Publication Cover
Structure and Infrastructure Engineering
Maintenance, Management, Life-Cycle Design and Performance
Volume 12, 2016 - Issue 10
553
Views
23
CrossRef citations to date
0
Altmetric
Articles

Auto-generated site layout: an integrated approach to real-time sensing of temporary facilities in infrastructure projectsFootnote*

, , , &
Pages 1243-1255 | Received 01 Jan 2015, Accepted 16 Oct 2015, Published online: 14 Dec 2015

References

  • Ahuja, R.K., Orlin, J.B., & Tiwari, A. (2000). A greedy genetic algorithm for the quadratic assignment problem. Computers & Operations Research, 27, 917–934.
  • Akanmu, A. (2011). A cyber-physical systems approach to construction. ( PhD dissertation). Penn State University, University Park, PA.
  • Akanmu, A., Anumba, C., & Messner, J. (2014). Critical review of approaches to integrating virtual models and the physical construction. International Journal of Construction Management, 14, 267–282.10.1080/15623599.2014.972021
  • Behzadan, A.H., Aziz, Z., Anumba, C.J., & Kamat, V.R. (2008). Ubiquitous location tracking for context-specific information delivery on construction sites. Automation in Construction, 17, 737–748.10.1016/j.autcon.2008.02.002
  • Buffa, E.S., Armour, G.C., & Vollman, T.E. (1964). Allocating facilities with CRAFT. Harvard Business Review, 42, 136–157.
  • van Camp, D.J., Carter, M.W., & Vannelli, A. (1992). A nonlinear optimization approach for solving facility layout problems. European Journal of Operational Research, 57, 174–189. doi:10.1016/0377-2217(92)90041-7
  • Cheng, J.C.P., & Kumar, S.S. (2014). A BIM based construction site layout planning framework considering actual travel paths. In 31st International Symposium on Automation and Robotics in Construction and Mining, ISARC 2014-Proceedings (p. 450). Sydney, Australia.
  • Cheng, M., & O’Connor, J. (1996). ArcSite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122, 329–336.10.1061/(ASCE)0733-9364(1996)122:4(329)
  • Chwif, L., Barretto, M.R.P., & Moscato, L.A. (1998). A solution to the facility layout problem using simulated annealing. Computers in Industry, 36, 125–132.10.1016/S0166-3615(97)00106-1
  • El-Rayes, K., & Said, H. (2009). Dynamic site layout planning using approximate dynamic programming. Journal of Computing in Civil Engineering, 23, 119–127.10.1061/(ASCE)0887-3801(2009)23:2(119)
  • Goetschalckx, M. (1992). An interactive layout heuristic based on hexagonal adjacency graphs. European Journal of Operational Research, 63, 304–321.10.1016/0377-2217(92)90033-6
  • Grau, D., Caldas, C.H., Haas, C.T., Goodrum, P.M., & Gong, J. (2009). Assessing the impact of materials tracking technologies on construction craft productivity. Automation in Construction, 18, 903–911.10.1016/j.autcon.2009.04.001
  • Guillemette, M.G., Fontaine, I., and Caron, C. (2008). Hybrid RFID-GPS real-time location system for human resources: Development, impacts and perspectives. In Hawaii International Conference on System Sciences, Proceedings of the 41st Annual (pp. 406–406). Waikoloa, HI: IEEE.
  • Ji, S.-H., Park, M., Lee, H.-S., Ahn, J., Kim, N., & Son, B. (2011). Military facility cost estimation system using case-based reasoning in Korea. Journal of Computing in Civil Engineering, 25, 218–231.10.1061/(ASCE)CP.1943-5487.0000082
  • Lam, K.C., Ning, X., & Ng, T. (2007). The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25, 359–374.10.1080/01446190600972870
  • Lee, H., Lee, K., Park, M., Baek, Y., & Lee, S. (2012). RFID-based real-time locating system for construction safety management. Journal of Computing in Civil Engineering, 26, 366–377.10.1061/(ASCE)CP.1943-5487.0000144
  • Lee, R.C., & Moore, J.M. (1967). CORELAP-Computerized relationship layout planning. Industrial Engineering, 18, 56–61.
  • Leung, A.W.T., & Tam, C.M. (2010). Assessing the impacts of spatial profile on site production using clustering techniques. In W. Tizani (Ed.), The International Conference on Computing in Civil and Building Engineering. Nottingham University Press. http://www.engineering.nottingham.ac.uk/icccbe/proceedings/pdf/pf133.pdf
  • Li, H., & Love, P.E.D. (2000). Genetic search for solving construction site-level unequal-area facility layout problems. Automation in Construction, 9, 217–226.10.1016/S0926-5805(99)00006-0
  • Mawdesley, M.J., Askew, W.H., & Al-Jibouri, S.H. (2004). Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11, 83–89.10.1108/09699980410527885
  • Mühlenbein, H. (1991). Parallel genetic algorithms, population genetics and combinatorial optimization. In J.D. Becker, I. Eisele, & F.W. Mündemann (Eds.), Lecture Notes in Computer Science: Parallelism, learning, evolution (Vol. 565, pp. 398–406). Berlin, Heidelberg: Springer. Retrieved from http://link.springer.com/book/10.100 7/3-540-55027-5 10.1007/3-540-55027-5
