Causes of time and cost overruns in construction projects: a scoping review

, &
Pages 1107-1125 | Received 11 Feb 2023, Accepted 10 Aug 2023, Published online: 12 Sep 2023

References

  • Abd El-Razek ME, Bassioni HA, Mobarak AM. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841. doi:10.1061/(ASCE)0733-9364(2008)134:11(831).
  • Adam A, Josephson PEB, Lindahl G. 2017. Aggregation of factors causing cost overruns and time delays in large public construction projects: trends and implications. ECAM. 24(3):393–406. doi:10.1108/ECAM-09-2015-0135.
  • Agyekum-Mensah G, Knight AD. 2017. The professionals’ perspective on the causes of project delay in the construction industry. ECAM. 24(5):828–841. doi:10.1108/ECAM-03-2016-0085.
  • Ahiaga D, Love P, Smith S, Ackerman F. 2017. Toward a systemic view to cost overrun causation in infrastructure projects. Project Manage J. 48(2):88–98.
  • Ahiaga-Dagbui DD, Smith SD. 2014. Dealing with construction cost overruns using data mining. Constr Manage Econom. 32(7-8):682–694. doi:10.1080/01446193.2014.933854.
  • Ahsan K, Gunawan I. 2010. Analysis of cost and schedule performance of international development projects. Int J Project Manage. 28(1):68–78. doi:10.1016/j.ijproman.2009.03.005.
  • Alinaitwe H, Apolot R, Tindiwensi D. 2013. Investigation into the causes of delays and cost overruns in uganda’s public sector construction projects. J Constr Develop Countries. 18(2):33–47.
  • AlSehaimi A, Koskela L, Tzortzopoulos P. 2013. Need for alternative research approaches in construction management: case of delay studies. J Manage Eng. 29(4):407–413. doi:10.1061/(ASCE)ME.1943-5479.0000148.
  • Amarkhil Q, Elwakil E, Hubbard B. 2021. A meta-analysis of critical causes of project delay using Spearman’s rank and relative importance index integrated approach. Can J Civ Eng. 48(11):1498–1507. doi:10.1139/cjce-2020-0527.
  • Amoatey CT, Ameyaw YA, Adaku E, Famiyeh S. 2015. Analysing delay causes and effects in Ghanaian state housing construction projects [Article]. Int J Manag Projects Business. 8(1):198–214. doi:10.1108/IJMPB-04-2014-0035.
  • Arditi D, Akan GT, Gurdamar S. 1985. Reasons for delays in public projects in Turkey. Construct Manage Econom. 3(2):171–181. doi:10.1080/01446198500000013.
  • Arksey H, O'Malley L. 2005. Scoping studies: towards a methodological framework. Int J Social Res Methodol. 8(1):19–32. doi:10.1080/1364557032000119616.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Project Manage. 24(4):349–357. doi:10.1016/j.ijproman.2005.11.010.
  • Aziz RF. 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Eng J. 52(3):387–406. doi:10.1016/j.aej.2013.03.002.
  • Bajjou MS, Chafi A. 2020. Empirical study of schedule delay in Moroccan construction projects. Int J Constr Manage. 20(7):783–800. doi:10.1080/15623599.2018.1484859.
  • Batool A, Abbas F. 2017. Reasons for delay in selected hydro-power projects in Khyber Pakhtunkhwa (KPK), Pakistan. Renewable Sustainable Energy Rev. 73:196–204. doi:10.1016/j.rser.2017.01.040.
  • Bekr GA. 2015. Causes of delay in public construction projects in Iraq. Jordan J Civil Eng. 9(2):2015–2149.
  • Bhargava A, Anastasopoulos PC, Labi S, Sinha KC, Mannering FL. 2010. Three-stage least-squares analysis of time and cost overruns in construction contracts. J Constr Eng Manage. 136(11):1207–1218. doi:10.1061/(ASCE)CO.1943-7862.0000225.
  • Cantarelli CC, Molin EJE, Van Wee B, Flyvbjerg B. 2012. Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. Transport Policy. 22(April 2018):49–56. doi:10.1016/j.tranpol.2012.04.001.
  • Chan DWM, Kumaraswamy MM. 1996. An evaluation of construction time performance in the building industry. Build Environ. 31(6):569–578. doi:10.1016/0360-1323(96)00031-5.
  • Creedy GD, Skitmore M, Wong JKW. 2010. Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. J Constr Eng Manage. 136(5):528–537. doi:10.1061/(ASCE)CO.1943-7862.0000160.
