184
Views
6
CrossRef citations to date
0
Altmetric
Research Articles

Triple top line-based identification of sustainable water distribution system conservation targets and pipe replacement timing

ORCID Icon &
Pages 642-652 | Received 14 Jun 2019, Accepted 03 Jan 2020, Published online: 17 Jan 2020

References

  • Alvisi, S., and M. Franchini. 2006. “Near-optimal Rehabilitation Scheduling of Water Distribution Systems Based on a Multi-objective Genetic Algorithm.” Civil Engineering and Environmental Systems 23 (3): 143–160. doi:10.1080/10286600600789300.
  • Al-Zahrani, M., A. Abo-Monasar, and R. Sadiq. 2016. “Risk-based Prioritization of Water Main Failure Using Fuzzy Synthetic Evaluation Technique.” Journal of Water Supply: Research and Technology-AQUA 65 (2): 145–161.
  • Annus, I., and A. Vassiljev. 2015. “Different Approaches for Calibration of an Operational Water Distribution System Containing Old Pipes.” Procedia Engineering 119: 526–534. doi:10.1016/j.proeng.2015.08.900.
  • ASCE (American Society of Civil Engineers). 2013. 2013 Report Card for America’s Infrastructure. Reston, VA: American Society of Civil Engineers.
  • ASCE (American Society of Civil Engineers). 2017. 2017 Report Card for America’s Infrastructure. Reston, VA: American Society of Civil Engineers.
  • Așchilean, I., and I. Giurca. 2018. “Choosing a Water Distribution Pipe Rehabilitation Solution Using the Analytical Network Process Method.” Water 10 (4): 484. doi:10.3390/w10040484.
  • AWWA (American Water Works Association). 2012. Buried no Longer: Confronting America’s Water Infrastructure Challenge. Denver, CO: AWWA.
  • AWWA (American Water Works Association). 2018. AWWA Asset Management Definitions Guidebook. Denver, CO: AWWA.
  • Aydin, N. Y., D. Zeckzer, H. Hagen, and T. Schmitt. 2015. “A Decision Support System for the Technical Sustainability Assessment of Water Distribution Systems.” Environmental Modelling & Software 67: 31–42. doi:10.1016/j.envsoft.2015.01.006.
  • Baird, G. M. 2010. “A Game Plan for Aging Water Infrastructure.” Journal‐American Water Works Association 102 (4): 74–82. doi:10.1002/j.1551-8833.2010.tb10092.x.
  • Basupi, I., and Z. Kapelan. 2013. “Flexible Water Distribution System Design under Future Demand Uncertainty.” Journal of Water Resources Planning and Management 141 (4): 04014067. doi:10.1061/(ASCE)WR.1943-5452.0000416.
  • Boulos, P. F. 2017. “Optimal Scheduling of Pipe Replacement.” Journal-American Water Works Association 109 (1): 42–46. doi:10.5942/jawwa.2017.109.0002.
  • Christodoulou, S., A. Deligianni, P. Aslani, and A. Agathokleous. 2009. “Risk-based Asset Management of Water Piping Networks Using Neurofuzzy Systems.” Computers, Environment and Urban Systems 33 (2): 138–149. doi:10.1016/j.compenvurbsys.2008.12.001.
  • Clark, R. M., M. Sivaganesan, A. Selvakumar, and V. Sethi. 2002. “Cost Models for Water Supply Distribution Systems.” Journal of Water Resources Planning and Management 128 (5): 312–321. doi:10.1061/(ASCE)0733-9496(2002)128:5(312).
  • D’Ercole, M., M. Righetti, G. Raspati, P. Bertola, and R. Maria Ugarelli. 2018. “Rehabilitation Planning of Water Distribution Network through a Reliability-Based Risk Assessment.” Water 10 (3): 277. doi:10.3390/w10030277.
