4,673
Views
1
CrossRef citations to date
0
Altmetric
Research Articles

A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022)

, , &
Pages 997-1006 | Received 23 Sep 2022, Accepted 15 Mar 2023, Published online: 31 Mar 2023

References

  • Adlakha P, Puri H. 2003. Prefabrication building methodologies for low cost housing. IE (I) J. 84:4–9.
  • Alaloul WS, Altaf M, Musarat MA, Javed MF, Mosavi A. 2021. Systematic review of life cycle assessment and life cycle cost analysis for pavement and a case study. Sustainability. 13(8):1–5.
  • Alshamrani OS. 2017. Construction cost prediction model for conventional and sustainable college buildings in North America. J Taibah Univ Sci. 11(2):315–323.
  • Antillón EI, Morris MR, Gregor W, Kalsaas BT, Koskela L, Saurin TA. 2014. A value-based cost-benefit analysis of prefabrication processes in the healthcare sector: a case study. Paper Presented at the 22nd Annual Conference of the International Group for Lean Construction: Understanding and Improving Project Based Production, IGLC 2014.
  • Arashpour M, Bai Y, Aranda-Mena G, Bab-Hadiashar A, Hosseini R, Kalutara P. 2017. Optimizing decisions in advanced manufacturing of prefabricated products: theorizing supply chain configurations in off-site construction. Autom Constr. 84:146–153.
  • Augusto T, Mounir K, Melo AM. 2012. A cost optimization-based design of precast concrete floors using genetic algorithms. Autom Constr. 22:348–356.
  • Aye L, Ngo T, Crawford RH, Gammampila R, Mendis P. 2012. Life cycle greenhouse gas emissions and energy analysis of prefabricated reusable building modules. Energy Build. 47:159–168.
  • Azman M, Ahamad M, Hussin W. 2012. Comparative study on prefabrication construction process. Int Surv Res J. 2(1):45–58.
  • Baldwin A, Poon C, Shen L, Austin S, Wong I. 2009. Designing out waste in high-rise residential buildings: analysis of precasting methods and traditional construction. Renewable Energy. 34(9):2067–2073.
  • Blismas N, Pasquire C, Gibb A. 2006. Benefit evaluation for off-site production in construction. Constr Manage Econ. 24(2):121–130.
  • Blismas N, Wakefield R. 2009. Drivers, constraints and the future of offsite manufacture in Australia. Constr Innov. 9(1):72–83.
  • Boafo FE, Kim J, Kim J. 2016. Performance of modular prefabricated architecture: case study-based review and future pathways. Sustainability. 8(6):558.
  • Burnham JF. 2006. Scopus database: a review. Biomed Digit Libr. 3(1):1.
  • Chadegani AA, Salehi H, Yunus M, Farhadi H, Fooladi M, Farhadi M, et al. 2013. A comparison between two main academic literature collections: web of science and scopus databases. Asian Soc Sci. 9(5):18–26.
  • Chan TK. 2011. Comparison of precast construction costs - case studies in Australia and Malaysia. In: Proceedings of the 27th Annual ARCOM Conference; p. 3–12.
  • Chen C, Ibekwe SanJuan F, Hou J. 2010. The structure and dynamics of cocitation clusters: a multiple‐perspective cocitation analysis. J Assoc Inf Sci Technol. 61(7):1386–1409.
  • Chen W, Chen A, Liu J, Deng S. 2021. Research on production cost optimization of PC exterior wall panel based on hybrid genetic algorithm. In: ICCREM 2021; p. 687–693.
  • Chen W, Zhao Y, Yu Y, Chen K, Arashpour M. 2020. Collaborative scheduling of on-site and off-site operations in prefabrication. Sustainability. 12(21):1–23.
  • Chen Y, Okudan GE, Riley DR. 2010. Decision support for construction method selection in concrete buildings: prefabrication adoption and optimization. Autom Constr. 19(6):665–675.
