COVID-19 emerging risk assessment for the construction industry of developing countries: evidence from Iraq

, , , &
Pages 693-706 | Received 11 Sep 2022, Accepted 12 Jan 2023, Published online: 23 Jan 2023

References

  • Abd El Khalek H, Aziz RF, Kamel HM. 2016. Risk and uncertainty assessment model in international construction projects using fuzzy logic. Int J Innov Res Eng Manag. 3(2):134–149.
  • Abdul Nabi M, El-Adaway IH. 2021. Understanding the key risks affecting cost and schedule performance of modular construction projects. J Manage Eng. 37(4):4021023.
  • Abdulhussein H, Shibaani A. 2016. Risk management in construction projects in Iraq: contractors’ perspective. Int J Eng Research. 4(3):114–130.
  • Afkhamiaghd AM, Elwakil E. 2020. Preliminary modeling of Coronavirus (COVID-19) spread in construction industry. J Emerg Manag. 18(7):9–17.
  • Agyekum K, Kukah AS, Amudjie J. 2022. The impact of COVID-19 on the construction industry in Ghana: the case of some selected firms. JEDT. 20(1):222–244.
  • Al-Mhdawi MKS, Motawa I, Rasheed H. 2020. Assessment of risk management practices in construction industry. In the10th Int. Conf. on Eng. Project, and Production Management, Project, and Production Management pp. 421–433).
  • Al-Mhdawi MKS, O'Connor A, Brito MP, Qazi A, Rashid HA. 2022. Modeling the effects of construction risks on the performance of oil and gas projects in developing countries: project managers’ perspective Proceedings of Civil Engineering Research in Ireland (CERI 2022).
  • Al-Mhdawi MKS. 2020. Proposed risk management decision support methodology for oil and gas construction projects. In the10th Int. Conf. on Eng. Project, and Production Management pp. 407–420)
  • Al-Mhdawi MKS. 2022. Risk management of construction projects under extreme conditions: a case study of Iraq [PhD Thesis]. The University of Southampton, UK.
  • Alsharef A, Banerjee S, Uddin SM, Albert A, Jaselskis E. 2021. Early impacts of the COVID-19 pandemic on the United States construction industry. IJERPH. 18(4):1559.
  • Amoah C, Simpeh F. 2020. Implementation challenges of COVID-19 safety measures at construction sites in South Africa. J Facil Manag. 19(1):111–128.
  • Araya F. 2021. Modeling the spread of COVID-19 on construction workers: an agent-based approach. Saf Sci. 133(2021):105022.
  • Assaad R, El-Adaway IH. 2021. Guidelines for responding to COVID-19 pandemic: best practices, impacts, and future research directions. J Manage Eng. 37(3):6021001.
  • Bekr GA. 2015. Causes of delay in public construction projects in Iraq. Jordan J Civil Eng. 9(2):149–162.
  • Bernard HR. 2011. Research methods in anthropology: qualitative and quantitative approaches. MD, United States: Rowman and Littlefield.
  • Bin Seddeeq A, Assaf S, Abdallah A, Hassanain MA. 2019. Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings. 9(2):41.
  • Breen RL. 2006. A practical guide to focus-group research. J Geog High Edu. 30(3):463–475.
  • Brewer G, Gajendran TL, Goff R. 2012. Building information modelling (BIM): australian perspectives and adoption trends. Centre for Interdisciplinary Built Environment Research (CIBER), September 2012.
  • Buniya MK, Othman I, Sunindijo RY, Kineber AF, Mussi E, Ahmad H. 2021a. Barriers to safety program implementation in the construction industry. Ain Shams Eng Journal. 12(1):65–72.
  • Buniya MK, Othman I, Durdyev S, Sunindijo RY, Ismail S, Kineber AF. 2021b. Safety program elements in the construction industry: the case of Iraq. IJERPH. 18(2):411.
  • Casady CB, Baxter D. 2020. Pandemics, public-private partnerships (PPPs), and force majeure| COVID-19 expectations and implications. Const Manag Econ. 38(12):1077–1085.
