References
- [AIA] American Institute of Architects. 2007. Integrated Project Delivery: a Guide. Sacramento, CA. p. 62.
- Abdallah A, Assaf S, Hassanain A. 2019. Assessment of the consequences of deficiencies in design documents in Saudi Arabia. Architect Engng Design Manage. 15(4):282–296.
- Akbiyikli R, Eaton D. 2012. Design and design management in building projects: a review. Eng Sci. 7:322–333.
- Andi, Minato T. 2003. Design documents quality in the Japanese construction industry: factors influencing and impacts on construction process. Int J Project Manage. 21(7):537–546.
- Assaf S, Hassanain MA, Abdallah A. 2018. Review and assessment of the causes of deficiencies in design documents for large construction projects. IJBPA. 36(3):300–317.
- Austin S, Baldwin A, Li B, Waskett P. 2000. Application of the analytical design planning technique to construction project management. Project Manage J. 31(2):48–59.
- Baldwin AN, Austin SA, Hassan TM, Thorpe A. 1999. Modelling information flow during the conceptual and schematic stages of building design. Construct Manage Eco. 17(2):155–167.
- Berger PL, Luckmann T. 1967. The social construction of reality: a treatise in the sociology of knowledge. New York, NY: Anchor.
- Bibby L, Austin S, Bouchlaghem NM. 2003a. Defining an improvement plan to address design management practices within a UK construction company.
- Bibby L, Bouchlaghem D, Austin S. 2003b. Design management in practice: testing a training initiative to deliver tools and learning. Construct Innov. 3(4):217–229.
- Burati JL, Farrington JJ, Ledbetter WB. 1992. Causes of quality deviations in design and construction. J Constr Eng Manage. 118(1):34–49.
- Edmondson AC, McManus SE. 2007. Methodological fit in management field research. AMR. 32(4):1246–1264.
- Eisenhardt KM. 1989. Building theories from case study research. Acad Manage Rev. 14(4):532–550.
- Gamil Y, Abdul Rahman I. 2020. Assessment of critical factors contributing to construction failure in Yemen. Intern J Construct Manage. 20(5):429–436.
- Grodal S, Anteby M, Holm AL. 2021. Achieving rigor in qualitative analysis: the role of active categorization in theory building. AMR. 46(3):591–612.
- Josephson PE, Larsson B, Li H. 2002. Illustrative benchmarking rework and rework costs in Swedish construction industry. J Manage Eng. 18(2):76–83.
- Knotten V, Lædre O, Hansen GK. 2017. Building design management–key success factors. Architect Engng Design Manage. 13(6):479–493.
- Koo HJ, O’Connor JT. 2021. Complexity analysis of design deliverable defects on building projects. J Manage Eng. 37(3):04021014.
- Koo HJ, O’Connor JT. 2022. A strategy for building design quality improvement through BIM capability analysis. J Constr Eng Manage. 148(8):04022066.
- Love PE, Lopez R, Kim JT, Kim MJ. 2014. Probabilistic assessment of design error costs. J Perform Constr Facil. 28(3):518–527.
- O’Connor JT, Koo HJ. 2021. Proactive design quality assessment tool for building projects. J Constr Eng Manage. 147(2):04020174.
- Owen R, Amor R, Palmer M, Dickinson J, Tatum CB, Kazi AS, Prins M, Kiviniemi A, East B. 2010. Challenges for integrated design and delivery solutions. Architect Engng Design Manage. 6(4):232–240.
- Searle JR, Willis S. 1995. The construction of social reality. New York, NY: Simon and Schuster.
- Sebastian R, Arch B. 2002. Enhancing international multi-architect collaborative building projects through architectural design management. In Proceedings of the 4th International Symposium on Architectural Interchanges in Asia. Chongqing– China.
- Shoar S, Payan S. 2022. A qualitative system dynamics approach to modeling the causes and effects of design deficiencies in construction projects. JFM. 20(4):558–569.
- Strauss AL, Corbin JM. 1990. Basics of qualitative research: grounded theory procedures and techniques. Los Angeles, CA: SAGE.
- Sutrisna M, Goulding J. 2019. Managing information flow and design processes to reduce design risks in offsite construction projects. ECAM. 26(2):267–284.
- Tribelsky E, Sacks R. 2010. Measuring information flow in the detailed design of construction projects. Res Eng Design. 21(3):189–206.
- van der Meer J, Hartmann A, van der Horst A, Dewulf G. 2020. Multi-criteria decision analysis and quality of design decisions in infrastructure tenders: a contractor’s perspective. Construction Management and Economics. 38(2):172–188.
- Yap JBH, Abdul-Rahman H, Wang C. 2018. Preventive mitigation of overruns with project communication management and continuous learning: PLS-SEM approach. J Constr Eng Manage. 144(5):4018025.
- Yap JBH, Skitmore M, Gray J, Shavarebi K. 2019. Systemic view to understanding design change causation and exploitation of communications and knowledge. Project Management Journal. 50(3):288–305.
- Yin RK. 2003. Case study research: design and methods. Thousand Oaks, CA: SAGE.