  • Cheung FK, Rihan J, Tah J, Duce D, Kurul E. 2012. Early stage multi-level cost estimation for schematic BIM models. Autom Constr. 27:67–77.
  • Chiang Y, Chan EH, Lok LK. 2006. Prefabrication and barriers to entry—a case study of public housing and institutional buildings in Hong Kong. Habitat Int. 30(3):482–499.
  • De Albuquerque AT, El Debs MK, Melo AMC. 2012. A cost optimization-based design of precast concrete floors using genetic algorithms. Autom Constr. 22:348–356.
  • Demiralp G, Guven G, Ergen E. 2012. Analyzing the benefits of RFID technology for cost sharing in construction supply chains: a case study on prefabricated precast components. Autom Constr. 24:120–129.
  • Elhag T, Boussabaine A, Ballal T. 2005. Critical determinants of construction tendering costs: quantity surveyors’ standpoint. Int J Project Manage. 23(7):538–545.
  • Ershadi M, Goodarzi F. 2021. Core capabilities for achieving sustainable construction project management. Sustainable Prod Consumption. 28:1396–1410.
  • Friedman A. 1992. Prefabrication versus conventional construction in single‐family wood‐frame housing. Build Res Inf. 20(4):226–228.
  • Ghaleb H, Alhajlah HH, Bin Abdullah AA, Kassem MA, Al-Sharafi MA. 2022. A scientometric analysis and systematic literature review for construction project complexity. Buildings. 12(4):482.
  • Goodier C, Gibb A. 2007. Future opportunities for offsite in the UK. Constr Manage Econ. 25(6):585–595.
  • Goulding JS, Pour-Rahimian F, Arif M, Sharp MD. 2012. Offsite construction: strategic priorities for shaping the future research agenda. J Archit. 1(1):62–73.
  • Günaydın HM, Doğan S. 2004. A neural network approach for early cost estimation of structural systems of buildings. Int J Project Manage. 22(7):595–602.
  • Han Y, Skibniewski MJ, Wang L. 2017. A market equilibrium supply chain model for supporting self-manufacturing or outsourcing decisions in prefabricated construction. Sustainability. 9(11):21–25.
  • Hong J, Shen GQ, Mao C, Li Z, Li K. 2016. Life-cycle energy analysis of prefabricated building components: an input–output-based hybrid model. J Cleaner Prod. 112:2198–2207.
  • Horry R, Booth CA, Mahamadu AM, Manu P, Georgakis P. 2021. Environmental management systems in the architectural, engineering and construction sectors: a roadmap to aid the delivery of the sustainable development goals. Environ Dev Sustainability. 1:15–20.
  • Howes R. 2002. Industrialized housing construction—The UK experience. In: Advances in building technology. New York: Elsevier; p. 383–390.
  • Jaillon L, Poon C, Chiang YH. 2009. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. Waste Manage (Oxford). 29(1):309–320.
  • Jeong J, Hong T, Ji C, Kim J, Lee M, Jeong K, Lee S. 2017. An integrated evaluation of productivity, cost and CO2 emission between prefabricated and conventional columns. J Cleaner Prod. 142:2393–2406.
  • Ji Y, Liu G, Qi Y. 2019. Research on identification of influencing factors of prefabrication building cost based on improved entropy and DEMATEL method. In: ICCREM 2019: Innovative Construction Project Management and Construction Industrialization; p. 570–576.
  • Jin R, Zou Y, Gidado K, Ashton P, Painting N. 2019. Scientometric analysis of BIM-based research in construction engineering and management. Eng Constr Archit Manage. 26(8):1750–1776.
  • Kim YW, Han SH, Yi JS, Chang SW. 2016. Supply chain cost model for prefabricated building material based on time-driven activity-based costing. Can J Civ Eng. 43(4):287–293.
  • Kurpinska M, Grzyl B, Kristowski A. 2019. Cost analysis of prefabricated elements of the ordinary and lightweight concrete walls in residential construction. Materials. 12(21):3629.
