1,982
Views
37
CrossRef citations to date
0
Altmetric
Research papers

Managing reservoir sediment release in dam removal projects: An approach informed by physical and numerical modelling of non‐cohesive sediment

, , , , , & show all
Pages 433-452 | Received 11 Sep 2008, Accepted 05 May 2009, Published online: 23 Aug 2010

References

  • American Rivers, Friends of the Earth, and Trout Unlimited . 1999 . Dam Removal Success Stories: Restoring Rivers Through Selective Removal of Dams That Don't Make Sense http://www.americanrivers.org/site/DocServer/SuccessStoriesReport.pdf?docID=221, accessed April 11, 2009.
  • ASCE (American Society Of Civil Engineers) . 1997 . Guidelines for Retirement of Dams and Hydroelectric Facilities, Task Committee on Guidelines for Retirement of Dams and Hydroelectric Facilities of the Hydropower Committee of the Energy Division of the American Society of Civil Engineers , NY : ASCE .
  • Aspen Institute, The. 2002 . “Dam removal: A new option for anew century,” . Queenstown, MD : The Aspen Institute .
  • Bayley , P.B. 1991 . “The flood pulse advantage and the restoration of river‐floodplain systems,” . Regulated Rivers: Research and Management , 6 : 75 – 86 .
  • Bednarek , A.T. 2001 . “Undamming rivers: A review of the ecological impacts of dam removal,” . Environmental Management , 27 : 803 – 814 .
  • Beschta , R.L. and Jackson , W.L. 1979 . “The intrusion of fine sediments into a stable gravel bed,” . Journal of the Fisheries Research Board of Canada , 36 : 204 – 210 .
  • Beck, R.W., Inc. 1998 . Condit Hydroelectric Project Removal: Summary Report ‐ Engineering Considerations Edited by: R.W. Beck, Inc. Portland, OR Prepared for PacifiCorp, Seattle, WA
  • Bountry , J. and Randle , T. 2001 . Hydraulic and Sediment Transport Analysis and Modelling, Savage Rapids Dam Sediment Evaluation Study, Technical Report, Appendix B, Department of Interior , Denver, CO : U.S. Bureau of Reclamation . http://www.usbr.gov/pn/programs/lcao_misc/pdf/savagerapds/Appendix%20B.pdf, accessed April 11, 2009
  • Brierley , G.J. and Fryirs , K.A. 2005 . Geomorphology and River Management: Applications of the River Styles Framework , 398 Oxford : Blackwell .
  • Bromley , J.C. and Thorne , C.R. “A scaled physical modelling investigation of the potential response of the lake mills delta to different magnitudes and rates of removal of glines canyon dam from the Elwha river, WA,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers . Reston, VA
  • Burdick , S.M. and Hightower , J.E. 2006 . “Distribution of spawning activity by anadromous fishes in an atlantic slope drainage after removal of a low‐head dam,” . Transactions of the American Fisheries Society , 135 : 1290 – 1300 .
  • Bushaw‐Newton , K.L. , Hart , D.D. , Pizzuto , J.E. , Thomson , J.R. , Egan , J. , Ashley , J.T. , Johnson , T.E. , Horwitz , R.J. , Keeley , M. , Lawrence , J. , Charles , D. , Gatenby , C. , Kreeger , D.A. , Nightengale , T. , Thomas , R.L. and Velinsky , D.J. 2002 . “An integrative approach towards understanding ecological responses to dam removal: The manatawny creek study,” . Journal of the American Water Resources Association , 38 : 1581 – 1599 .
  • Cantelli , A. , Paola , C. and Parker , G. 2004 . “Experiments on upstream‐migrating erosional narrowing and widening of an incisional channel caused by dam removal,” . Water Resources Research , 40 : W03304 doi: 10.1029/2003WR002940
  • Capelli , M.H. “San clemente and matilija dam removal: Alternative sediment management scenarios,” . Proceedings of the 27th U. S. Society on Dams Conference, Modernization and Optimization of Existing Dams and Reservoirs . March 5–9 2007 , Philadelphia, PA. pp. 607 – 620 .
  • Carling , P.A. 1984 . “Deposition of fine and coarse sand in an open‐work gravel bed,” . Canadian Journal of Fisheries and Aquatic Sciences , 41 : 263 – 270 .
