand identification model for poverty alleviation subjects using fuzzy proximity. Math Prob Eng. 2019:1–10.
  • Kadry M, Osman H, Georgy M. 2017. Causes of construction delays in countries with high geopolitical risks. J Constr Eng Manage. 143(2):04016095.
  • Kalayjian WH. 2000. Third world markets: anticipating the risks. Civil Eng. 70(5):56–58.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Proj Manag. 27(5):522–531.
  • Kamanga MJ. 2013. Causes of delay in road construction projects in Malawi. J South African Inst Civil Eng. 55(3):79–85.
  • Khan A, Choudhary MA, Khushnood S, Masood SA. 2015. Development of econometric models for cost & time over-runs: an empirical study of major road construction projects in Pakistan. Technical J Univ Eng Technol (UET) Taxila, Pakistan. 20(4):79–85.
  • Khokhar T, Serajuddin U. 2015. Should we continue to use the term “developing world”? Worldbank.org; [accessed 2020 Feb 10]. https://blogs.worldbank.org/opendata/should-we-continue-use-term-developing-world.
  • Kivrak S, Arslan G, Tuncan M, Birgonul MT. 2014. Impact of national culture on knowledge sharing in international construction projects. Can J Civ Eng. 41(7):642–649.
  • Koehn E “Ed”, Atuahene F. 1994. Labor/political factors for international firms in developing regions. J Prof Issues Eng Educ Pract. 120(1):41–49.
  • Krippendorff K. 2004. Content analysis an introduction to its methodology. 2nd ed. Thousand Oaks (CA): SAGE Publications.
  • Kululanga G, Kuotcha W. 2010. Measuring project risk management process for construction contractors with statement indicators linked to numerical scores. Eng Constr Architect Manage. 17(4):336–351.
  • Le PT, Kirytopoulos K, Chileshe N, Rameezdeen R. 2019. Taxonomy of risks in PPP transportation projects: a systematic literature review. Int J Constr Manage. 1–16. https://doi.org/10.1080/15623599.2019.1615756.
  • Lee K-W, Han SH. 2017. Quantitative analysis for country classification in the construction industry. J Manage Eng. 33(4):04017014.
  • Mahdi I, Soliman E. 2021. Significant and top ranked delay factors in Arabic Gulf countries. Int J Constr Manage. 21(2):167–180.
  • Manavazhi M, Adhikari D. 2002. Material and equipment procurement delays in highway projects in Nepal. Int J Project Manage. 20:627–632.
  • Mansfield NR, Ugwu OO, Doran T. 1994. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage. 12(4):254–260.
  • Mishra S, Mishra B. 2016. A study of risk factors involved in the construction projects. Int J Innov Res Sci Eng Technol. 5(2):1190–1196.
  • Mousavi SM, Tavakkoli-Moghaddam R, Azaron A, Mojtahedi SMH, Hashemi H. 2011. Risk assessment for highway projects using jackknife technique. Expert Syst Appl. 38:5514–5524.
  • Muneeswaran G, Manoharan P, Awoyera PO, Adesina A. 2020. A statistical approach to assess the schedule delays and risks in Indian construction industry. Int J Constr Manage. 20(5):450–461.
  • Mwelu N, Davis PR, Ke Y, Watundu S, Jefferies M. 2019. Success factors for implementing Uganda’s public road construction projects. Int J Constr Manage. 21:1–17.
  • Neuendorf KA. 2017. The content analysis guidebook. 2nd ed. Thousand Oaks (CA): SAGE Publications.
  • Nuru G, Ilias S, Radzi I. 2016. Comparing the levels of performance of small scale local government contractors in Northern Nigeria with international practice. Eng Constr Architect Manage. 23(5):588–609.
  • Odediran SJ, Windapo AO. 2017. Mitigating risks in African construction markets through the interactive behavior of resources and capabilities in multinational construction companies and entry decisions. J Manage Eng. 33(2):04016040.
  • Ogbu CP. 2018. Survival practices of indigenous construction firms in Nigeria. Int J Constr Manage. 18(1):78–91.
  • Onukwube HN, Iyagba R. 2011. Construction professionals job performance and characteristics: a comparison of indigenous and expatriate construction companies in Nigeria. Australas J Constr Econ Build. 11(2):71–83.