  • Deb, A. K., F. M. Grablutz, Y. J. Hasit, J. K. Snyder, G. V. Loganathan, and N. Agbenowsi. 2002. Prioritizing Water Main Rehabilitation and Replacement. Denver, Colo: American Water Works Association Research Foundation.
  • Echávez, G. 1997. “Increase in Losses Coefficient with Age for Small Diameter Pipes.” Journal of Hydraulic Engineering 123 (2): 157–159. doi:10.1061/(ASCE)0733-9429(1997)123:2(157).
  • Eckelman, M. J., M. Altonji, A. Clark, M. Jenkins, and B. Lakin. 2014. “Environmental and Economic Life-cycle Assessment of Municipal Water-storage Options: Infrastructure Refurbishment versus Replacement.” Journal of Infrastructure Systems 20 (3). doi:10.1061/(ASCE)IS.1943-555X.0000191.
  • Fahmy, M., and O. Moselhi. 2009. “Forecasting the Remaining Useful Life of Cast Iron Water Mains.” Journal of Performance of Constructed Facilities 23 (4): 269–275. doi:10.1061/(ASCE)0887-3828(2009)23:4(269).
  • Farahmandfar, Z., and K. R. Piratla. 2017. “Resilience-based Water Main Rehabilitation Planning in a Multi-hazard Context.” Journal of Water Supply: Research and Technology-AQUA 66 (8): 651–664. doi:10.2166/aqua.2017.066.
  • Filion, Y. R., H. L. MacLean, and B. W. Karney. 2004. “Life-cycle Energy Analysis of a Water Distribution System.” Journal of Infrastructure Systems 10 (3): 120–130. doi:10.1061/(ASCE)1076-0342(2004)10:3(119).
  • Folkman, S. 2012. Water Main Break Rates in the USA and Canada: A Comprehensive Study. Paper 171, Utah State University. 28. https://digitalcommons.usu.edu/mae_facpub/171/.
  • Geem, Z. W., J. H. Kim, and G. V. Loganathan. 2001. “A New Heuristic Optimization Algorithm: Harmony Search.” Simulation 76 (2): 60–68. doi:10.1177/003754970107600201.
  • Giustolisi, O., and L. Berardi. 2009. “Prioritizing Pipe Replacement: From Multiobjective Genetic Algorithms to Operational Decision Support.” Journal of Water Resources Planning and Management 135 (6): 484–492. doi:10.1061/(ASCE)0733-9496(2009)135:6(484).
  • Grigg, N. S. 2005. “Assessment and Renewal of Water Distribution Systems.” Journal‐American Water Works Association 97 (2): 58–68. doi:10.1002/j.1551-8833.2005.tb10825.x.
  • Grigg, N. S. 2006. “Condition Assessment of Water Distribution Pipes.” Journal of Infrastructure Systems 12 (3): 147–153. doi:10.1061/(ASCE)1076-0342(2006)12:3(147).
  • Hudson, W. D. 1966. “Studies of Distribution System Capacity in Seven Cities.” Journal‐American Water Works Association 58 (2): 157–164. doi:10.1002/j.1551-8833.1966.tb01568.x.
  • Jayaram, N., and K. Srinivasan. 2008. “Performance‐based Optimal Design and Rehabilitation of Water Distribution Networks Using Life Cycle Costing.” Water Resources Research 44: 1. doi:10.1029/2006WR005316.
  • Jones, M., W. Williams, and J. Stillman. 2014. “The Evolution of Asset Management in the Water Industry.” Journal American Water Works Association (AWWA) 106 (8): 140–148. doi:10.5942/jawwa.2014.106.0114.
  • Judi, D. R., and T. N. McPherson. 2015. “Development of Extended Period Pressure-Dependent Demand Water Distribution Models.” In Los Alamos National Lab. (LANL). Los Alamos, NM, USA. doi:10.2172/1209272.
  • Kang, D., and K. Lansey. 2011. “Dual Water Distribution Network Design under Triple-bottom-line Objectives.” Journal of Water Resources Planning and Management 138 (2): 162–175. doi:10.1061/(ASCE)WR.1943-5452.0000161.
