References
- Abrishamchi, A., Ebrahimian, A., Tajrishi, M., & Mariño, M. (2005). Case study: Application of multicriteria decision making to urban water supply. Journal of Water Resources Planning and Management, 131, 326–335. doi:10.1061/(ASCE)0733-9496(2005)131:4(326).
- Aguado, A., del Caño, A., de la Cruz, M.P., Gómez, D., & Josa, A. (2012). Sustainability assessment of concrete structures within the Spanish structural concrete code. Journal of Construction Engineering and Management, 138, 268–276. doi:10.1061/(ASCE)CO.1943-7862.0000419.
- Alarcon, B., Aguado, A., Manga, R., & Josa, A. (2010). A value function for assessing sustainability: Application to industrial buildings. Sustainability, 3, 35–50. doi:10.3390/su3010035.
- Alonso, M., & Zaragoza, G. (2001). Normativa sobre seguridad de Presas [Dam safety regulations]. Especial XX Congreso de Grandes Presas. Revista de Obras Públicas, 3407, pp. 75-83.
- Altarejos-García, L., Escuder-Bueno, I., Serrano-Lombillo, A., & Gómez de Membrillera-Ortuño, M. (2012). Methodology for estimating the probability of failure by sliding in concrete gravity dams in the context of risk analysis. Structural Safety, 36–37, 1–13. https://doi.org/doi:10.1016/j.strusafe.2012.01.001.
- Arboleda, J. (1994). Una propuesta para la identificación y evaluación de impactos ambientales [A proposal for the identification and evaluation of environmental impacts]. Crónica Forestal y del Medio Ambiente, n° 9, 71–81.
- Ariaratnam, S., Piratla, K., Cohen, A., & Olson, M. (2013). Quantification of sustainability index for underground utility infrastructure projects. Journal Construction Engineering and Management. doi:10.1061/(ASCE)CO.1943-7862.0000763.
- Bowles, D. (2001). Evaluation and use of risk estimates in dam safety decision making. Risk-based decision making in water resources IX, 17–32. https://doi.org/doi:10.1061/40577(306)3.
- Comisión Permanente del Hormigón (2008). Instrucción de hormigón estructural EHE-08 [Concrete structural instruction – EHE-08]. Ministerio de Fomento, España, 722 pp.
- Conesa, F.J. (2010). Procedimiento para la evaluación del estado de seguridad en presas y priorización de actuaciones [Procedure for assessment of the security status in dams and prioritizing actions] (Master's Thesis). Barcelona Tech, Barcelona, Spain.
- Cyganiewicz, J., & Smart, J. (2000). U.S. Bureau of Reclamation's use of risk analysis and risk assessment in dam safety decision making. XX international congress of large dams (ICOLD), Q-76, the use of risk analysis to support dam safety decisions and management. Beijing. 19 pp.
- Dirección General de Obras Hidráulicas (1996). Dirección General de Obras Hidráulicas Reglamento técnico sobre seguridad de presas y embalses: Serie Legislación [Technical regulation on safety of dams and reservoirs: Legislation series]. Ministerio de Obras Públicas, Transportes y Medio Ambiente del Gobierno de España, Madrid. 32 pp.
- Dirección General de Obras Hidráulicas (1997). Clasificación de Presas en Función del Riesgo Potencial: Guía Técnica [Classification of dams based on potential risk: Technical guide]. Ministerio de Medio Ambiente del Gobierno de España, Madrid, Spain, 64 pp.
- Gómez, D. (1988). Evaluación del impacto ambiental de proyectos agrarios [Environmental impact assessment of agricultural projects]. Ministerio de Agricultura Pesca y Alimentación. Estudios monográficos n° 6, Madrid, Spain.
- Hennig, C., Dise, K., & Muller, B. (1997). Achieving public protection with dam safety risk assessment practices. Proceedings of the 8th conference on risk-based decision making in water resources VIII, pp. 19-32.
- Huang, I.B., Keisler, J., & Linkov, I. (2011). Multi-criteria decision analysis in environmental sciences: Ten years of applications and trends. Science of the Total Environment, 409, 3578–3594. doi:10.1016/j.scitotenv.2011.06.022.
- International Commission on Large Dams (2005). Risk assessment in dam safety management: A reconnaissance of benefits, methods and current applications. ICOLD Bulletin, 276 pp 130.
- International Commission on Large Dams (2011). The world register of dams. Electronic register – 2nd update of 4th edition, ICOLD.
- Kabir, G., Sadiq, R., & Tesfamariam, S. (2013). A review of multi-criteria decision-making methods for infrastructure management. Structure and Infrastructure Engineering. doi:10.1080/15732479.2013.795978.
- Keeney, R.L., & Raiffa, H. (1993). Decisions with multiple objectives: Preferences and value tradeoffs. Cambridge: Cambridge University Press.
- Khadem, N., & Sheikholeslami, A. (2010). Multicriteria group decision-making technique for a low-class road maintenance program. Journal of Infrastructure Systems, 16, 188–198. doi:10.1061/(ASCE)IS.1943-555X.0000023.
