A fuzzy project buffer management algorithm: a case study in the construction of a renewable project

, , , &

References

  • Ahmadi M, Behzadian K, Ardeshir A, Kapelan Z. 2016. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. J Civil Eng Manage. 23(2):300–310.
  • Almeida BF, Correia I, Saldanha-da-Gama F. 2018. A biased random-key genetic algorithm for the project scheduling problem with flexible resources. TOP. 26(2):213–226.
  • Ammar MA, Abd-ElKhalek SI. 2019. Criticality measurement in fuzzy project scheduling. Int J Construct Manage. 2019:1–10.
  • Araszkiewicz K. 2017. Application of critical chain management in construction projects schedules in a multi-project environment: a case study. Procedia Eng. 182:33–41.
  • Balta S, Birgonul MT, Dikmen I. 2018. Buffer sizing model incorporating fuzzy risk assessment: case study on concrete gravity dam and hydroelectric power plant projects. ASCE-ASME J Risk Uncertainty Eng Syst, Part A: Civ Eng. 4(1):04017039.
  • Banaitiene N, Banaitis A. 2012. Risk management in construction projects. In Banaitiene N, ed. Risk management: current issues and challenges. London (UK): IntechOpen. p. 429–448.
  • Braglia M, Frosolini M, Montanari R. 2003. Fuzzy criticality assessment model for failure modes and effects analysis. Int J Qual Reliabil Manage. 20(4):503–524.
  • Budd CS, Cooper M. 2005a. A project management approach to increasing agency margins. J Promot Manage. 11(1):29–49.
  • Budd CS, Cooper MJ. 2005b. Improving on-time service delivery: the case of project as product. HSM. 24(1):67–81.
  • Cheraghi E, Khalilzadeh M, Shojaei S, Zohrehvandi S. 2017. A mathematical model to select the risk response strategies of the construction projects: case study of saba tower. Procedia Comput Sci. 121:609–616.
  • Das MK, Panja SC, Chowdhury S, Chowdhury SP, Elombo AI. 2011. Expert-based FMEA of wind turbine system. In 2011 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), December, pp. 1582–1585. IEEE.
  • Faghihi V, Nejat A, Reinschmidt KF, Kang JH. 2015. Automation in construction scheduling: a review of the literature. Int J Adv Manuf Technol. 81(9–12):1845–1856.
  • Gargama H, Chaturvedi SK. 2011. Criticality assessment models for failure mode effects and criticality analysis using fuzzy logic. IEEE Trans Rel. 60(1):102–110. 10.1109/TR.2010.2103672.
  • Geramian A, Abraham A, Ahmadi Nozari M. 2019. Fuzzy logic-based FMEA robust design: a quantitative approach for robustness against groupthink in group/team decision-making. Int J Product Res. 57(5):1331–1344.
  • Ghaffari M, Emsley MW. 2015. Current status and future potential of the research on Critical Chain Project Management. Surv Operat Res Manage Sci. 20(2):43–54.
  • Goldratt EM. 1997. Critical chain: a business novel. Great Barrington (MA): North River Press.
  • Hegde AL, Jain A, Das BB. 2021. Resource buffers in construction projects. In Recent trends in civil engineering. Singapore: Springer. p. 451–460.
  • Hu X, Cui N, Demeulemeester E. 2015. Effective expediting to improve project due date and cost performance through buffer management. Int J Prod Res. 53(5):1460–1471.
  • Hu X, Demeulemeester E, Cui N, Wang J, Tian W. 2017. Improved critical chain buffer management framework considering resource costs and schedule stability. Flex Serv Manuf J. 29(2):159–183.
  • Huang CL, Chen HC, Li RK, Tsai CH. 2012. A comparative study of the critical chain and PERT planning methods: no bad human behaviors involved. Int J Acad Res Business Soc Sci. 2(8):379. http://dx.doi.org/10.6007/IJARBSS/v2-i8/9233.
  • Iranmanesh H, Mansourian F, Kouchaki S. 2016. Critical chain scheduling: a new approach for feeding buffer sizing. IJOR. 25(1):114–130.
  • Jaśkowski P, Biruk S. 2011. The method for improving stability of construction project schedules through buffer allocation: Statybos vykdymo grafiko stabilumo užtikrinimas paskirstant laiko rezervus. Technol Econ Develop Econ. 17(3):429–444.
  • Kang J, Sun L, Sun H, Wu C. 2017. Risk assessment of floating offshore wind turbine based on correlation-FMEA. Ocean Eng. 129:382–388.
  • Keskin GA, Özkan C. 2009. An alternative evaluation of FMEA: fuzzy ART algorithm. Qual Reliab Engng Int. 25(6):647–661.
  • Khalilzadeh M, Shakeri H, Zohrehvandi S. 2021. Risk identification and assessment with the fuzzy DEMATEL-ANP method in oil and gas projects under uncertainty. Procedia Comput Sci. 181:277–284.
  • Khuankrue I, Kumeno F, Ohashi Y, Tsujimura Y. 2017. Improving fuzzy FMEA model for student projects. In 2017 Joint 17th World Congress of International Fuzzy Systems Association and 9th International Conference on Soft Computing and Intelligent Systems (IFSA-SCIS), June, pp. 1–6. IEEE.
  • Lamas P, Demeulemeester E. 2016. A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations. J Sched. 19(4):409–428.
  • Lin YK, Chong CS. 2017. Fast GA-based project scheduling for computing resources allocation in a cloud manufacturing system. J Intell Manuf. 28(5):1189–1201.
  • Liu J, Whangbo TK. 2012. A study on the buffer sizing method of CCPM technique using statistical analysis. In International Conference on Hybrid Information Technology. Berlin (Heidelberg): Springer. p. 672–679.