  • Lee S, Kim K, Yu J. 2014. BIM and ontology-based approach for building cost estimation. Autom Constr. 41:96–105.
  • Li CZ, Hong J, Xue F, Shen GQ, Xu X, Luo L. 2016. SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong. Habitat Int. 57:74–87.
  • Li Z, Shen GQ, Xue X. 2014. Critical review of the research on the management of prefabricated construction. Habitat Int. 43:240–249.
  • Lopez D, Froese TM. 2016. Analysis of costs and benefits of panelized and modular prefabricated homes. Proc Eng. 145:1291–1297.
  • Lou E, Kamar K. 2012. Industrialized building systems: strategic outlook for manufactured construction in Malaysia. J Archit Eng. 18(2):69–74.
  • Lu N. 2009. The current use of offsite construction techniques in the United States construction industry. In: Construction Research Congress 2009: Building a Sustainable Future; p. 946–955.
  • Manikandan SA, Pazhani K. 2016. Prefabrication construction the time and cost analysis assist of artificial neural network. J Comput Theor Nanosci. 13(8):5605–5612.
  • Mao C, Xie F, Hou L, Wu P, Wang J, Wang X. 2016. Cost analysis for sustainable off-site construction based on a multiple-case study in China. Habitat Int. 57:215–222.
  • Mattone R. 1990. Ferrocement, prefabrication, self-help for low cost housing. J Ferrocement. 20(2):143–148.
  • Mikušková D. 2014. The idea of modularity and small prefabrication of low-cost housing concepts. Adv Mater Res. 899:615–618.
  • Musarat MA, Hameed N, Altaf M, Alaloul WS, Salaheen MA, Alawag AM. 2021. Digital transformation of the construction industry: a review. In: 2021 International Conference on Decision Aid Sciences and Application (DASA); IEEE. p. 897–902.
  • Pan W, Sidwell R. 2011. Demystifying the cost barriers to offsite construction in the UK. Constr Manage Econ. 29(11):1081–1099.
  • Park M, Ingawale-Verma Y, Kim W, Ham Y. 2011. Construction policymaking: with an example of Singaporean government’s policy to diffuse prefabrication to private sector. KSCE J Civ Eng. 15(5):771–779.
  • Parskiy N, Molodtsov M, Molodtsova V. 2017. Cost effectiveness of precast reinforced concrete roof slabs. Paper presented at the IOP Conference Series: Materials Science and Engineering. Vol. 262. IOP Publishing; p. 012036.
  • Patel, Shirish B. 1977. Examples of low cost housing projects - Acritical study of large panel prefabrication and in-situ construction. Int J Hous Sci Appl. 1(3):299–306.
  • Polat G, Ballard G. 2005 Jul. Comparison of the economics of on-site and off-site fabrication of rebar in Turkey. In: Proceeding of the 13th Annual Conference of the International Group for Lean Construction (IGLC 13); pp. 439–447.
  • Ramli MZ, Hanipah MH, Zawawi MH, Abidin MZZ, Zainal NA, Halim NSA. 2016. Cost comparison on industrialized building system (IBS) and conventional method for school construction project. J Sci Res Dev. 3(4):95–101.
  • Rousseeuw PJ. 1987. Silhouettes: a graphical aid to the interpretation and validation of cluster analysis. J Comput Appl Math. 20:53–65.
  • Samani P, Gregory J, Leal V, Mendes A, Correia N. 2018. Lifecycle cost analysis of prefabricated composite and masonry buildings: comparative study. J Archit Eng. 24(1):4–5.
  • Shibata N, Kajikawa Y, Takeda Y, Matsushima K. 2008. Detecting emerging research fronts based on topological measures in citation networks of scientific publications. Technovation. 28(11):758–775.
  • Shukor A, Mohammad MF, Mahbub R. 2011 Jun 20–23. Supply chain integration challenges in project procurement in Malaysia: IBS contractors’ perspective. Paper presented at the Management and Innovation for a Sustainable Built Environment MISBE 2011, Amsterdam, The Netherlands.