  • Chigara B, Moyo T. 2022. Factors affecting the delivery of optimum health and safety on construction projects during the covid-19 pandemic in Zimbabwe. JEDT. 20(1):24–46.
  • Collis J, Hussey R. 2014. Business research: a practical guide for undergraduate and postgraduate students. London: Palgrave Macmillan.
  • Cox A. 2008. What’s wrong with risk matrices? Risk Anal. 28(2):497–512.
  • Creswell JW, Creswell JD. 2017. Research design: qualitative, quantitative, and mixed methods approaches. CA, United States: Sage publications.
  • Deloitte. 2017. Deloitte GCC powers of construction 2017, If it’s fundable it’s feasible [online]; [accessed 2022 Aug 23]. https://www2.deloitte.com/content/dam/Deloitte/xe/Documents/realestate/construction/gccpowersofconstruction/me_construction_gccpoc2017.pdf#.
  • Elnaggar SM, Elhegazy H. 2022. Study the impact of the COVID-19 pandemic on the construction industry in Egypt. In Structures. 35:1270–1277.
  • Encinas E, Simons A, Sattineni A. 2021. Impact of COVID-19 on Communications within the Construction Industry. EPiC Series in Built Environment. 2:165–172.
  • Gill I, Schellekens. 2021. COVID-19 is a developing country pandemic [online] [accessed 2022 Jun 17]. https://www.brookings.edu/blog/future-development/2021/05/27/covid-19-is-a-developing-country-pandemic/.
  • Gunduz M, Nielsen Y, Ozdemir M. 2015. Fuzzy assessment model to estimate the probability of delay in Turkish construction projects. J Manage Eng. 31(4):4014055.
  • Harthi BAA. 2015. Risk management in fast-track projects: a study of UAE construction projects [Doctoral dissertation]. University of Wolverhampton.
  • IOM (International Organization for Migraiton). 2020. Impact of COVID19 on small and medium-sized enterprises in Iraq [online]; [accessed 2022 Aug 06].https://www.iom.int/.
  • Kassem MA, Khoiry MA, Hamzah N. 2019. Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. Int. Journal of Energy Sector. Management. 14(3):527–546.
  • Khalfan M, Ismail M. 2020, November. Engineering Projects and Crisis Management: A Descriptive Study on the Impact of COVID-19 on Engineering Projects in Bahrain. In 2020 2nd Int. Sustainability and Resilience Conf.: Technology and Innovation in Building Designs (pp. 1–5).
  • King SS, Rahman RA, Fauzi MA, Haron AT. 2022. Critical analysis of pandemic impact on AEC organizations: the COVID-19 case. JEDT. 20(1):358–383.
  • Krippendorff K. 2013. Content analysis: an introduction to its methodology. CA, United States: Sage publications.
  • Kukoyi PO, Simpeh F, Adebowale OJ, Agumba JN. 2022. Managing the risk and challenges of COVID-19 on construction sites in Lagos, Nigeria. JEDT. 20(1):99–144.
  • Market Research Iraq. 2021. Construction and infrastructure [online]; [accessed 2022 July 15]. https://www.marketresearchiraq.com/industry/construction-infrastructure.
  • Matsunaga H. 2019. The reconstruction of Iraq after 2003: learning from its successes and failure. WA, United States: World Bank Publications.
  • Muhammad SI, Madhav N. 2016. A Fuzzy-Bayesian model for risk assessment in power plant projects. Proceeding of Conference on ENTERprise Information Systems/Int. Conf. on Project MANagement/Conference on Health and Social Care Information Systems and Technologies, CENTERIS/ProjMAN/HCist 2016, October 5–7, 2016 (pp. 963–970).
  • Nguyen VT, Nguyen BN, Nguyen TQ, Dinh HT, Chu AT. 2021. The impact of the COVID-19 on the construction industry in Vietnam. Int J of BES. 8(3):47–61.
  • Nyumba T, Wilson K, Derrick CJ, Mukherjee N. 2018. The use of focus group discussion methodology: insights from two decades of application in conservation. Methods Ecol Evol. 9(1):20–32.
