223
Views
0
CrossRef citations to date
0
Altmetric
Articles

Building commissioning process and documentation: a literature review and directions for future research

&
Pages 75-85 | Received 02 Nov 2022, Accepted 21 Mar 2023, Published online: 25 May 2023

References

  • Ágústsson RO, Jensen PA. 2012. Building commissioning: what can Denmark learn from the U.S. experience? J Perform Constr Facil. 26(3):271–278.
  • Ahmed A, Ploennigs J, Menzel K, Cahill B. 2010. Multi-dimensional building performance data management for continuous commissioning. Adv Eng Inf. 24(4):466–475.
  • Alam M, Phung VM, Zou P, Jay S. 2017. Risk Identification and Assessment for Construction and Commissioning Stages of a Building Energy Retrofit Project. 22nd International Conference of Advancement of Construction Management and Real Estate.
  • Alarifi A, Al-Salman A, Alsaleh M, Alnafessah A, Al-Hadhrami S, Al-Ammar MA, Al-Khalifa HS. 2016. Ultra-wideband indoor positioning technologies: analysis and recent advances. Sensors. 16(5):707.
  • Alder A. 2014. Commissioning the green building, Green Building: project Planning and Cost Estimating, p. 317–333.
  • Bjørnskov J, Jradi M, Veje C. 2022. Component-level re-commissioning of a newly retrofitted Danish healthcare building. J Build Eng. 51:104277. ISSN 2352-7102,
  • Beste T. 2021. Effect of systematic completion on public construction projects. Facilities. 39(3/4):156–171.
  • Bowman M, Wolpert JS. 2006. Facility information systems for post-occupancy commissioning. ASHRAE J. 48(6)24-26, :28–31.
  • Briones V, McFarlane D. 2013. Technical vs. process commissioning: basis of design. ASHRAE Journal. 55(10):76–81.
  • Bruton K, Raftery P, O'Donovan P, Aughney N, Keane MM, O'Sullivan DTJ. 2014. Development and alpha testing of a cloud based automated fault detection and diagnosis tool for Air Handling Units. Autom Constr. 39:70–83. ISSN 09265805
  • Bynum J, Claridge D, Curtin J. 2012. Development and Testing of an Automated Building Commissioning Analysis Tool (ABCAT). Energy Build. 55:607–617.
  • California Consumer Privacy Act (CCPA). 2020. Maximize the benefits of information lifecycle management. https://www.ironmountain.com/blogs/2020/maximize-the-benefits-of-information-lifecycle-management.
  • Casault PE. Accessed in 2022. The Building Commissioning Process. https://www.appa.org/bok/the-building-commissioning-process/.
  • Chen C, Dib HY, Lasker GC. 2011. Benefits of Implementing Building Information Modeling for Healthcare Facility Commissioning. International Workshop on Computing in Civil Engineering
  • Chinmack M, Sycuro J. 2016. Commissioning and the technology evolution. Consulting-Specifying Eng. 53 (2):DE1–DE4.
  • Claridge DE, Lin G. 2009. Retrospective Testing of an Automated Building Commissioning Analysis Tool (ABCAT). Energy Systems Laboratory. https://hdl.handle.net/1969.1/86181.
  • Coyner RC, Kramer SW. 2017. Long term benefits of building commissioning: should owners pay the price? Procedia Eng. 196:429–435.
  • Crowe J. 2019. The basics of building commissioning. https://www.bdcnetwork.com/blog/basics-building-commissioning.
  • Crowe E, Mills E, Poeling T, Curtin C, Bjørnskov D, Fischer L, Granderson J. 2020. Building commissioning costs and savings across three decades and 1500 North American buildings. Energy Build. 227:110408.
  • D’Antino P. 2010. How to start A: retrocommissioning. Consulting-Specifying Eng. 47(1):30–34.
  • Eastman CM, Teicholz P, Sacks R, Liston K. 2011. BIM Handbook: a Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors. New Jersey: wiley
  • Elzarka HM. 2009. Best practices for procuring commissioning services. J Manage Eng. 25(3):155–164.