  • Navon, R., & Goldschmidt, E. (2003). Monitoring labor inputs: Automated-data-collection model and enabling technologies. Automation in Construction, 12, 185–199.10.1016/S0926-5805(02)00043-2
  • Navon, R., & Sacks, R. (2007). Assessing research issues in Automated Project Performance Control (APPC). Automation in Construction, 16, 474–484.10.1016/j.autcon.2006.08.001
  • Ning, X., Lam, K.-C., & Lam, M.C.-K. (2011). A decision-making system for construction site layout planning. Automation in Construction, 20, 459–473.10.1016/j.autcon.2010.11.014
  • Osman, H.M., Georgy, M.E., & Ibrahim, M.E. (2003). A hybrid CAD-based construction site layout planning system using genetic algorithms. Automation in Construction, 12, 749–764.10.1016/S0926-5805(03)00058-X
  • Park, D.-J., Choi, Y.-B., & Nam, K.-C. (2006). RFID-based RTLS for improvement of operation system in container terminals. In Asia-Pacific Conference on Communications (APCC '06) (pp. 1–5). Busan: IEEE. doi:10.1109/APCC.2006.255837
  • Sadeghpour, F., Moselhi, O., & Alkass, S.T. (2006). Computer-aided site layout planning. Journal of Construction Engineering and Management, 132, 143–151.10.1061/(ASCE)0733-9364(2006)132:2(143)
  • Seehof, J.M., & Evans, W.O. (1967). Automated layout design programme. Journal of Industrial Engineering, 18, 690–695.
  • Sharma, D.K., and Peer, S.K. (2012). Multi-factor user interface components layout problem with genetic Aagorithm. Journal of Management Information and Decision Sciences, 15. Retrieved from https://www.questia.com/library/p150922/journal-of-management-information-and-decision-sciences/i2591871/vol-15-no-1-january
  • Singh, S.P., & Sharma, R.R.K. (2006). A review of different approaches to the facility layout problems. The International Journal of Advanced Manufacturing Technology, 30, 425–433.10.1007/s00170-005-0087-9
  • Song, J., Haas, C.T., & Caldas, C.H. (2006). Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132, 911–918.10.1061/(ASCE)0733-9364(2006)132:9(911)
  • Sørensen, K.B., Christiansson, P., & Svidt, K. (2010). Ontologies to support RFID-based link between virtual models and construction components. Computer-Aided Civil and Infrastructure Engineering, 25, 285–302.10.1111/mice.2010.25.issue-4
  • Succar, B. (2009). Building information modelling framework: A research and delivery foundation for industry stakeholders. Automation in Construction, 18, 357–375.10.1016/j.autcon.2008.10.003
  • Tam, C., Tong, T.K., Leung, A.W., & Chiu, G.W. (2002). Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128, 220–231.10.1061/(ASCE)0733-9364(2002)128:3(220)
  • Tam, K.Y., & Li, S.G. (1991). A hierarchical approach to the facility layout problem. International Journal of Production Research, 29, 165–184.10.1080/00207549108930055
  • Torrent, D.G., & Caldas, C.H. (2009). Methodology for automating the identification and localization of construction components on industrial projects. Journal of Computing in Civil Engineering, 23, 3–13.10.1061/(ASCE)0887-3801(2009)23:1(3)
  • Wong, R., Siu, J., and Ho, C.M.-F. (2005). Consideration between site layout facilities, provision of work equipments and construction planning for extremely large and complicated construction projects. In T. Hara (Ed.), 3rd International Structural Engineering Construction Conference. UK, Shunan, Japan: Taylor & Francis.
  • Xie, C., Turnquist, M. A., & Waller, S. T. (2012). A hybrid Lagrangian relaxation and Tabu search method for interdependent-choice network design problems. In J. Montoya-Torres, A. Juan, L. Huaccho Huatuco, J. Faulin, & G. Rodriguez-Verjan (Eds.) Hybrid Algorithms for Service, Computing and Manufacturing Systems: Routing and Scheduling Solutions (pp. 294-324). Hershey, PA: Information Science Reference. doi:10.4018/978-1-61350-086-6.ch013
  • Zhang, H., & Wang, J.Y. (2008). Particle swarm optimization for construction site unequal-area layout. Journal of Construction Engineering and Management, 134, 739–748.10.1061/(ASCE)0733-9364(2008)134:9(739)
  • Zouein, P., & Tommelein, I. (1999). Dynamic layout planning using a hybrid incremental solution method. Journal of Construction Engineering and Management, 125, 400–408.
  • Zouein, P.P., Harmanani, H., & Hajar, A. (2002). Genetic algorithm for solving site layout problem with unequal-size and constrained facilities. Journal of Computing in Civil Engineering, 16, 143–151.10.1061/(ASCE)0887-3801(2002)16:2(143)

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.