- Koo, D., & Ariaratnam, S. (2008). Application of a sustainability model for assessing water main replacement options. Journal Construction Engineering and Management, 134, 563–574.
- Lambert, J., Karvetski, C., Spencer, D., Sotirin, B., Liberi, D., Zaghloul, H., … & Linkov, I. (2012). Prioritizing infrastructure investments in Afghanistan with multiagency stakeholders and deep uncertainty of emergent conditions. Journal of Infrastructure Systems, 18, 155–166. doi:10.1061/(ASCE)IS.1943-555X.0000078.
- Mejia-Giraldo, D., Villarreal, J., Gu, Y., He, Y., Duan, Z., & Wang, L. (2012). Sustainability and resiliency measures for long-term investment planning in integrated energy and transportation infrastructures. Journal Energy Engineering, 138, 87–94. doi:10.1061/(ASCE)EY.1943-7897.0000067.
- Nystrm, B., & Sderholm, P. (2010). Selection of maintenance actions using the analytic hierarchy process (AHP): Decision-making in railway infrastructure. Structure and Infrastructure Engineering, 6, 467–479. doi:10.1080/15732470801990209.
- Pardo-Bosch, F (2014). Gestión integral de obras hidráulicas de hormigón: del diagnóstico a la inversión [Comprehensive management of concrete hydraulic infrastructures: from diagnosis to investment] (Doctoral Thesis). Escuela Técnica Superior de Ingenieros de Canales, Caminos y Puertos, Universitat Politècnica de Catalunya, Barcelona.
- Pons, O., & Aguado, A. (2012). Integrated value model for sustainable assessment applied to technologies used to build schools in Catalonia, Spain. Building and Environment, 53, 49–58. doi:10.1016/j.buildenv.2012.01.007.
- Pons, O., & Fuente, A. (2013). Integrated sustainability assessment method applied to structural concrete columns. Construction & Building Materials, 49, 882–893. doi:10.1016/j.conbuildmat.2013.09.009.
- Saaty, T.L. (1980). The analytic hierarchy process. New York, NY: McGraw-Hill.
- Sadiq, R., & Tesfamariam, S. (2009). Environmental decision-making under uncertainty using intuitionistic fuzzy analytic hierarchy process (IF-AHP). Stochastic Environmental Research and Risk Assessment, 23, 75–91. https://doi.org/doi10.1007/s00477-007-0197-z.
- San José, J.T., & Garrucho, I. (2010). A system approach to the environmental analysis of industrial buildings. Building & Environment, 45, 673–683. doi:10.1016/j.buildenv.2009.08.012.
- Scott, G. (2011). The practical application of risk assessment to dam safety. Geo-Risk, 129–168. doi:10.1061/41183(418)6.
- Shang, J., Tjader, Y., & Ding, Y. (2004). A unified framework for multicriteria evaluation of transportation projects. IEEE Transactions on Engineering Management, 51, 300–313. doi:10.1109/TEM.2004.830848.
- Shen, L., Wu, Y., & Zhang, X. (2011). Key assessment indicators for the sustainability of infrastructure projects. Journal Construction Engineering and Management, 137, 441–451. doi:10.1061/(ASCE)CO.1943-7862.0000315.
- SPANCOLD (2013). Risk analysis applied to management of dam safety. Technical guides on dam safety: Technical guide on operation of dams and reservoirs. Madrid, Spain, 50 pp.
- Tesfamariam, S., & Sadiq, R. (2006). Risk-based environmental decision-making using fuzzy analytic hierarchy process (F-AHP). Stochastic Environmental Research & Risk Assessment, 21, 35–50. doi:10.1007/s00477-006-0042-9.
- USACE (1979). Recommended guidelines for the safety inspection of dams. Office of the Chief of Engineers, U.S., Corps of Engineers, Washington DC. 33 pp.
- USBR (1988). Downstream hazard classification guidelines: ACER technical memorandum. Bureau of Reclamation, Denver, n° 11, 56 pp.
- USBR, USACE (2012). Qualitative and semi-quantitative assessments. Best practices in dam and levee safety risk analysis. (pp. 3-1 − 3-16) Washington, DC: U.S. Department of the Interior.
- Valenzuela, S., de Solminihac, H., & Echaveguren, T. (2010). Proposal of an integrated index for prioritization of bridge maintenance. Journal of Bridge Engineering, 15, 337–343. doi:10.1061/_ASCE_BE.1943-5592.0000068.
- Williams, M. (2009). Introducción a la Gestión de proyectos [The principles of project management]. Anaya, Madrid, Spain, 224 pp.
- Ziara, M., Nigim, K., Enshassi, A., & Ayyub, B. (2002). Strategic implementation of infrastructure priority projects: Case study in Palestine. Journal of Infrastructure Systems, 8, 2–11. doi:10.1061/(ASCE)1076-0342(2002)8:1(2).