  • Catalano , M.J. , Bozek , M.A. and Pellett , T.D. 2007 . “Effects of dam removal on fish assemblage structure and spatial distributions in the Baraboo river, Wisconsin,” . North American Journal of Fisheries Management , 27 : 519 – 530 .
  • Chang , H.H. “Fluvial modelling of ventura river responses to matilija dam removal,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers, Reston, VA . doi:10.1061/40763(178)31
  • Cheng , F. , Zika , U. , Banachowski , K. , Gillenwater , D. and Granata , T. 2006 . “Modelling the effects of dam removal on migratory walleye (Sander vitreus) early life‐history stages,” . River Research and Applications , 22 : 837 – 851 .
  • Childers , D. , Kresch , D.L. , Gustafson , S.A. , Randle , T.J. , Melena , J.T. and Cluer , B. 2000 . Hydrologic Data Collected During the 1994 Lake Mills Drawdown Experiment, Elwha River, Washington, Water‐Resources Investigations Report 99–4215 , Tacoma, Washington : U.S. Geological Survey .
  • Childs , J.R. , Snyder , N.P. and Hampton , M.A. 2003 . Bathymetric and Geophysical Surveys of Englebright Lake, Yuba‐Nevada Counties, California, Open File Report 03–383 , Washington, D.C. : U.S. Geological Survey .
  • Collier , M. , Webb , R.H. and Schmidt , J.C. 1996 . Dams and Rivers: Primer on the Downstream Effects of Dams , Washington, D.C. : U.S. Geological Survey . Circular No. 1126
  • Cooper , A.C. 1965 . The Effect of Transported Stream Sediments on the Survival of Sockeye and Pink Salmon Eggs and Alevin , Bulletin 18 New Westminster, BC : International Pacific Salmon Fisheries Commission .
  • Cui , Y. and Parker , G. 1998 . “The arrested gravel front: Stable gravel‐sand transitions in rivers. Part 2: General numerical solution,” . Journal of Hydraulic Research , 36 : 159 – 182 .
  • Cui , Y. and Parker , G. 2005 . “Numerical model of sediment pulses and sediment‐supply disturbances in mountain rivers” . Journal of Hydraulic Engineering , 131 : 646 – 656 .
  • Cui , Y. and Wilcox , A. 2008 . “Development and application of numerical models of sediment transport associated with dam removal,” . In Sedimentation Engineering: Processes, Measurements, Modeling, and Practice , ASCE Manuals and Reports on Engineering Practice No. 110 Edited by: Garcia , M.H. 995 – 1010 . Reston, VA : American Society of Civil Engineers .
  • Cui , Y. , Braudrick , C. and Rothert , S. “Preliminary assessment of sediment transport dynamics following dam removal: A case study,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers, Reston, VA . doi:10.1061/40763(178)25
  • Cui , Y. , Braudrick , C. , Dietrich , W.E. , Cluer , B. and Parker , G. 2006a . “Dam removal express assessment models (DREAM), Part 2: Sample runs/sensitivity tests,” . Journal of Hydraulic Research , 44 : 308 – 323 .
  • Cui , Y. , Parker , G. , Braudrick , C. , Dietrich , W.E. and Cluer , B. 2006b . “Dam removal express assessment models (DREAM), Part 1: Model development and validation,’ . Journal of Hydraulic Research , 44 : 291 – 307 .
  • Cui , Y. , Parker , G. , Lisle , T.E. , Gott , J. , Hansler‐Ball , M.E. , Pizzuto , J.E. , Allmendinger , N.E. and Reed , J.M. 2003a . “Sediment pulses in mountain rivers: 1. Experiments,” . Water Resources Research , 39 : 1239 doi: 10.1029/2002WR001803.
  • Cui , Y. , Parker , G. , Lisle , T.E. , Pizzuto , J.E. and Dodd , A.M. 2005a . “More on the evolution of bed material waves in alluvial rivers,” . Earth Surface Processes and Landforms , 30 : 107 – 114 .
  • Cui , Y. , Parker , G. , Pizzuto , J.E. and Lisle , T.E. 2003b . “Sediment pulses in mountain rivers: 2. Comparison between experiments and numerical predictions,” . Water Resources Research , 39 : 1240 doi: 10.1029/2002WR001805.