  • Ma G, Wang A, Li N, Gu L, Ai Q. 2014. Improved critical chain project management framework for scheduling construction projects. J Constr Eng Manage. 140(12):04014055.
  • Maddeppungeng A, Mina E, Dewi IP. 2017. Pengembangan dan Uji Model Sumber Daya Proyek Kontruksi Terhadap K3 (Kesehatan dan Keselamatan Kerja) dan Kinerja Perusahaan (Studi Kasus: Proyek Pembangunan Kontruksi Offshore Provinsi Banten). Fondasi: Jurnal Teknik Sipil. 6(2):46–57.
  • Nazeri A, Naderikia R. 2017. A new fuzzy approach to identify the critical risk factors in maintenance management. Int J Adv Manuf Technol. 92(9–12):3749–3783.
  • Peng W, Huang M. 2014. A critical chain project scheduling method based on a differential evolution algorithm. Int J Prod Res. 52(13):3940–3949.
  • Ren A, Yun C. 2013. Research of software size estimation method. In 2013 International Conference on Cloud and Service Computing, November, pp. 154–155. IEEE.
  • Roghanian E, Alipour M, Rezaei M. 2018. An improved fuzzy critical chain approach in order to face uncertainty in project scheduling. Int J Construct Manage. 18(1):1–13.
  • Sarkar D, Singh M. 2020. Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of Ahmedabad, India. Int J Construct Manage. 2020:1–12.
  • Sarkar D, Jha KN, Patel S. 2021. Critical chain project management for a highway construction project with a focus on theory of constraints. Int J Construct Manage. 21(2):194–207.
  • Shafiee M, Dinmohammadi F. 2014. An FMEA-based risk assessment approach for wind turbine systems: a comparative study of onshore and offshore. Energies. 7(2):619–642.
  • Sharma RK, Kumar D, Kumar P. 2005. Systematic failure mode effect analysis (FMEA) using fuzzy linguistic modelling. Int J Qual Reliability Mgmt. 22(9):986–1004.
  • Tavakolan M, Mohammadi A. 2018. Risk management workshop application: a case study of Ahwaz Urban Railway project. Int J Construct Manage. 18(3):260–274.
  • Tukel OI, Rom WO, Eksioglu SD. 2006. An investigation of buffer sizing techniques in critical chain scheduling. Eur J Oper Res. 172(2):401–416.
  • Vanhoucke M. 2016. Buffer management. In Integrated project management sourcebook. Cham: Springer. p. 155–193.
  • Wang LX. 1994. Adaptive fuzzy systems and control: design and stability analysis. Hoboken (NJ): Prentice-Hall, Inc.
  • Wessiani NA, Yoshio F. 2018. Failure mode effect analysis and fault tree analysis as a combined methodology in risk management. In IOP Conference Series: Materials Science and Engineering; April (Vol. 337, No. 1, p. 012033). IOP Publishing.
  • Yu J, Xu Z, Hu C. 2013. Buffer sizing approach in critical chain project management under multiresource constraints. In 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII), November (Vol. 3, pp. 71–75). IEEE.
  • Zareei S. 2018. Project scheduling for constructing biogas plant using critical path method. Renew Sustain Energy Rev. 81:756–759.
  • Zhang J, Jia S, Diaz E. 2018. Dynamic monitoring and control of a critical chain project based on phase buffer allocation. J Oper Res Soc. 69(12):1906–1912.
  • Zhang J, Song X, Díaz E. 2016. Project buffer sizing of a critical chain based on comprehensive resource tightness. Eur J Oper Res. 248(1):174–182.
  • Zhang J, Song X, Díaz E. 2017. Critical chain project buffer sizing based on resource constraints. Int J Prod Res. 55(3):671–683.
  • Zhang J, Song X, Chen H, Shi R. 2016. Determination of critical chain project buffer based on information flow interactions. J Oper Res Soc. 67(9):1146–1157.
  • Zhao Y, Cui N, Tian W. 2020. A two-stage approach for the critical chain project rescheduling. Ann Oper Res. 285(1–2):67–95.
  • Zohrehvandi S, Khalilzadeh M. 2019. APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. ECAM. 26 (6):1129–1150.
  • Zohrehvandi S, Tenera A. 2019. Proposing a risk management model in construction of combined-cycle power plant projects. In Doctoral Conference on Computing, Electrical and Industrial Systems; May, p. 58–69. Cham: Springer.
  • Zohrehvandi S, Javadi M, Khalilzadeh M, Cheraghi E, Mahjoub M. 2018. Role of information cycles in construction of a wind farm power plant project. Procedia Comput Sci. 138:500–507.
  • Zohrehvandi S, Khalilzadeh M, Amiri M, Shadrokh S. 2020a. A heuristic buffer sizing algorithm for implementing a renewable energy project. Autom Constr. 117:103267.
  • Zohrehvandi S, Khalilzadeh M, Hajizadeh M, Cheraghi E. 2017. Planning project closure phase in combined cycle power plant projects. Procedia Comput Sci. 121:274–281.
  • Zohrehvandi S, Vanhoucke M, Soltani R, Javadi M. 2019. A reconfigurable model for implementation in the closing phase of a wind turbines project construction. ECAM. 27(2):502–524.
  • Zohrehvandi S, Khalilzadeh M, Amiri M, Shadrokh S. 2021. Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. ECAM.
  • Zohrehvandi S, Vanhoucke M, Khalilzadeh M. 2020b. A project buffer and resource management model in energy sector; a case study in construction of a wind farm project. IJESM. 14(6):1123–1142.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.