  • Kapelan, Z., D. A. Savic, G. A. Walters, and A. V. Babayan. 2006. “Risk-and Robustness-based Solutions to a Multi-objective Water Distribution System Rehabilitation Problem under Uncertainty.” Water Science and Technology 53 (1): 61–75. doi:10.2166/wst.2006.008.
  • Kim, J. H., and L. W. Mays. 1994. “Optimal Rehabilitation Model for Water-distribution Systems.” Journal of Water Resources Planning and Management 120 (5): 674–692. doi:10.1061/(ASCE)0733-9496(1994)120:5(674).
  • Lamont, P. A. 1981. “Common Pipe Flow Formulas Compared with the Theory of Roughness.” Journal‐American Water Works Association 73 (5): 274–280. doi:10.1002/j.1551-8833.1981.tb04704.x.
  • Lansey, K. 2012. “Sustainable, Robust, Resilient, Water Distribution Systems.” Paper Presented at the WDSA 2012: 14th Water Distribution Systems Analysis Conference, Adelaide, South Australia, September 24– 27.
  • Lee, S., D. G. Yoo, D. Jung, and J. H. Kim. 2018. “Application of Life Cycle Energy Analysis for Designing a Water Distribution Network.” The International Journal of Life Cycle Assessment 23 (6): 1174–1191.
  • Lee, S., S. Shin, D. Judi, T. McPherson, and S. Burian. 2017. “Water Distribution System Recovery Strategies considering Economic Consequences from Business Loss.” In Proceedings of the CCWI2017. Sheffield, UK: Figshare.
  • Lee, S., S. Shin, D. R. Judi, T. McPherson, and S. J. Burian. 2019. “Criticality Analysis of a Water Distribution System considering Both Economic Consequences and Hydraulic Loss Using Modern Portfolio Theory.” Water 11 (6): 1222. doi:10.3390/w11061222.
  • Lee, S., and S. J. Burian. Under review. “Triple Top Line Based Sustainability Measure for Water Distribution Systems.” Journal of Infrastructure Systems.
  • Loucks, D. P. 1997. “Quantifying Trends in System Sustainability.” Hydrological Sciences Journal 42 (4): 513–530. doi:10.1080/02626669709492051.
  • Ostfeld, A. 2005. “Optimal Design and Operation of Multiquality Networks under Unsteady Conditions.” Journal of Water Resources Planning and Management 131 (2): 116–124. doi:10.1061/(ASCE)0733-9496(2005)131:2(116).
  • Phan, H. C., A. S. Dhar, and R. Sadiq. 2018. “Prioritizing Water Mains for Inspection and Maintenance considering System Reliability and Risk.” Journal of Pipeline Systems Engineering and Practice 9 (3): 04018009. doi:10.1061/(ASCE)PS.1949-1204.0000324.
  • Prosser, M. E. E., V. L. Speight, and Y. R. Filion. 2013. “Life-cycle Energy Analysis of Performance-versus Age-based Pipe Replacement Schedules (PDF).” Journal of American Water Works Association 105 (12): E721–E32. doi:10.5942/jawwa.2013.105.0157.
  • Rahmani, F., A. Ardeshir, K. Behzadian, and F. Jalilsani. 2014. “Optimal Rehabilitation Strategy in Water Distribution Systems considering Reduction in Greenhouse Gas Emissions.”In Proc., HIC2014–11th Int. Conf. on Hydroinformatics. New York, NY: CUNY Academic Works
  • Richter, B. D., M. E. Blount, C. Bottorff, H. E. Brooks, A. Demmerle, B. L. Gardner, H. Herrmann, M. Kremer, T. J. Kuehn, and E. Kulow. 2018. “Assessing the Sustainability of Urban Water Supply Systems.” Journal-American Water Works Association 110 (2): 40–47. doi:10.1002/awwa.1002.