  • OECD (Organisation for Economic Co-operation and Development). 2020. Coronavirus (COVID-19): SME policy responses [online]; [accessed 2022 July 01]. https://www.oecd.org.
  • Olanrewaju OI, Chileshe N, Adekunle EO, Salihu C. 2022. Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. Int J Const Manag. 1–14. DOI: 10.1080/15623599.2022.2120077.
  • Olatunde NA, Awodele IA, Adebayo BO. 2022. Impact of COVID-19 pandemic on indigenous contractors in a developing economy. JEDT. 20(1):267–280.
  • Olukolajo MA, Oyetunji AK, Oluleye IB. 2021. Covid-19 protocols: assessing construction site workers compliance. J Eng Design Technol. 20(1):115–131.
  • Pamidimukkala A, Kermanshachi S, Nipa J. 2021. Impacts of COVID-19 on Health and Safety of Workforce in Construction Industry. In: International Conference on Transportation and Development 2021. p. 418–430. DOI: 10.1061/9780784483541.039.
  • Qazi A, Shamayleh A, El-Sayegh S, Formaneck S. 2021. Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo Simulation approach. Sustainable Cities and Society. 65:102576.
  • Rehman MSU, Shafiq MT, Afzal M. 2022. Impact of COVID-19 on project performance in the UAE construction industry. JEDT. 20(1):245–266.
  • Renuka SM, Umarani C, Kamal S. 2014. A review on critical risk factors in the life cycle of construction projects. J Civil Eng Res. 4(2A):31–36.
  • Research and Markets. 2019. Construction in Iraq key trends and opportunities to 2023. Report ID: 4846333 [online]; [accessed 2022 Nov 16]. https://www.researchandmarkets.com/reports/4846333/construction-in-iraq-key-trends-and.
  • Ruqaishi M, Bashir, H, A. 2015. Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. J Mgt Eng. 31(3):5014017.
  • Salami BA, Ajayi SO, Oyegoke AS. 2021. Tackling the impacts of Covid-19 on construction projects: an exploration of contractual dispute avoidance measures adopted by construction firms. Int J Const Manag. 1–9. DOI: 10.1080/15623599.2021.1963561.
  • Shahbazi B, Akbarnezhad A, Rey D, Ahmadian FFA, Loosemore M. 2019. Optimization of job allocation in construction organizations to maximize workers’ career development opportunities. J Constr Eng Manage. 145(6):4019036.
  • Sierra F. 2022. COVID-19: main challenges during construction stage. ECAM. 29(4):1817–1834.
  • Stiles S, Golightly D, Ryan B. 2021. Impact of COVID‐19 on health and safety in the construction sector. Hum Factors Man. 31(4):425–437.
  • Strickland JT. 2020. Addressing financial impacts of the COVID-19 crisis on construction companies [online]. [accessed 2022 Sep 02]. https://www.natlawreview.com/article/addressing-financial-impacts-covid-19-crisis-construction-companies.
  • Tabish SZS, Jha KN. 2018. Beyond the iron triangle in public construction projects. J Constr Eng Manage. 144(8):4018067.
  • United Nations. 2019. World population prospects 2019: highlights [online]; [accessed 2022 Dec 05]. https://population.un.org/wpp/Publications/Files/WPP2019_Highlights.pdf.
  • Walter D. 2020. Implications of Covid-19 for labour and employment in India. Ind J Labour Econ. 63(S1):47–51.
  • World Bank. 2020. Iraq economic monitor, fall 2020: protecting vulnerable Iraqis in the time of a pandemic, the case for urgent stimulus and economic reforms [online]; [accessed 2022 Jun 13]. https://openknowledge.worldbank.org/handle/10986/34749. License: CC BY 3.0 IGO.
  • Yates JK. 2014. Design and construction for sustainable industrial construction. J Constr Eng Manage. 140(4):B4014005.
  • Zadeh LA. 1965. Fuzzy sets. Inf Control. 8(3):338–353.