126
Views
4
CrossRef citations to date
0
Altmetric
Articles

Performance comparison for the CRL control charts with estimated parameters for high-quality processes

, , &
Pages 31-43 | Accepted 16 May 2016, Published online: 17 Jul 2016

References

  • Bourke, P. D. (1991). Detecting a shift in fraction nonconforming using run-length control charts with 100% inspection. Journal of Quality Technology, 23, 225–238.
  • Bourke, P. D. (2006). The RL2 chart versus the np chart for detecting upward shifts in fraction defective. Journal of Applied Statistics, 33(1), 1–15.10.1080/02664760500389400
  • Calvin, T. (1983). Quality control techniques for “Zero Defects”. IEEE Transactions on Components, Hybrids, and Manufacturing Technology, 6, 323–328.10.1109/TCHMT.1983.1136174
  • Calzada, M. E., & Scariano, S. M. (2013). The synthetic t and synthetic EWMA t charts. Quality Technology and Quantitative Management, 10, 37–56.10.1080/16843703.2013.11673307
  • Casella, G., & Berger, R. L. (2001). Statistical inference. California: Duxbury.
  • Chakraborti, S., & Human, S. W. (2006). Parameter estimation and performance of the p-chart for attributes data. IEEE Transactions on Reliability, 55, 559–566.10.1109/TR.2006.879662
  • Chin Chang, T. C., & Gan, F. F. (2007). Modified Shewhart charts for high yield processes. Journal of Applied Statistics, 34, 857–877.10.1080/02664760701546279
  • Jensen, W. A., Jones-Farmer, L. A., Champ, C. W., & Woodall, W. H. (2006). Effects of parameter estimation on control chart properties: A literature review. Journal of Quality Technology, 38, 349–364.
  • Jones-Farmer, L. A., Woodall, W. H., Steiner, S. H., & Champ, C. W. (2014). An overview of phase I analysis for process improvement and monitoring. Journal of Quality Technology, 46, 265–280.
  • Lee, J., Wang, N., Xu, L., Schuh, A., & Woodall, W. H. (2013). The effect of parameter estimation on upper-sided Bernoulli cumulative sum charts. Quality and Reliability Engineering International, 29, 639–651.10.1002/qre.v29.5
  • Steiner, S. H., & MacKay, R. J. (2004). Effective monitoring of processes with parts per million defective: A hard problem! Frontiers in Statistical Quality Control, 7, 140–149.
  • Szarka, J. L., & Woodall, W. H. (2011). A review and perspective on surveillance of Bernoulli processes. Quality and Reliability Engineering International, 27, 735–752.10.1002/qre.v27.6
  • Szarka, J. L., & Woodall, W. H. (2012). On the equivalence of the Bernoulli and geometric CUSUM charts. Journal of Quality Technology, 44, 54–62.
  • Tang, L. C., & Cheong, W. T. (2004). Cumulative conformance count chart with sequentially updated parameters. IIE Transactions, 36, 841–853.10.1080/07408170490473024
  • Testik, M. C., McCullough, B. D., & Borrar, C. M. (2006). The effect of estimated parameters on poisson EWMA control charts. Quality Technology and Quantitative Management, 3, 513–527.10.1080/16843703.2006.11673129
  • Toubia-Stucky, G., Liao, H., & Twomey, J. (2012). A sequential Bayesian cumulative conformance count approach to deterioration detection in high yield processes. Quality and Reliability Engineering International, 28, 203–214.10.1002/qre.1236
  • Xie, M., Goh, T. N., & Kuralmani, V. (2002). Statistical models and control charts for high-quality processes. Berlin: Springer.10.1007/978-1-4615-1015-4
  • Yang, Z., Xie, M., Kuralmani, V., & Tsui, K. L. (2002). On the performance of geometric charts with estimated control limits. Journal of Quality Technology, 34, 448–458.
  • Zhang, L., Govindaraju, K., Bebbington, M., & Lai, C. D. (2004). On the statistical design of geometric control charts. Quality Technology and Quantitative Management, 1, 233–243.10.1080/16843703.2004.11673075
  • Zhang, M., Nie, G., & He, Z. (2014). Performance of cumulative count of conforming chart of variable sampling intervals with estimated control limits. International Journal of Production Economics, 150, 114–124.10.1016/j.ijpe.2013.12.013
  • Zhang, M., Peng, Y., Schuh, A., Megahed, F. M., & Woodall, W. H. (2013). Geometric charts with estimated control limits. Quality and Reliability Engineering International, 29, 209–223.10.1002/qre.1304

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.