  • EssamShaawat M, Alyagoub M. 2019. Supply chain management in building commissioning process in accordance with the leadership in energy & environmental design (LEED) – A case study of KSA construction industry. Int J Supply Chain Manage. 8:1144–1159.
  • Freeman R. 2017. What is building commissioning? https://robfreeman.com/what-building-commissioning/.
  • Ferretti NM, Miyata M, Baumann O. 2018. A retrospective on the impact of Annex 40 and Annex 47 research on the international state of building commissioning. Energy Build. 158:54–61.
  • Gilbert SW. 2013. Benefits and costs of commissioning: a case study analysis. National Institute of Standards and Technology (NIST). https://nvlpubs.nist.gov/nistpubs/ir/2013/NIST.IR.7964.pdf.
  • Gilani S, Quinn C, McArthur JJ. 2020. A review of ontologies within the domain of smart and ongoing commissioning. Build Environ. 182:107099. ISSN 0360-1323,
  • Gillis WL, Cudney EA. 2015. A methodology for applying quality function deployment to the commissioning process. Eng Manage J. 27(4):177–187.
  • Ginestet S, Marchio D, Morisot O. 2013. Improvement of buildings energy efficiency: comparison, operability and results of commissioning tools. Energy Convers Manage. 76:368–376. ISSN 01968904
  • Goedert J, Meadati P. 2008. Integrating construction process documentation into building information modeling. J Constr Eng Manage. 134(7):509–516.
  • Gunay B, Shen W, Yang C. 2017. Characterization of a building’s operation using automation data: a review and case study. Build Environ. 118:196–210. SSN 03601323
  • Guo HL, Li H, Skitmore M. 2010. Life-cycle management of construction projects based on virtual prototyping technology. J Manage Eng. 26(1):41–47.
  • Halmetoja E. 2019. The conditions data model supporting building information models in facility management. Facilities. 37(7/8):484–501.
  • Harris N, Shealy T, Parrish K, Granderson J. 2019. Cognitive barriers during monitoring-based commissioning of buildings. Sustain Cities Soc. 46:101389.
  • Harris N, Shealy T, Kramer H, Granderson J, Reichard G. 2018. A framework for monitoring-based commissioning: identifying variables that act as barriers and enablers to the process. Energy Build. 168:331–346.
  • Hermans M, Volker H, Eisma P. 2014. A public commissioning maturity model for construction clients. In: Raiden AB, Aboagye-Nimo E, editors. Procs 30th Annual ARCOM Conference, 1–3 Sep., Portsmouth, UK, Association of Researchers in Construction Management; p. 1305–1314.
  • Hoeber JG, Alsem DM, Willems PH. 2015. The management of information over the life cycle of a construction project using open-standard BIM. Proc. of the 32nd CIB W78 Conference, Eindhoven, Netherlands. Eindhoven University of Technology. https://itc.scix.net/pdfs/w78-2015-paper-030.pdf.
  • Hutchins PF. 2016. Automated ongoing commissioning via building control systems. Energy Eng. 113(1):11–20.
  • Isazadeh A, Kamal R, Yagua C, Eluvathingal S, Claridge DE. 2021. Detecting deficiencies using building performance data in healthcare facilities: improving operational efficiency with Continuous Commissioning. Energy Build. 241:110953. ISSN 0378-7788.
  • Jallow AK, Demian P, Baldwin A, Anumba CJ. 2008. Lifecycle approach to requirements information management in construction projects: state-of-the-art and future trends. Loughborough University. Conference contribution. https://hdl.handle.net/2134/5901.
  • Jradi M, Arendt K, Sangogboye FC, Mattera CG, Markoska E, Kjærgaard MB, Veje CT, Jørgensen BN. 2018. ObepME: an online building energy performance monitoring and evaluation tool to reduce energy performance gaps. Energy Build. 166:196–209. ISSN 03787788
  • Jradi M, Boel N, Madsen BE, Jacobsen J, Hooge JS, Kildelund L. 2021. BuildCOM: automated auditing and continuous commissioning of next generation building management systems. Energy Inform. 4(1):2.