  • Rogers, P. D., and N. S. Grigg. 2009. “Failure Assessment Modeling to Prioritize Water Pipe Renewal: Two Case Studies.” Journal of Infrastructure Systems 15 (3): 162–171. doi:10.1061/(ASCE)1076-0342(2009)15:3(162).
  • Scholten, L., A. Scheidegger, P. Reichert, M. Mauer, and J. Lienert. 2014. “Strategic Rehabilitation Planning of Piped Water Networks Using Multi-criteria Decision Analysis.” Water Research 49: 124–143. doi:10.1016/j.watres.2013.11.017.
  • Seifollahi-Aghmiuni, S., O. B. Haddad, M. H. Omid, and M. A. Mariño. 2013. “Effects of Pipe Roughness Uncertainty on Water Distribution Network Performance during Its Operational Period.” Water Resources Management 27 (5): 1581–1599. doi:10.1007/s11269-013-0259-6.
  • Shafiqul Islam, M., R. Sadiq, M. J. Rodriguez, H. Najjaran, and M. Hoorfar. 2013. “Reliability Assessment for Water Supply Systems under Uncertainties.” Journal of Water Resources Planning and Management 140 (4): 468–479. doi:10.1061/(ASCE)WR.1943-5452.0000349.
  • Shamir, U., and C. Howard. 1979. “An Analytical Approach to Scheduling Pipe Replacement.” Journal of American Water Works Association 71 (5): 248–258. doi:10.1002/j.1551-8833.1979.tb04345.x.
  • Shanaghan, P. E. 2012. “Assessing Drinking Water Infrastructure Need.” Journal‐American Water Works Association 104 (8): 14–15. doi:10.5942/jawwa.2012.104.0107.
  • Sharp, B., B. Edwards, A. Dean, D. Davis, and G. Bancroft. 1998. “A Knowledge Base Environment to Support Water Mains Rehabilitation Decision Making.” Paper Presented at the ERA Technology Conference, London.
  • Sharp, W. W., and T. M. Walski. 1988. “Predicting Internal Roughness in Water Mains.” Journal of American Water Works Association 80: 34–40. doi:10.1002/j.1551-8833.1988.tb03132.x.
  • Shin, S., S. Lee, D. R. Judi, M. Parvania, E. Goharian, T. McPherson, and S. J. Burian. 2018. “A Systematic Review of Quantitative Resilience Measures for Water Infrastructure Systems.” Water 10 (2): 164. doi:10.3390/w10020164.
  • Tlili, Y., and A. Nafi. 2012. “A Practical Decision Scheme for the Prioritization of Water Pipe Replacement.” Water Science and Technology: Water Supply 12 (6): 895–917.
  • Webb, D., and B. M. Ayyub. 2016. “Sustainability Quantification and Valuation. I: Definitions, Metrics, and Valuations for Decision Making.” ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering 3 (3): E4016001.
  • Wilson, L. L., F. Moshavegh, J. Frey, L. Kolokas, and A. R. Simpson. 2003. “Cost Savings and Enhanced Reliability for Main Rehabilitation and Replacement.” Journal‐American Water Works Association 95 (8): 54–64. doi:10.1002/j.1551-8833.2003.tb10429.x.
  • Zamenian, H., F. L. Mannering, D. M. Abraham, and T. Iseley. 2016. “Modeling the Frequency of Water Main Breaks in Water Distribution Systems: Random-Parameters Negative-Binomial Approach.” Journal of Infrastructure Systems 23 (2): 04016035. doi:10.1061/(ASCE)IS.1943-555X.0000336.
  • Zangenehmadar, Z., and O. Moselhi. 2016. “Assessment of Remaining Useful Life of Pipelines Using Different Artificial Neural Networks Models.” Journal of Performance of Constructed Facilities 30 (5): 04016032. doi:10.1061/(ASCE)CF.1943-5509.0000886.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.