186
Views
5
CrossRef citations to date
0
Altmetric
Articles

Phase II synthetic exponential charts and effect of parameter estimation

, &
Pages 125-142 | Accepted 06 Mar 2017, Published online: 21 Mar 2017

References

  • Borror, C. M., Keats, J. B., & Montgomery, D. C. (2003). Robustness of the time between events CUSUM. International Journal of Production Research, 41, 3435–3444.
  • Bourke, P. D. (1991). Detecting a shift in fraction nonconforming using run-length control charts with 100% inspection. Journal of Quality Technology, 23, 225–238.
  • Calzada, M. E., & Scariano, S. M. (2013). A synthetic control chart for the coefficient of variation. Journal of Statistical Computation and Simulation, 83, 853–867.
  • Castagliola, P., Celano, G., & Psarakis, S. (2011). Monitoring the coefficient of variation using EWMA charts. Journal of Quality Technology, 43, 249–265.
  • Castagliola, P., Wu, S., Khoo, M. B. C., & Chakrabortid, S. (2014). Synthetic Phase II Shewhart-type attributes control charts when process parameters are estimated. Quality and Reliability Engineering International, 30, 315–335.
  • Celano, G., & Castagliola, P. (2016). A synthetic control chart for monitoring the ratio of two normal variables. Quality and Reliability Engineering International, 32, 681–696.
  • Chen, F. L., & Huang, H. J. (2005). A synthetic control chart for monitoring process dispersion with sample range. The International Journal of Advanced Manufacturing Technology, 26, 842–851.
  • Davis, R., & Woodall, W. H. (2002). Evaluating and improving the synthetic control chart. Journal of Quality Technology, 34, 200–208.
  • Dickinson, R. M. (2014). Olteanu Roberts DA, Driscoll AR, Woodall WH, Vining GG. CUSUM charts for monitoring the characteristic life of censored Weibull lifetimes. Journal of Quality Technology, 46, 340–358.
  • Epprecht, E. K., Loureiro, L. D., & Chakraborti, S. (2015). Effect of the amount of Phase I data on the Phase II performance of S2 and S control charts. Journal of Quality Technology, 47, 139–155.
  • Fang, Y. Y., Khoo, M. B. C., & Lee, M. H. (2013). Synthetic-type control charts for time-between-events monitoring. Plos One, 8(6), 1–13.
  • Fang, Y. Y., Khoo, M. B. C., Teh, S. Y., & Xie, M. (2016). Monitoring of time-between-events with a generalized group runs control chart. Quality and Reliability Engineering International, 32, 767–781.
  • Gan, F. F. (1992). Exact run length distributions for one-sided exponential CUSUM schemes. Statistica Sinica, 2, 297–312.
  • Gan, F. F. (1998). Designs of one- and two-sided exponential EWMA charts. Journal of Quality Technology, 30, 55–69.
  • Gan, F. F., & Chang, T. C. (2000). Computing average run lengths of exponential EWMA charts. Journal of Quality Technology, 32, 183–187.
  • Guo, B., Wang, B. X., & Xie, M. (2014). ARL-unbiased control charts for the monitoring of exponentially distributed characteristics based on type-II censored samples. Journal of Statistical Computation and Simulation, 84, 2734–2747.
  • Huang, H. J., & Chen, F. L. (2005). A synthetic control chart for monitoring process dispersion with sample standard deviation. Computers & Industrial Engineering, 49, 221–240.
  • Jensen, W. A., Jones-Farmer, L. A., Champ, C. W., & Woodall, W. H. (2006). Effects of parameter estimation on control chart properties: A literature review. Journal of Quality Technology, 38, 349–364.
  • Jones, M. A., & Steiner, S. H. (2012). Assessing the effect of estimation error on risk-adjusted CUSUM chart performance. International Journal for Quality in Health Care, 24, 176–181.
  • Khoo, M. B. C., Wong, V. H., Wu, Z., & Castagliola, P. (2012). Optimal design of the synthetic chart for the process mean based on median run length. IIE Transactions, 44, 765–779.
  • Kittlitz, R. G. (1999). Transforming the exponential for SPC applications. Journal of Quality Technology, 31, 301–308.
  • Kuralmani, V., Xie, M., Goh, T. N., & Gan, F. F. (2002). A conditional decision procedure for high yield processes. IIE Transactions, 34, 1021–1030.
  • Liu, J. Y., Xie, M., & Goh, T. N. (2006). CUSUM chart with transformed exponential data. Communications in Statistics-Theory and Methods, 35, 1829–1843.
  • Liu, J. Y., Xie, M., Goh, T. N., & Chan, L. Y. (2007). A study of EWMA chart with transformed exponential data. International Journal of Production Research, 45, 743–763.
  • Lucas, J. (1985). Counted data CUSUM’s. Technometrics, 27, 129–144.