  • Jradi M, Liu N, Johansen A, Arendt K, Mattera CG, Kjærgaard MB, Veje CT, Jørgensen BN. 2019. Dynamic Energy Model-Based Automatic Building Performance Testing for Continuous Commissioning. Building Simulation Conference Proceedings.
  • Juszczyk M, Kozik R, Leśniak A, Plebankiewicz E, Zima K. 2014. Errors in the preparation of design documentation in public procurement in Poland. Procedia Eng. 85:283–292.
  • Kantola M, Saari A. 2014. Commissioning for nearly zero-energy building projects. Constr Innov. 14(3):370–382.
  • Kim D-B, Kim DD, Kim T. 2019. Energy performance assessment of HVAC commissioning using long-term monitoring data: a case study of the newly built office building in South Korea. Energy Build. 204:109465.
  • Kim JW, Kim TH, Choi JW, Jeong YK, Lee IW. 2015. Implementation of ICT-based building ongoing commissioning system. International Conference on Information and Communication Technology Convergence (ICTC), pp. 1167–1170.
  • Kim S, Poirier EA, Staub-French S. 2020. Information commissioning: bridging the gap between digital and physical built assets. JFM. 18(3):231–245.
  • Kramer H, Lin G, Curtin C, Crowe E, Granderson J. 2020. Building analytics and monitoring-based commissioning: industry practice, costs, and savings. Energy Effic. 13(3):537–549.
  • Kjerulf L, Jensen PA. 2020. Strategies for Commissioning Processes to Ensure Sustainable Building Performance. IOP Conf Ser: Earth Environ Sci. 588, 1.11–1.14.
  • Leal S, Zucker G, Hauer S, Judex F. 2014. A software architecture for simulation support in building automation. Buildings. 4(3):320–335.
  • Lee JM, Quinn SW. 2018. Addressing operational challenges in commercial facilities using automated ongoing commissioning. Strateg Plan fEnergy Environ. 37(3):8–16.
  • Lord SF, Noye S, Ure J, Tennant MG, Fisk DJ. 2016. Comparative review of building commissioning regulation: a quality perspective. Build Research Inf. 44(5-6):630–643.
  • Li P, Lu Y, Qian Y, Wang Y, Liang W. 2022. An explanatory parametric model to predict comprehensive post-commissioning building performances. Build Environ. 213:108897. volume, ISSN 0360-1323
  • Liu M, Joo IS, Song L, Wang J, Hansen K, Selzer A. 2004. Implementing the continuous commissioning process in retrofit projects. J Assoc Energy Eng. 101(4):37–58.
  • Mantha B, Soto B, Karri R. 2021. Cyber security threat modeling in the AEC industry: an example for the commissioning of the built environment. Sustain Cities Soc. 66:102682. volumeISSN 2210-6707,
  • Mannino A, Dejaco M, Cecconi F. 2021. Building information modelling and internet of things integration for facility management-literature review and future needs. Appl Sci. 11(7):3062.
  • Mattera CG, Lazarova-Molnar S, Shaker HR, Jørgensen BN. 2017. A practical approach to validation of buildings’ sensor data: a commissioning experience report. IEEE Third International Conference on Big Data Computing Service and Applications (BigDataService), 287–292,
  • McFarlane D, Gordon S. 2014. Ongoing commissioning. ASHRAE J. 56(11):26–34.
  • McFarlane D, Ashrae M, Farmer T. 2014. Design phase commissioning. ASHRAE J. 56(2):52–57.
  • McFarlane D. 2013. Technical vs. process commissioning. ASHRAE J. 55(6):28–34.
  • Mehta ML, Scarborough W, Armpriest D. 2018. Building Construction: principles, Materials, and Systems, (Chapter 1: An Overview of the Building Delivery Process (How Buildings Come into Being). 3rd Edition. Pearson. ISBN 13 - 978-0134454177.
  • Mills E, Mathew PA. 2014. Monitoring-based commissioning: benchmarking analysis of 24 university buildings in California. Energy Eng. 111(4):7–24.
