References
- Bhat, U. N. (1987). A sequential technique for the control of traffic intensity in Markovian queues. Annals of Operations Research, 8, 151–164.
- Bhat, U. N., & Rao, S. S. (1972). A statistical technique for the control of traffic intensity in the queueing systems M/G/1 and GI/M/1. Operations Research, 20, 955–966.
- Borror, C. M., Champ, C. W., & Rigdon, S. E. (1998). Poisson EWMA control charts. Journal of Quality Technology, 30, 352–361.
- Chen, N., Yuan, Y., & Zhou, S. (2011). Performance analysis of queue length monitoring of M/G/1 systems. Naval Research Logistics, 58, 782–794.
- Chen, N., & Zhou, S. (2014). CUSUM statistical monitoring of M/M/1 queues and extensions. Technometrics, doi:10.1080/00401706.2014.923787. Retrieved from http://amstat.tandfonline.com/doi/full/10.1080/00401706.2014.923787#.U9W5o9qS1dg
- Chowdhury, S., & Mukherjee, S. P. (2013). Estimation of traffic intensity based on queue length in a single M/M/1 queue. Communications in Statistics-theory and Methods, 42, 2376–2390.
- Clarke, A. B. (1957). Maximum likelihood estimates in a simple queue. The Annals of Mathematical Statistics, 28, 1036–1040.
- Gross, D., & Harris, C.M. (1998). Fundamentals of queueing theory. New York, NY: John Wiley & Sons.
- Han, D., & Tsung, F. (2006). A reference-free cuscore chart for dynamic mean change detection and a unified framework for charting performance comparison. Journal of the American Statistical Association, 101, 368–386.
- Han, S. W., Tsui, K. L., Ariyajunya, B., & Kim, S. B. (2010). A comparison of CUSUM, EWMA, and temporal scan statistics for detection of increases in poisson rates. Quality and Reliability Engineering International, 26, 279–289.
- Hawkins, D. M., & Olwell, D. H. (1998). Cumulative sum charts and charting for quality improvement. New York, NY: Springer-Verlag.
- Hendricks, K. B., & McClain, J. O. (1993). The output process of serial production lines of general machines with finite buffers. Management Science, 39, 1194–1201.
- Kenett, R. S., & Zacks, S. (1998). Modern industrial statistics: Design and control of quality and reliability. Pacific Grove, CA: Duxbury.
- Lee, S. H., & Jun, C. H. (2012). A process monitoring scheme controlling false discovery rate. Communications in Statistics-Simulation and Computation, 41, 1912–1920.
- Li, Z., Zhang, J., & Wang, Z. (2010). Self-starting control chart for simultaneously monitoring process mean and variance. International Journal of Production Research, 48(15), 4537–4553.
- Li, Z., Zou, C., Gong, Z., & Wang, Z. (2014). The computation of average run length and average time to signal: an overview. Journal of Statistical Computation and Simulation, 84(8), 1779–1802.
- Lucas, J. M., & Saccucci, M. S. (1990). Exponentially weighted moving average control schemes properties and enhancements. Technometrics, 32, 1–29.
- Montgomery, D. C. (2013). Introduction to statistical quality control (7th ed.). New York, NY: John Wiley & Sons.
- Pickands, J. & Stine, R. A. (1997). Estimation for an M/G/∞ queue with incomplete information. Biometrika, 84, 295–308.
- Qiu, P., & Li, Z. (2011). On nonparametric statistical process control of univariate processes. Technometrics, 53(4), 390–405.
- Qiu, P., Zou, C., & Wang, Z. (2010). Nonparametric profile monitoring by mixed effects modeling (with discussion). Technometrics, 52, 265–277.
- Reynolds, J. F. (1968). On the autocorrelation and spectral functions of queues. Journal of Applied Probability, 5, 467–475.
- Robert, S. W. (1959). Control chart test based on geometric moving averages. Technometrics, 1, 239–250.
- Ross, J., Taimre, T., & Pollett, P. (2007). Estimation for queues from queue length data. Queueing Systems, 55, 131–138.
- Shore, H. (2006). Control charts for the queue length in a G/G/S system. IIE Transactions, 38, 1117–1130.
- Shu, L., Jiang, W., & Wu, Z. (2012). Exponentially weighted moving average control charts for monitoring increases in poisson rate. IIE Transactions, 44, 711–723.
- Sonesson, C., & Bock, D. (2003). A review and discussion of prospective statistical surveillance in public health. Journal of the Royal Statistical Society, Series A, 166, 5–21.
- Su, Y., Shu, L., & Tsui, K. L. (2011). Adaptive EWMA procedures for monitoring processes subject to linear drifts. Computational Statistics and Data Analysis, 55, 2819–2829.
- Tsung, F., Zhao, Y., Xiang, L., & Jiang, W. (2006). Improved design of proportional integral derivative charts. Journal of Quality Technology, 38, 31–44.
- Zhou, Q., Zou, C., Wang, Z., & Jiang, W. (2012). Likelihood-based EWMA charts for monitoring poisson count data with time-varying sample sizes. Journal of American Statistical Association, 499, 1049–1062.
- Zi, X., Zou, C., Zhou, Q., & Wang, J. (2013). A directional multivariate sign EWMA control chart. Quality Technology and Quantitative Management, 10, 115–132.
- Zou, C., & Tsung, F. (2010). Likelihood ratio-based distribution-free EWMA control charts. Journal of Quality Technology, 42, 174–196.