References
- Akanni PO, Oke AE, Omotilewa OJ. 2014. Implications of rising cost of building materials in Lagos State Nigeria. SAGE Open. 4(4):215824401456121.
- Akinci B, Fischer M. 1998. Factors affecting contractors' risk of cost overburden. J Manage Eng. 14(1):67–76.
- Alhomidan A. 2013. Factors affecting cost overrun in road construction projects in Saudi Arabia. Int J Civil Environ Eng IJENS. 13(3):1–4.
- Anondho B. & Lydiawati S. 2015. Identifiksasi faktor pengaruh terukur terhadap durasi probabilistik proyek konstruksi di Jakarta. Jakarta: Hibah Bersaing DIKTI.
- Anondho B. 2018. Pengembangan Model Prediksi Durasi Probabilistik Proyek Pembangunan Gedung Bertingkat Tinggi berbasis Faktor Pengaruh Eksternal Terukur. Doctoral dissertation. Universitas Indonesia Library.
- Arif F, Lodi SH, Azhar N. 2015. Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. Int J Constr Manage. 15(1):59–70.
- Astina DCN, Widhiawati IAR, Joni IGP. 2012. Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi di Kabupaten Tabanan. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil. 1(1):1–6.
- Aziz RF. 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Eng J. 52(3):387–406.
- Chan APC, Scott D, Chan APL. 2004. Factors affecting the success of a construction project. J Constr Eng Manage. 130(1):153–155.
- Council on Tall Buildings and Urban Habitat. 2020. Jakarta – The Skyscraper Center. https://www.skyscrapercenter.com/city/jakarta.
- Dai J, Goodrum PM, Maloney WF, Srinivasan C. 2009. Latent structures of the factors affecting construction labor productivity. J Constr Eng Manage. 135(5):397–406.
- El-Gohary KM, & Fayek Aziz R. 2014. Factors influencing construction labour productivity in Egypt. J Manage Eng. 30(1):1–9.
- Enshassi A, Mohamed S, Abushaban S. 2009. Factors affecting the performance of construction projects in the Gaza Strip. J Civil Eng Manage. 15(3):269–280.
- Gong J, Borcherding JD, Caldas C. 2011. Effectiveness of craft time utilization in construction. Constr Manage Econ. 29(7):737–751.
- Henderson K. (2005). Earned schedule in action. The Measurable News.
- Hoffman GJ, Thal AE, Webb TS, Weir JD. 2007. Estimating performance time for construction projects. J Manage Eng. 23(4):193–199.
- Hwang BG, Lim ESJ. 2013. Critical success factors for key project players and objectives: case study of Singapore. J Constr Eng Manage. 139(2):204–215.
- Jarkas AM, Bitar CG. 2012. Factors affecting construction labor productivity in Kuwait. J Constr Eng Manage. 138(7):811–820.
- Jiukun D, Goodrum, Paul M, Maloney, William F. 2009. Construction craft workers perceptions of the factors affecting their productivity. J Constr Eng Manage. 135(3):217–226.
- Khoshgoftar M, Bakar AHA, Osman O. 2010. Causes of delays in Iranian construction projects. Int J Constr Manage. 10(2):53–69.
- Kim B-C, Kim H-J. 2014. Sensitivity of earned value schedule forecasting to S-curve patterns. J Constr Eng Manage. 140(7):04014023.
- Kog YC, Loh PK. 2012. Critical success factors for different components of construction projects. J Constr Eng Manage. 138(4):520–528.
- Lientz B, Rea K. 2007. On time technology implementation. London: Routledge.
- Lipke W. 2019. Earned schedule forecasting method selection. PM World J. 8(1):1–15.
- Lipke W, Zwikael O, Henderson K, Anbari F. 2009. Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indexes. Int J Project Manage. 27(4):400–407.
- Lucko G. 2011. Modeling the residual market value of construction equipment under changed economic conditions. J Constr Eng Manage. 137(10):806–816.
- Maqsoom A, Choudhry RM, Umer M, Mehmood T. 2021. Influencing factors indicating time delay in construction projects: impacts of firm size and experience. Int J Constr Manage. 21(12):1251–1262.
- Moore DS, Notz W, Fligner MA. 2013. The basic practice of statistics. New York: Wh Freeman.
- Musa MM, Bin Amirudin R, Sofield T, Mus MA. 2015. Influence of external environmental factors on the success of public housing projects in developing countries. CEB. 15(4):30–44.
- Narbaev T, Marco AD. 2014. Combination of growth model and earned schedule to forecast project cost at completion. J Constr Eng Manage. 140(1):04013038.
- Panas A, Pantouvakis JP. 2018. On the use of learning curves for the estimation of construction productivity. Int J Constr Manage. 18(4):301–309. DOI: 10.1080/15623599.2017.1326302.
- Porter M. 1994. Competitive advantage. Jakarta: Binarupa Aksara.
- Project Management Institute. 2017. A guide to the project management body of knowledge: (PMBOK guide). Retrieved from https://www.academia.edu/42926883/A_Guide_to_the_Project_Management_Body_of_Knowledge_PMBOK_Guide_Fifth_Edition.
- Rivas RA, Borcherding JD, González V, Alarcón LF. 2011. Analysis of factors influencing productivity using craftsmen questionnaires: case study in a Chilean construction company. J Constr Eng Manage. 137(4):312–320.
- Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Project Manage. 25(5):517–526.
- Santoso S. 2015. Menguasai Statistik multivariat. Jakarta: PT Elex Media Komputindo.
- Sepasgozar SM, Bernold LE. 2013. Factors influencing the decision of technology adoption in construction. In ICSDEC 2012: Developing the frontier of sustainable design, engineering, and construction; p. 654–661.
- Shane JS, Molenaar KR, Anderson S, Schexnayder C. 2009. Construction project cost escalation factors. J Manage Eng. 25(4):221–229.
- Sousa V, Almeida NM, Dias LA. 2014. Role of statistic and engineering judgement in developing optimized time-cost relationship models. J Constr Eng Manage. 140(8):04014034.
- Sukumaran P, Bayraktar ME, Hong T, Hastak M. 2006. Model for analysis of factors affecting construction schedule in highway work zones. J Transp Eng. 132(6):508–517.
- Usman H, Sobari N. 2013. Aplikasi Teknik multivariate. Jakarta: Rajawali Pers.
- Watt A. 2014. Project management. Victoria, B.C.: BC campus. https://opentextbc.ca/projectmanagement/.
- World Bank. 1984. The construction industry, issues and strategies in developing countries. Washington DC: World Bank.
- Zhou Z, Irizarry J, Li Q. 2013. Applying advanced technology to improve safety management in the construction industry: a literature review. Constr Manage Econ. 31(6):606–622.