  • Montgomery RD, Lenzi WR. 2016. Commissioning and design for 2016 Olympics. ASHRAE J. 58(7):14–19.
  • Moral M, Akinci B, Berges M. 2014. Information Exchange Requirements to Support Commissioning of HVAC and Building Envelope Components During an Energy Retrofit Project—A Comparative Case Study. International Conference on Computing in Civil and Building Engineering,
  • Noye S, North R, Fisk D. 2016. Smart systems commissioning for energy efficient buildings. Build Serv Eng Res Technol. 37(2):194–204.
  • Noye S, North R, Fisk D. 2018. A wireless sensor network prototype for post-occupancy troubleshooting of building systems. Autom Constr. 89:225–234.
  • Olli T, Ilkka R, Markku H, Hannu K, Kauppinen T. 2020. Monitoring and continuous commissioning of new and existing buildings. E3S Web Conf. 172:22009.
  • Painter B, Brown N, Cook M. 2012. Practical application of a sensor overlay system for building monitoring and commissioning. Energy Build. 48:29–39.
  • PAS 1192-3 2014. Specification for information management for the operational phase of assets using building information modelling.
  • Potts K, Wall M. 2002. Managing the commissioning of building services. Engi Constr Architect Manage. 9(4):336–344.
  • Renaud V, Christophe N, Christophe C. 2008. IFC and building lifecycle management. Automat. Constr. 18:70–78.
  • Roth KW, Westphalen D, Brodick J. 2007. Ongoing commissioning. ASHRAE J. 50(3):66 + 69–71.
  • Santos A, Liu N, Jradi M. 2021. AUSTRET: An Automated Step Response Testing Tool for Building Automation and Control Systems. Energies. 14(13):3972.
  • Seewald J. 2014. Tablet as building engineering tool, part 3: commissioning. Eng Syst. 31(1):68–72.
  • Thompson D, Burman E, Mumovic D, Davies M. 2022. Managing the risk of the energy performance gap in non-domestic buildings. Build Serv Eng Res Technol. 43(1):57–88.
  • Tremblay V, Zmeureanu R. 2014. Benchmarking models for the ongoing commissioning of heat recovery process in a central heating and cooling plant. Energy. 70:194–203.
  • Turkaslan-Bulbul MT, Akin O. 2006. Computational support for building evaluation: embedded Commissioning Model. Autom Constr. 15(4):438–447.
  • U.S. Department of Energy (DOE). 1998. Building Commissioning Guide. V2.2 https://www.energy.gov/sites/prod/files/2013/12/f5/sustainable_guide_ch9.pdf.
  • U.S. Department of Energy (DOE). 2011. A guide to building commissioning. https://www.pnnl.gov/main/publications/external/technical_reports/PNNL-21003.pdf.
  • WBDG Commissioning Committee 2022. Building Commissioning: the Process. Whole Building Design Guide. https://www.wbdg.org/building-commissioning.
  • Wang L, Greenberg S, Fiegel J, Rubalcava A, Earni S, Pang X, Yin R, Woodworth S, Hernandez-Maldonado J. 2013. Monitoring-based HVAC commissioning of an existing office building for energy efficiency. Appl Energy. 102:1382–1390. ISSN 03062619
  • Ward P, Ward D, Hatten M, Wymelenberg KVD. 2018. Developing a Process for Continuous Commissioning. IECON 2018 - 44th Annual Conference of the IEEE Industrial Electronics Society, 801–806,
  • Wong JKW, Ge J, He SX. 2018. Digitisation in facilities management: A literature review and future research directions. Autom. Constr. 92:312–326.
  • Wu W, Issa RRA. 2012. BIM-Enabled Building Commissioning and Handover. International Conference on Computing in Civil Engineering.
  • Wei PE. 2003. Key Procedures for Continuous Commissioning® of a Large Campus with Multiple Buildings. Architectural Engineering Conference (AEI).
  • Xu X, Ma L, Ding L. 2014. A Framework for BIM-Enabled Life-Cycle Information Management of Construction Project. Int J Adv Rob Syst. 11(8):126.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.