  • Cui , Y. , Wooster , J.K. , Venditti , J. , Dusterhoff , S.R. , Dietrich , W.E. and Sklar , L. 2008a . “Simulating sediment transport in a flume With forced pool‐riffle morphology: Examinations of two one‐dimensional numerical models,” . Journal of Hydraulic Engineering , 134 : 892 – 904 .
  • Cui , Y. , Wooster , J.K. , Baker , P.F. , Dusterhoff , S.R. , Sklar , L. and Dietrich , W.E. 2008b . “Theory of fine sediment infiltration into immobile gravel bed,” . Journal of Hydraulic Engineering , 134 : 1421 – 1429 .
  • Diplas , P. and Parker , G. 1985 . Pollution of Gravel Spawning Grounds due to Fine Sediment, Project Report 240, EPA/R‐808683–01–1 , Washington, D.C., MN : St. Anthony Falls Hydraulic Laboratory, University of Minnesota . Prepared for U. S. Environmental Protection Agency
  • Downs , P.W. and Kondolf , G.M. 2002 . “Post‐project appraisals in adaptive management of river channel restoration” . Environmental Management , 29 : 477 – 496 .
  • Downs , P.W. and Gregory , K.J. 2004 . River Channel Management: Towards Sustainable Catchment Hydrosystems , 395 London : Arnold .
  • Doyle , M.W. , Stanley , E.H. and Harbor , J.M. 2003 . “Channel adjustments following two dam removals in wisconsin,” . Water Resources Research , 39 : 1011 doi: 10.1029/2002WR001714
  • Doyle , M.W. , Stanley , E.H. , Luebke , M.A. and Harbor , J.M. “Dam removal: Physical, biological, and societal considerations,” . Water Resources 2000, Proceedings of the American Society of Civil Engineers Joint Conference on Water Resources Engineering and Water Resources Planning and Management . July 3‐Aug 2 , Minneapolis, MN. Edited by: Hotchkiss , R.H. and Glade , M. American Society of Civil Engineers, Reston, VA . doi: 10.1061/40517(2000)343.
  • Doyle , M.W. , Stanley , E.H. , Orr , C.H. , Selle , A.R. and Harbor , J.M. 2005 . “Stream ecosystem response to small dam removal: lessons from the Heartland,” . Geomorphology , 71 : 227 – 244 .
  • Dudley , R.W . 1999 . Riverbed‐Sediment Mapping in the Edwards Dam Impoundment on the Kennebec River, Maine By Use of Geophysical Techniques , Open File Report 99–200 Washington, D.C. : U.S. Geological Survey .
  • Evans , J.E. , Levine , N.S. , Roberts , S.J. , Gottgens , J.F. and Newman , D.M. 2002 . “Assessment using GIS and sediment routing of the proposed removal of Ballville Dam, Sandusky River, Ohio,” . Journal of the American Water Resources Association , 38 : 1549 – 1565 .
  • Evans , J.E. , Mackey , S.D. , Gottgens , J.F. and Gill , W.M. 2000 . “Lessons from a dam failure,” . Ohio Journal of Science , 100 : 121 – 131 .
  • Frostick , L.E. , Lucas , P.M. and Reid , I. 1984 . “The infiltration of fine matrices into coarse‐grained alluvial sediments and its implication for stratigraphical interpretation,” . Journal of the Geological Society London , 141 : 955 – 965 .
  • Fullerton , W.T. , Lantz , D.G. and Martz , M.S. “Trade‐offs between on‐site and watershed restoration goals in dam removal: Goldsborough creek dam removal project, Washington,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. Reston, VA : American Society of Civil Engineers . doi: 10.1061/40763(178)35.
  • Gathard , D. “Engineering analysis techniques for condit dam removal,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers . Reston VA doi:10.1061/40763(178)28.
  • Graber , B.E. , Bowman , M. , Carney , R.S. , Doyle , M.W. , Fisher , M. , Mackey , S.C. and Wildman , L. “Technical issues in small dam removal engineering,” . Proceedings of the 21st U. S. Society on Dams Annual Meeting and Lecture, The Future of Dams and Their Reservoirs . July 30‐August 3 2001 , Denver, CO. on CD‐ROM
  • Graf , W.L. 2001 . “Damage control: Restoring the physical integrity of America's rivers,” . Annals of the Association of American Geographers , 91 : 1 – 27 .