  • Osei-Kyei R, Chan APC. 2017. Risk assessment in public-private partnership infrastructure projects: empirical comparison between Ghana and Hong Kong. Constr Innov. 17(2):204–223.
  • Perera BAKS. 2009. Risk management in road construction: the case of Sri Lanka. Int J Strategic Property Manage. 13(2):87–102.
  • Perera BAKS, Rameezdeen R, Chileshe N, Hosseini MR. 2014. Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: a Delphi approach. Int J Constr Manage. 14(1):1–14.
  • Porter G. 2014. Transport services and their impact on poverty and growth in rural sub-Saharan Africa: a review of recent research and future research needs. Transport Rev. 34(1):24–45.
  • Pottas A, Smith M, July S. 2015. African construction trends report 2014. Johannesburg: Deloitte.
  • Project Management Institute. 2017. A guide to the Project Management Body of Knowledge (PMBOK guide). 6th ed. Newton Square (PA): Project Management Institute.
  • Rassol M, Taillanderi F, Denys B, Niandou H. 2012. Methodology and tools for risk evaluation in construction projects using risk breakdown structure. Eur J Environ Civil Eng. 16:s78–s79.
  • Rwelamila PD, Purushottam N. 2012. Project management trilogy challenges in Africa—where to from here? Project Manage J. 43(4):5–13.
  • Sachs J, Schmidt-Traub G, Kroll C, Lafortune G, Fuller G. 2019. Sustainable development report 2019. New York (NY): Bertelsmann Stiftung and Sustainable Development Solutions Network (SDSN); [accessed 2020 Jan 27]. https://www.sustainabledevelopment.report/.
  • Saldana J. 2016. The coding manual for qualitative researchers. 3rd ed. Thousand Oaks (CA): SAGE Publications.
  • Salifu Z, Osei KA, Adjasi CKD. 2007. Foreign exchange risk exposure of listed companies in Ghana. J Risk Finance. 8(4):380–393.
  • Santoso DS, Soeng S. 2016. Analysing delays of road construction projects in Cambodia: causes and effects. J Manage Eng. 32(6):05016020.
  • Sarkar D, Singh M. 2020. Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India. Int J Constr Manage. 1–12. https://doi.org/10.1080/15623599.2020.1742634.
  • Senaratne S, Mayuran J. 2015. Documentation management based on ISO for construction industries in developing countries. J Constr Dev Countries. 20(2):81–95.
  • Shah ZP, Sharma ND, Rathod H. 2017. A review on risk management for PPP based road projects. Int J Scientific Res Dev. 5(9):724–727.
  • Sigmund Z, Radujković M. 2014. Risk breakdown structure for construction projects on existing buildings. Procedia Soc Behav Sci. 119:894–901.
  • Siraj NB, Fayek AR. 2019. Risk identification and common risks in construction: literature review and content analysis. J Constr Eng Manage. 145(9):03119004.
  • Vaiškūnaitė R, Mierauskas P, Špakauskas V. 2012. Biodiversity impact assessment in road development in Lithuania. Transport. 27:187–195.
  • Valipour A, Yahaya N, Noor NM, Kildiene S, Sarvari H, Mardani A. 2015. A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study. J Civil Eng Manage. 21(7):933–947.
  • Wanjari SP, Dobariya G. 2016. Identifying factors causing cost overrun of the construction projects in India. Sadhana. 41(6):679–693.
  • Yao Y, Albert C, Chen Chuan PC, Amos D. 2018. Critical risk factors of transnational public–private partnership projects: literature review. J Infrastruct Syst. 24(1):04017042.
  • Yim RL, Castaneda JM, Doolen TL, Tumer IY, Malak R. 2015. Exploring the relationship between rework projects and risk indicators. Project Manage J. 46(4):63–75.
  • Zafar I, Yousaf T, Ahmed DS. 2016. Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study. KSCE J Civ Eng. 20(5):1613–1620.
  • Zafar I, Wuni IY, Shen GQP, Ahmed S, Yousaf T. 2019. A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: the case of Pakistan. Int J Constr Manag. 1–19. https://doi.org/10.1080/15623599.2019.1647634.
  • Zhao Y, Feng Y, Li C. 2018. Effect of organizational cultural differences and mutual trust on contract management of nonequity construction project alliances. Adv Civ Eng. 2018:1–9.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.