  • Machado, M. A., & Costa, A. F. B. (2014). Some comments regarding to the synthetic X̄ chart. Communications in Statistics-Theory and Methods, 43, 2897–2906.
  • Ozsan, G., Testik, M. C., & Weiß, C. H. (2010). Properties of the exponential EWMA chart with parameter estimation. Quality and Reliability Engineering International, 26, 555–569.
  • Pehlivan, C., & Testik, M. C. (2010). Impact of model misspecification on the exponential EWMA charts: a robustness study when the time-between-events are not exponential. Quality and Reliability Engineering International, 26, 177–190.
  • Psarakis, S., Vyniou, A. K., & Castagliola, P. (2014). Some recent developments on the effects of parameter estimation on control charts. Quality and Reliability Engineering International, 30, 1113–1129.
  • Rajmanya, S. V., & Ghute, V. B. (2013). A synthetic control chart for monitoring process variability. Quality and Reliability Engineering International, 30, 130–1309.
  • Reynolds, M. R., Jr, & Stoumbos, Z. G. (2004). Should observations be grouped for effective process monitoring. Journal of Quality Technology, 36, 343–366.
  • Saleh, N. A., Mahmoud, M. A., Keefe, M. J., & Woodall, W. H. (2015). The difficulty in designing Shewhart X̄ and X control charts with estimated parameters. Journal of Quality Technology, 47, 127–138.
  • Scariano, S. M., & Calzada, M. E. (2003). A note on the lower-sided synthetic chart for exponentials. Quality Engineering, 15, 677–680.
  • Scariano, S. M., & Calzada, M. E. (2009). The generalized synthetic chart. Sequential Analysis: Design Methods and Applications, 28, 54–68.
  • Sim, C. (2003). Combined x̄ and CRL chart for the gamma process. Computational Statistics, 18, 547–563.
  • Vardeman, S., & Ray, D. (1985). Average run lengths for CUSUM schemes when observations are exponentially distributed. Technometrics, 27, 145–150.
  • Wu, Z., Ou, Y., Castagliola, P., & Khoo, M. B. C. (2010). A combined synthetic & X chart for monitoring the process mean. International Journal of Production Research, 48, 7423–7436.
  • Wu, Z., & Spedding, T. A. (2000). A synthetic control chart for detecting small shifts in the process mean. Journal of Quality Technology, 32, 32–38.
  • Wu, Z., & Tian, Y. (2005). Weighted-loss-function CUSUM chart for monitoring mean and variance of a production process. International Journal of Production Research, 43, 3027–3044.
  • Wu, Z., & Yeo, S. H. (2001). Spedding TA. A synthetic control chart for detecting fraction nonconforming increases. Journal of Quality Technology, 33, 104–111.
  • Xie, M., Goh, T. N., & Ranjan, P. (2002). Some effective control chart procedures for reliability monitoring. Reliability Engineering & System Safety, 77, 143–150.
  • Yang, J., Yu, H., Cheng, Y., & Xie, M. (2015). Design of exponential control charts based on average time to signal using a sequential sampling scheme. International Journal of Production Research, 53, 2131–2145.
  • Yegulalp, T. M. (1975). Control charts for exponentially distributed product life. Naval Research Logistics Quarterly, 22, 697–712.
  • You, H. W., Khoo, M. B. C., Castagliola, P., & Ou, Y. (2015). Side sensitive group runs X̄ chart with estimated process parameters. Computational Statistics, 30, 1245–1278.
  • Zhang, Y., Castagliola, P., Wu, Z., & Khoo, M. B. C. (2011). The synthetic X̄ chart with estimated parameters. IIE Transactions, 43, 676–687.
  • Zhang, M., Megahed, F. M., & Woodall, W. H. (2014). Exponential CUSUM charts with estimated control limits. Quality and Reliability Engineering International, 30, 275–286.
  • Zhang, H. Y., Shamsuzzaman, M., Xie, M., & Goh, T. N. (2011). Design and application of exponential chart for monitoring time-between-events data under random process shift. International Journal of Advanced Manufacturing Technology, 57, 849–857.
  • Zhang, C. W., Xie, M., & Goh, T. N. (2005). Economic design of exponential charts for time between events monitoring. International Journal of Production Research, 43, 5019–5032.
  • Zhang, C. W., Xie, M., & Goh, T. N. (2006). Design of exponential control charts using a sequential sampling scheme. IIE Transactions, 38, 1105–1116.
  • Zhang, C. W., Xie, M., Liu, J. Y., & Goh, T. N. (2007). A control chart for the Gamma distribution as a model of time between events. International Journal of Production Research, 45, 5649–5666.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.