  • Grant , G. 2001 . “Dam removal: Panacea or pandora for rivers?,” . Hydrological Processes , 14 : 1531 – 1532 .
  • Greig , S.M. , Sear , D.A. and Carling , P.A. 2007 . “A review of factors influencing the availability of dissolved oxygen to incubating salmonid embryos,” . Hydrological Processes , 21 : 323 – 334 .
  • Greimann , B. , Randle , T. and Huang , J. 2006 . “The movement of finite amplitude sediment accumulations,” . Journal of Hydraulic Engineering , 132 : 731 – 736 .
  • Heinz Center, The. 2002 . Dam Removal: Science and Decision Making , Washington, D.C. : The H. John Heinz III Center for Science, Economics and the Environment .
  • Junk , W.J. , Bayley , P.B. and Sparks , R.E. “The flood pulse concept in river‐floodplain systems,” . Proceedings of the International Large River Symposium . Edited by: Dodge , D.P. pp. 110 – 127 . Canadian Special Publication of Fisheries and Aquatic Sciences, 106
  • Kanehl , P.D. , Lyons , J. and Nelson , J.E. 1997 . “Changes in the habitat and fish community of the Milwaukee river, Wisconsin, following removal of the Woolen Mills Dam,” . North American Journal of Fisheries Management , 17 : 387 – 400 .
  • Kocovsky , P.M. , Ross , R.M. and Dropkin , D.S. 2009 . “Prioritizing Removal of Dams for Passage of Diadromous Fishes on a Major River System,” . River Research and Applications , 25 : 107 – 117 .
  • Ligon , F.K. , Dietrich , W.E. and Trush , W.J. 1995 . “Downstream ecological effects of dams: A geomorphic perspective,” . Bio Science , 45 : 183 – 192 .
  • Lisle , T.E. , Pizzuto , J.E. , Ikeda , H. , Iseya , F. and Kodama , Y. 1997 . “Evolution of a sediment wave in an experimental channel,” . Water Resources Research , 33 : 1971 – 1981 .
  • Lisle , T.E. , Cui , Y. , Parker , G. , Pizzuto , J.E. and Dodd , A.M. 2001 . “The dominance of dispersion in the evolution of bed material waves in gravel‐bed rivers,” . Earth Surface Processes and Landforms , 26 : 1409 – 1420 .
  • Mcneil , W.J. 1964 . “Redd superimposition and egg capacity of pink salmon spawning beds,” . Journal of the Fisheries Research Board of Canada , 21 : 1385 – 1396 .
  • Major , J.J. , O'Conner , J.E. , Grant , G.E. , Spicer , K.R. , Bragg , H.M. , Rhode , A. , Tanner , D.Q. , Anderson , C.W. and Wallick , J.R. 2008 . “Initial fluvial response to the removal of Oregon's marmot dam,” . EOS, Transactions of the American Geophysical Union , 89 : 241 – 242 .
  • Mussetter , R.A. and Trabant , S.C. “Analysis of potential dam removal/retrofit impacts to habitat, flooding and channel stability in the Carmel Valley, California,” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers . Reston VA doi:10.1061/40763(178)34
  • NRC (National Research Council) . 1992 . Restoration of Aquatic Ecosystems: Science, Technology, and Public Policy , Washington, D.C. : National Academy Press .
  • Orr , C.H. , Kroiss , S.J. , Rogers , K.L. and Stanley , E.H. 2008 . “Downstream benthic responses to small dam removal in a coldwater stream,” . River Research and Applications , 24 : 804 – 822 .
  • Parker , G. 1991 a . “Selective sorting and abrasion of river gravel. I: Theory,” . Journal of Hydraulic Engineering , 117 : 131 – 149 .
  • Parker , G. 1991b . “Selective sorting and abrasion of river gravel. II: Application,” . Journal of Hydraulic Engineering , 117 : 159 – 171 .
  • Parker , G. and Cui , Y. 1998 . “The arrested gravel front: Stable gravel‐sand transitions in rivers, Part 1 : Simplified analytical solution,” . Journal of Hydraulic Research , 36 : 75 – 100 .
  • Petts , G.E. 1984 . Impounded Rivers: Perspectives for Ecological Management , Chichester : J. Wiley and Sons Ltd .
  • Petts , G.E. 1996 . “Sustaining The Ecological Integrity of Large Floodplain Rivers” . In Floodplain Processes , Edited by: Anderson , M.G. , Walling , D.E. and Bates , P.D. Chichester : J. Wiley and Sons Ltd .