  • Derakhshanalavijeh R, Teixeira JMC. 2016. Cost overrun in construction projects in developing countries, gas-oil industry of Iran as a case study. J Civil Eng Manage. 23(1):125–136. doi:10.3846/13923730.2014.992467.
  • Dlakwa MM, Culpin MF. 1990. Reasons for overrun in public sector construction projects in Nigeria. Int J Project Manage. 8(4):237–241. doi:10.1016/0263-7863(90)90032-7.
  • Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analysing factors affecting delays in Indian construction projects. Int J Project Manage. 30(4):479–489. doi:10.1016/j.ijproman.2011.10.004.
  • Durdyev S, Hosseini MR. 2020. Causes of delays on construction projects: a comprehensive list. Int J Manag Proj Bus. 13(1):20–46. doi:10.1108/IJMPB-09-2018-0178.
  • Durdyev S, Omarov M, Ismail S. 2017. Causes of delay in residential construction projects in Cambodia. Cogent Eng. 4(1):1291117. doi:10.1080/23311916.2017.1291117.
  • Enshassi A, Mohamed S, Abushaban S. 2009. Factors affecting the performance of construction projects in the gaza strip. J Civil Eng Manage. 15(3):269–280. doi:10.3846/1392-3730.2009.15.269-280.
  • Fallahnejad MH. 2013. Delay causes in Iran gas pipeline projects. Int J Project Manage. 31(1):136–146. doi:10.1016/j.ijproman.2012.06.003.
  • Flyvbjerg BENT, Skamris Holm MK, Buhl SL. 2004. What causes cost overrun in transport infrastructure projects? Transport Rev. 24(1):3–18. doi:10.1080/0144164032000080494a.
  • Flyvbjerg B, Bruzelius N, Rothengatter W. 2003. Megaprojects and risk: an anatomy of ambition. Cambridge: Cambridge University Press. doi:10.1017/CBO9781107050891.
  • Flyvbjerg B, Holm MS, Buhl S. 2002. Underestimating costs in public works projects: error or lie? J Am Plann Assoc. 68(3):279–295. doi:10.1080/01944360208976273.
  • Frimpong Y, Oluwoye J, Crawford L. 2003. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage. 21(5):321–326. doi:10.1016/S0263-7863(02)00055-8.
  • Gómez-Cabrera A, Muñoz S, Gutierrez-Bucheli L. 2023a. DATABASE. https://figshare.com/articles/dataset/DATABASE/22043663.
  • Gómez-Cabrera A, Muñoz S, Gutierrez-Bucheli L. 2023b. PRISMA checklist. figshare. https://figshare.com/articles/online_resource/PRISMA_checklist/22044110.
  • Gómez-Cabrera A, Sanz-Benlloch A, Montalban-Domingo L, Ponz-Tienda JL, Pellicer E. 2020. Identification of factors affecting the performance of rural road projects in Colombia. Sustainability. 12(18):7377. doi:10.3390/su12187377.
  • Gondia A, Siam A, El-Dakhakhni W, Nassar AH. 2020. Machine learning algorithms for construction projects delay risk prediction. J Constr Eng Manage. 146(1):04019085. doi:10.1061/(asce)co.1943-7862.0001736.
  • Gutierrez-Bucheli L, Reid A, Kidman G. 2022. Scoping reviews: their development and application in environmental and sustainability education research. Environ Educ Res. 28(5):645–673. doi:10.1080/13504622.2022.2047896.
  • Huo T, Ren H, Cai W, Shen GQ, Liu B, Zhu M, Wu H. 2018. Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: case study in Hong Kong. J Constr Eng Manage. 144(3):05018001–05018001. doi:10.1061/(ASCE)CO.1943-7862.0001444.
  • Islam MS, Suhariadi BT. 2018. Construction delays in privately funded large building projects in Bangladesh. Asian J Civ Eng. 19(4):415–429. doi:10.1007/s42107-018-0034-3.
  • Iyer KC, Jha KN. 2006. Critical factors affecting schedule performance: evidence from Indian construction projects. J Constr Eng Manage. 132(8):871–881. doi:10.1061/(ASCE)0733-9364(2006)132:8(871).
  • Jalal MP, Shoar S. 2017. A hybrid SD-DEMATEL approach to develop a delay model for construction projects. ECAM. 24(4):629–651. doi:10.1108/ECAM-02-2016-0056.
  • Johnson RM, Babu RII. 2020. Time and cost overruns in the UAE construction industry: a critical analysis. Int J Constr Manage. 20(5):402–411. doi:10.1080/15623599.2018.1484864.