  • Small H. 1973. Co‐citation in the scientific literature: a new measure of the relationship between two documents. J Assoc Inf Sci Technol. 24(4):265–269.
  • Tam VW, Tam CM, Zeng SX, Ng WC. 2007. Towards adoption of prefabrication in construction. Build Environ. 42(10):3642–3654.
  • Tariq U. 2020. Key factors influencing the implementation of three-dimensional printing in construction. Proc Inst Civ Eng- Manage Procurement Law. 174(3):104–117.
  • Taylor MD. 2010. A definition and valuation of the UK offsite construction sector. Constr Manage Econ. 28(8):885–896.
  • Tazikova A, Struková Z. 2021. The impact of logistics on the cost of prefabricated construction. Acta Logistica. 8(1):65–71.
  • Thanoon WA, Peng LW, Kadir MRA, Jaafar MS, Salit MS. 2003. The experiences of Malaysia and other countries in industrialised building system. In: Proceeding of International Conference on Industrialised Building Systems.
  • The Ministry of Urban-Rural Construction. 2013. Action plan of green building. Beijing: The Ministry of Urban-Rural Construction.
  • The State Council. 2016. Several opinions on further strengthening the management of urban planning and construction. Beijing: The State Council.
  • Treppke D. 1998. Flexible prefaabrication - more cost efficient. Concr Precasting Plant Technol. 64(2):82–88.
  • Vieira ES, Gomes JANF. 2009. A comparison of Scopus and Web of Science for a typical university. Scientometrics. 81(2):587–600.
  • Vogel G. 1998. More intelligent and freater cost-effectiveness prefabrication. Concr Precasting Plant Technol. 64(2):75–78.
  • Vukomanović M, Kararić M. 2009. Model for cost prediction of prefabricated housing. Tehnicki Vjesnik. 16(3):39–43.
  • Wang H, Zhang Y, Gao W, Kuroki S. 2020. Life cycle environmental and cost performance of prefabricated buildings. Sustainability. 12(7):14–17.
  • Wang Z, Hu H. 2017. Improved precast production-scheduling model considering the whole supply chain. J Comput Civ Eng. 31(4):3–5.
  • Wong CH, Samad MHA, Taib N. 2021. Potential and limitation of AI system in building services and control management system. IOP Conf Ser: Earth Environ Sci. 10(1):159.
  • Xue H, Zhang S, Su Y, Wu Z. 2017. Factors affecting the capital cost of prefabrication-A case study of China. Sustainability. 9(9):1–4.
  • Xue H, Zhang S, Su Y, Wu Z. 2018. Capital cost optimization for prefabrication: a factor analysis evaluation model. Sustainability. 10(1):159.
  • Xue H, Zhang S, Su Y. 2013. Factors affecting the capital cost of prefabrication in China: perception and practice. J Manage Eng. 23:34–54.
  • Ye M, Wang J, Si X, Zhao S, Huang Q. 2022. Analysis on dynamic evolution of the cost risk of prefabricated building based on DBN. Sustainability. 14(3):1–4.
  • Zahra SA. 2007. Contextualizing theory building in entrepreneurship research. J Bus Venturing. 22(3):443–452.
  • Zhang W, Kang K, Zhong RY. 2021. A cost evaluation model for IoT-enabled prefabricated construction supply chain management. Ind Manage Data Syst. 121(12):2738–2759.
  • Zhang X, Platten A, Shen L. 2011. Green property development practice in China: costs and barriers. Build Environ. 46(11):2153–2160.
  • Zhao Y, Chen W, Arashpour M, Yang Z, Shao C, Li CJE. 2021. Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Eng Constr Archit Manage. 29(4):1753–1776.
  • Zhong C, Zhang M, Cui X, Liu Z. 2020. Comprehensive evaluation of china’s prefabricated decoration cost based on analytic hierarchy process. Adv Civ Eng. 2020:1–10.