  • Phillips , R.W. , Lantz , R.L. , Claire , E.W. and Moring , J.R. 1975 . “Some effects of gravel mixtures on emergence of coho salmon and steelhead trout fry,” . Transactions of the American Fisheries Society , 104 : 461 – 466 .
  • Pizzuto , J.E. 2002 . “Effects of dam removal on river form and process,” . Bio Science , 52 : 683 – 692 .
  • Platts , W.S. 1979 . “Relationships among stream order, fish populations, and aquatic geomorphology in an Idaho river drainage,” . Fisheries , 4 : 5 – 9 .
  • Poff , N.L. , Allan , J.D. , Bain , M.B. , Karr , J.R. , Prestegaard , K.I. , Richter , B.D. , Sparks , R.E. and Stromberg , J.C. 1997 . “The natural flow regime: A paradigm for river conservation and restoration,” . Bio Science , 47 : 769 – 84 .
  • Randle , T.J. 2003 . “Dam removal and sediment management,” . In Dam Removal Research: Status and Prospects, Proceedings of The Heinz Center's Dam Removal Research Workshop , Edited by: Graf , W.L. 81 – 104 . Washington, D.C. : The H. John Heinz III Center for Science, Economics and the Environment .
  • Rathbun , J. , Graber , B.E. , Pelto , K.I. , Turek , J. and Wildman , L. “A Sediment Quality Assessment and Management Framework For Dam Removal Projects” . Proceedings of the 2005 Watershed Management Conference . July 19–22 2005 , Williamsburg, VA. Managing Watersheds For Human and Natural Impacts: Engineering, Ecological, and Economic Challenges , Edited by: Moglen , G.E. American Society of Civil Engineers . Reston VA doi:10.1061/40763(178)19
  • Schälchli , U. 1992 . “The clogging of coarse gravel river beds by fine sediment,” . Hydrobiologia , 235 ( 236 ) : 189 – 197 .
  • Sear , D.A. 1994 . “River restoration and geomorphology,” . Aquatic Conservation: Marine and Freshwater Ecosystems , 4 : 169 – 177 .
  • Shuman , J.R. 1995 . “Environmental considerations for assessing dam removal alternatives for river restoration,” . Regulated Rivers: Research and Management , 11 : 249 – 261 .
  • Sklar , L.S. , Fadde , J. , Venditti , J.G. , Nelson , P. , Wydzga , M.A. , Cui , Y. and Dietrich , W.E. 2009 . “Translation and Dispersion of Sediment Pulses in Flume Experiments Simulating Gravel Augmentation below Dams.” . Water Resources Research , 45 : W08439 doi: 10.1029/2008 WR007346
  • Snyder , N.P. , Rubin , D.M. , Alpers , C.N. , Childs , J.R. , Curtis , J.A. , Flint , L.E. and Wright , S.A. 2004 . “Estimating accumulation rates and physical properties of sediment behind a dam: Englebright lake, Yuba river, Northern California” . Water Resources Research , 40 : W11301 doi: 10.1029/2004WR003279
  • Squier Associates . 2000 . Sandy River Sediment Study, Bull Run Hydroelectric Project , FERC Project No. 477 Lake Oswego, OR : Squier Associates . prepared for Portland General Electric, Portland, OR by
  • Stanley , E.H. , Catalano , M.J. , Mercado‐Silva , N. and Orr , C.H. 2007 . “Effects of DamRemoval onBrook Trout in a Wisconsin Stream,” . River Research and Applications , 23 : 792 – 798 .