  • Joshua O, Amusan L, Dolapo D. 2017. Cost and time performance information of building projects in developing economy. Int J Mech Eng Technol. 8(10):918–927. http://www.iaeme.com/IJMET/index.asp918http://www.iaeme.com/IJMET/issues.asp?JType=IJMET&VType=8&IType=10http://www.iaeme.com/IJMET/issues.asp?JType=IJMET&VType=8&IType=10.
  • Kamanga MJ, Steyn WJV. 2013. Causes of delay in road construction projects in Malawi [Article]. J South African Inst Civil Eng. 55(3):79–85. <Go to ISI>://WOS:000327411800009
  • Kaming PF, Olomolaiye PO, Holt GD, Harris FC. 1997. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construct Manage Econom. 15(1):83–94. doi:10.1080/014461997373132.
  • Knight K, Fayek AR. 2000. A preliminary study of the factors affecting the cost escalation of construction projects. Can J Civ Eng. 27(1):73–83. doi:10.1139/l99-057.
  • Larsen JK, Shen GQ, Lindhard SM, Brunoe TD. 2016. Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng. 32(1):10. Article 04015032. doi:10.1061/(asce)me.1943-5479.0000391.
  • Le-Hoai L, Lee YD, Lee JY. 2008. Delay and cost overruns in vietnam large construction projects: a comparison with other selected countries. KSCE J Civ Eng. 12(6):367–377. doi:10.1007/s12205-008-0367-7.
  • Lo TY, Fung IW, Tung KC. 2006. Construction delays in Hong Kong civil engineering projects. J Constr Eng Manage. 132(6):636–649. doi:10.1061/(ASCE)0733-9364(2006)132:6(636).
  • Love P. 2002. Influence of project type and procurement method on rework costs in building construction projects. J Constr Eng Manage. 128(1):18–29. doi:10.1061/(ASCE)0733-9364(2002)128:1(18).
  • Lozano Serna S, Patiño Galindo I, Gómez-Cabrera A, Torres A. 2018. Identificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombia. ingcienc. 14(27):117–151. doi:10.17230/ingciencia.14.27.6.
  • Mahamid I, Bruland A, Dmaidi N. 2012. Causes of delay in road construction projects. J Manage Eng. 28(3):300–310. doi:10.1061/.(asce)me.1943-5479.0000096.
  • Mansfield NR, Ugwu OO, Doran T. 1994. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage. 12(4):254–260. doi:10.1016/0263-7863(94)90050-7.
  • Mohd Tawil N, Khoiry MA, Arshad I, Hamzah N, Jasri M, Wan Badaruzzaman WH. 2013. Factors contribute to delay project construction in higher learning education: case study UKM. Res J Appl Sci Eng Technol. 5(11):3112–3116.
  • Muneeswaran G, Manoharan P, Awoyera PO, Adesina A. 2020. A statistical approach to assess the schedule delays and risks in Indian construction industry. Int J Construct Manage. 20(5):450–461. doi:10.1080/15623599.2018.1484991.
  • Munn Z, Peters MDJ, Stern C, Tufanaru C, McArthur A, Aromataris E. 2018. Systematic review or scoping review? Guidance for authors when choosing between a systematic or scoping review approach. BMC Med Res Methodol. 18(1):143–147. doi:10.1186/s12874-018-0611-x.
  • Okpala DC, Aniekwu AN. 1988. Causes of high costs of construction in Nigeria. J Constr Eng Manage. 114(2):233–244. doi:10.1061/.(ASCE)0733-9364(1988)114:2(233).
  • Olawale YA, Sun M. 2010. Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construct Manage Econom. 28(5):509–526. doi:10.1080/01446191003674519.
  • Park YI, Papadopoulou TC. 2012. Causes of cost overruns in transport infrastructure projects in Asia: their significance and relationship with project size. Built Environment Project and Asset Management. 2(2):195–216. doi:10.1108/20441241211280873.
  • Peters MDJ, Godfrey CM, Mclnerney P, Munn Z, Tricco AC, Khalil H. 2020. Chapter 11: scoping reviews. In Aromataris E, Munn Z, editors. JBI manual for evidence synthesis; p. 406–451. doi:10.46658/JBIMES-20-12.
  • Prasad KV, Vasugi V, Venkatesan R, Bhat NS. 2019. Critical causes of time overrun in Indian construction projects and mitigation measures. Int J Construct Educ Res. 15(3):216–238. doi:10.1080/15578771.2018.1499569.