  • Stillwater Sciences . 1999 . Preliminary Modelling of Sand/Silt Release from Soda Springs Reservoir in the Event of Dam Removal , Resource Team Information Request Report Berkeley, CA : North Umpqua Cooperative Watershed Analysis Resource Team by Stillwater Sciences . Prepared for the
  • Stillwater Sciences . 2000a . Numerical Modelling of Sediment Transport in the Sandy River, Oregon Following Removal of Marmot Dam. Technical Report, Supplement to the Bull Run Hydroelectric Project Environmental Assessment , FERC No. 477 Berkeley, CA : Portland General Electric Company, Portland, OR by Stillwater Sciences . Prepared for www.stillwatersci.com, accessed April 11, 2009
  • Stillwater Sciences . 2000b . Evaluation of Geomorphic Effects of Removal of Marmot and Little Sandy Dams and Potential Impacts on Anadromous Salmonids, Preliminary Final Technical Report , Berkeley, CA : Portland General Electric Company, Portland, OR by Stillwater Sciences . Prepared for www.stillwatersci.com, accessed April 11, 2009
  • Stillwater Sciences . 2001 . Comparison of Predicted and Observed Geomorphic Changes Following the Removal of Saeltzer Dam, Task 6 Deliverable Report , Berkeley, CA : University of California, Davis, CA by Stillwater Sciences . Prepared for
  • Stillwater Sciences . 2002 . Sediment Transport Modelling Following the Removal of Marmot Dam with 125,000 and 300,000 Cubic Yards of Dredging Prior to Dam Removal, Technical Memorandum , Berkeley, CA : Portland General Electric, Portland, OR by Stillwater Sciences . Prepared for
  • Stillwater Sciences . 2004 . A Preliminary Evaluation of the Potential Downstream Sediment Deposition Following the Removal of Iron Gate, Copco, and J. C. Boyle Dams, Klamath River, CA, Final Report , Berkeley, CA : American Rivers, American Trout, Friends of the River, and Trout Unlimited by Stillwater Sciences . Prepared for
  • Stillwater Sciences . 2008 . Klamath River Dam Removal Study: Sediment Transport DREAM‐1 Simulation, Technical Report , Berkeley, CA : California Coastal Conservancy, Oakland, CA by Stillwater Sciences . Prepared for www.stillwatersci.com, accessed April 11, 2009
  • Stillwater Sciences . 2009 . Post‐dam‐removal Channel Complexity Monitoring Survey Data Analysis, Sandy River, Oregon, 1st year following dam removal , Berkeley : Portland General Electric, Portland, OR by Stillwater Sciences . Technical Memorandum, Prepared for
  • Sutherland , D.G. , Hansler Ball , M. , Hilton , S J. and Lisle , T.E. 2002 . “Evolution of a landslide‐induced sediment wave in the Navarro river, California,” . Geological Society of America Bulletin , 114 : 1036 – 1048 .
  • Suttle , K.B. , Power , M.E. , Levine , J.M. and McNeely , C. 2004 . “How fine sediment on riverbeds impairs growth and survival of juvenile salmonids,” . Ecological Applications , 14 : 969 – 974 .
  • U.S. Bureau of Reclamation . 1996a . Removal of Elwha and Glines Canyon Dams. Elwha Technical Series PN‐95–7 , Boise, ID : Elwha River Ecosystem and Fisheries Restoration Project, Washington by USBR, Pacific Northwest Region . Prepared for
  • U.S. Bureau of Reclamation . 1996b . Sediment Analysis and Modelling of the River Erosion Alternative , Elwha Technical Series PN‐95–9 Boise, ID : Elwha River Ecosystem and Fisheries Restoration Project, Washington by USBR, Pacific Northwest Region . Prepared for
  • Williams , G.P. and Wolman , M.G. 1984 . Downstream Effects of Dams on Alluvial Rivers , Professional Paper 1286 Washington, D.C. : U.S. Geological Survey .
  • Wooster , J.K. 2002 . “ Geomorphic Responses Following Dam Removal: A Flume Study ” . Davis : University of California . Unpublished M.S. Thesis
  • Wooster , J.K. , Venditti , J.G. , Minear , J.T. , Cui , Y. , Dusterhoff , S.R. , Humphries , R. , Nelson , P. , Dietrich , W.E. and Sklar , L. 2006 . “Investigations of sediment pulse morphodynamics in a flume with fixed bars,” . EOS, Transactions of the American Geophysical Union , 87 (52) Fall Meet. Suppl., Abstract H51G‐0584.
  • Wooster , J.K. , Dusterhoff , S.R. , Cui , Y. , Dietrich , W.E. , Sklar , L. and Malko , M. 2008 . “Sediment supply and relative size distribution effects on fine sediment infiltration into immobile deposits,” . Water Resources Research , 44 : W03424 doi: 10.1029/2006WR005815
  • Yatsu , E. 1955 . “On the longitudinal profile of the graded river,’ . EOS, Transactions of the American Geophysical Union , 36 : 655 – 663 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.