  • Rachid Z, Toufik B, Mohammed B. 2019. Causes of schedule delays in construction projects in Algeria. Int J Construct Manage. 19(5):371–381. doi:10.1080/15623599.2018.1435234.
  • Rosenfeld Y. 2014. Root-cause analysis of construction-cost overruns. J Constr Eng Manage. 140(1):51–60. doi:10.1061/(ASCE)CO.1943-7862.0000789.
  • Ruqaishi M, Bashir HA. 2015. Causes of delay in construction projects in the oil and gas industry in the Gulf Cooperation Council countries: a case study [Article]. J Manage Eng. 31(3):8–5014017. doi:10.1061/.(asce)me.1943-5479.0000248.
  • Samarghandi H, Tabatabaei SMM, Taabayan P, Hashemi AM, Willoughby K. 2016. Studying the reasons for delay and cost overrun in construction projects: the case of Iran. JCDC. 21(1):51–84. doi:10.21315/jcdc2016.21.1.4.
  • Sambasivan M, Deepak TJ, Salim AN, Ponniah V. 2017. Analysis of delays in Tanzanian construction industry. ECAM. 24(2):308–325. doi:10.1108/ECAM-09-2015-0145.
  • Santoso DS, Soeng S. 2016. Analyzing delays of road construction projects in Cambodia: causes and effects. J Manage Eng. 32(6):5016020. doi:10.1061/(ASCE)ME.1943-5479.0000467.
  • Selcuk O, Turkoglu H, Polat G, Hajdu M. 2022. An integrative literature review on the causes of delays in construction projects: evidence from developing countries. Int J Construct Manag. 1–13. doi:10.1080/15623599.2022.2135939.
  • Shahsavand P, Marefat A, Parchamijalal M. 2018. Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. ECAM. 25(4):497–533. doi:10.1108/ECAM-10-2016-0220.
  • Shane JS, Molenaar KR, Anderson S, Schexnayder C. 2009. Construction project cost escalation factors. J Manage Eng. 25(4):221–229. doi:10.1061/(ASCE)0742-597X(2009)25:4(221).
  • Signor R, Love PED, Olatunji O, Vallim JJCB, Raupp AB. 2017. Collusive bidding in Brazilian infrastructure projects. Proc Inst Civil Eng. - Forensic Eng. 170(3):113–123. doi:10.1680/jfoen.17.00013.
  • Sinesilassie EG, Tabish SZS, Jha KN. 2018. Critical factors affecting cost performance: a case of Ethiopian public construction projects. Int J Construct Manag. 18(2):108–119. doi:10.1080/15623599.2016.1277058.
  • Singh S, Bala A, Dixit S, Varshney D. 2018. Critical analysis of causes of delay in residential construction projects in India. Int J Civil Eng Technol. 9(1):330–345.
  • Tricco AC, Lillie E, Zarin W, O'Brien KK, Colquhoun H, Levac D, Moher D, Peters MDJ, Horsley T, Weeks L, et al. 2018. PRISMA extension for scoping reviews (PRISMA-ScR): checklist and explanation. Ann Intern Med. 169(7):467–473. doi:10.7326/m18-0850.
  • Tufanaru C, Munn Z, E A, Campbell J, Hopp L. 2020. Chapter 3: systematic reviews of effectiveness. In JBI manual for evidence synthesis; p. 71–124. doi:10.46658/JBIMES-20-01.
  • United Nations. 2022. Least Developed Countries (LDCs) | Department of Economic and Social Affairs. https://www.un.org/development/desa/dpad/least-developed-country-category.html.
  • Vallejo-Borda JA, Gutierrez-Bucheli LA, Pellicer E, Ponz-Tienda JL. 2015. Behavior in terms of delays and cost overrun of the construction of public infrastructure in Colombia. Sibragec Elagec 2015, 66–73. doi:10.13140/RG.2.1.2496.5849.
  • Yap JBH, Skitmore M. 2018. Investigating design changes in Malaysian building projects. Archit Eng Des Manag. 14(3):218–238. doi:10.1080/17452007.2017.1384714.
  • Zhao Z-Y, Zuo J, Zillante G. 2017. Transformation of water resource management: a case study of the South-to-North Water Diversion project. J Cleaner Prod. 163:136–145. doi:10.1016/j.jclepro.2015.08.066.
  • Zidane YJT, Andersen B. 2018. The top 10 universal delay factors in construction projects [Article. IJMPB. 11(3):650–672. doi:10.1108/IJMPB-05-2017-0052.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.