143
Views
7
CrossRef citations to date
0
Altmetric
Articles

An integrated inventory model for items with acceptable defective items under warranty and quality improvement investment

&
Pages 702-715 | Accepted 24 May 2017, Published online: 13 Jun 2017

References

  • Aderohunmu, R., Mobolurin, A., & Bryson, N. (1995). Joint vendor–buyer policy in JIT manufacturing. Journal of the Operational Research Society, 46, 375–385.10.1057/jors.1995.52
  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292–311.10.1111/deci.1986.17.issue-3
  • Banerjee, A., & Burton, J. S. (1994). Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers. International Journal of Production Economics, 35, 215–222.10.1016/0925-5273(94)90084-1
  • Banerjee, A., & Kim, S. L. (1995). An integrated JIT inventory model. International Journal of Operations and Production Management, 15, 237–244.10.1108/01443579510099760
  • Barlow, R. E., & Proschan, F. (1965). Mathematical theory of reliability. New York, NY: Wiley.
  • Ben-Daya, M. (2002). The economic production lot-sizing problem with imperfect production processes and imperfect maintenance. International Journal of Production Economics, 76, 257–264.10.1016/S0925-5273(01)00168-2
  • Ben-Daya, M., Darwish, M., & Ertogral, K. (2008). The joint economic lot sizing problem: Review and extensions. European Journal of Operational Research, 185, 726–742.10.1016/j.ejor.2006.12.026
  • Blischke, W. R., & Murthy, D. N. P. (1992). Product warranty management-I: A taxonomy for warranty policies. European Journal of Operational Research, 62, 127–148.10.1016/0377-2217(92)90242-2
  • Blischke, W. R., & Murthy, D. N. P. (1994). Warranty cost analysis. New York, NY: Marcel Dekker.
  • Bogaschewsky, R. W., Buscher, U. D., & Lindner, G. (2001). Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. Omega, 29, 183–191.10.1016/S0305-0483(00)00040-2
  • Bose, S., Goswami, A., & Chaudhuri, K. S. (1995). An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting. Journal of the Operational Research Society, 46, 771–782.10.1057/jors.1995.107
  • Chien, Y. H. (2008). A general age-replacement model with minimal repair under renewing free-replacement warranty. European Journal of Operational Research, 186, 1046–1058.10.1016/j.ejor.2007.02.030
  • Chien, Y. H. (2010). The effect of a pro-rata rebate warranty on the age replacement policy with salvage value consideration. IEEE Transactions on Reliability, 59, 383–392.10.1109/TR.2010.2048677
  • Chien, Y. H., & Chen, J. A. (2008). Optimal spare ordering policy under a rebate warranty. European Journal of Operational Research, 186, 708–719.10.1016/j.ejor.2007.02.026
  • Chung, K. J., & Hou, K. L. (2003). An optimal production run time with imperfect production processes and allowable shortages. Computers & Operations Research, 30, 483–490.10.1016/S0305-0548(01)00091-0
  • Darghouth, M. N., Chelbi, A., & Ait-kadi, D. (2012). A profit assessment model for equipment inspection and replacement under renewing free replacement warranty policy. International Journal of Production Economics, 135, 899–906.10.1016/j.ijpe.2011.10.029
  • Goyal, S. K. (1976). An integrated inventory model for a single-supplier-single customer problem. International Journal of Production Research, 15, 107–111.
  • Goyal, S. K. (1988). ‘A joint economic-lot-size model for purchaser and vendor’: A comment. Decision Sciences, 19, 236–241.10.1111/deci.1988.19.issue-1
  • Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82, 209–210.10.1016/0377-2217(93)E0357-4
  • Goyal, S. K., & Gupta, Y. P. (1989). Integrated inventory models: The buyer-vendor coordination. European Journal of Operational Research, 41, 261–269.10.1016/0377-2217(89)90247-6
  • Goyal, S. K., & Nebebe, F. (2000). Determination of economic production–shipment policy for a single-vendor–single-buyer system. European Journal of Operational Research, 121, 175–178.10.1016/S0377-2217(99)00013-2
  • Goyal, S. K., & Szendrovits, A. Z. (1986). A constant lot size model with equal and unequal sized batch shipments between production stages. Engineering Costs and Production Economics, 10, 203–210.10.1016/S0167-188X(86)80002-7
  • Goyal, S. K., Srinivasan, G., & Arcelus, F. J. (1991). One time only incentives and inventory policies. European Journal of Operational Research, 54, 1–6.10.1016/0377-2217(91)90318-P
  • Goyal, S. K., Huang, C. K., & Chen, K. C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning and Control, 14, 596–602.10.1080/09537280310001626188
  • Ha, D., & Kim, S. L. (1997). Implementation of JIT purchasing: An integrated approach. Production Planning and Control, 8, 152–157.10.1080/095372897235415
  • Harris, F. W. (1915). What quantity to make at once. The library of factory management. (Vol. V, pp. 47–52). Operations and costs, Chicago, IL: A. W. Shaw Company.
  • Hill, R. M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalised policy. European Journal of Operational Research, 97, 493–499.10.1016/S0377-2217(96)00267-6
  • Hoque, M. A., & Goyal, S. K. (2000). An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65, 305–315.10.1016/S0925-5273(99)00082-1
  • Huang, C. K. (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning and Control, 13, 355–361.10.1080/09537280110112424
  • Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.10.1016/S0925-5273(03)00220-2
  • Jagieta, L., & Michenzi, A. R. (1982). Inflation’s impact on the economic lot quantity (EOQ) formula. Omega, 10, 698–699.10.1016/0305-0483(82)90073-1
  • Khouja, M., & Mehrez, A. (1994). Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45, 1405–1417.10.1057/jors.1994.217
  • Khouja, M., & Park, S. (2003). Optimal lot sizing under continuous price decrease. Omega, 31, 539–545.10.1016/j.omega.2003.08.009
  • Kim, S. L., & Ha, D. (2003). A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage. International Journal of Production Economics, 86, 1–10.10.1016/S0925-5273(03)00006-9
  • Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.10.1016/0377-2217(93)E0253-T
  • Mamer, J. W. (1982). Cost analysis of pro rata and free-replacement warranties. Naval Research Logistics Quarterly, 29, 345–356.10.1002/(ISSN)1931-9193
  • Mamer, J. W. (1987). Discounted and per unit costs under warranty: Cost moments and time variability. Operations Research, 34, 554–559.
  • Mitra, A., & Patankar, J. G. (1993). Market share and warranty costs for renewable warranty programs. International Journal of Production Economics, 20, 111–123.
  • Murthy, D. N. P. (1990). Optimal reliability choice in product design. Engineering Optimization, 15, 280–294.
  • Murthy, D. N. P., & Blischke, W. R. (1992). Product warranty management-II: An integrated framework for study. European Journal of Operational Research, 62, 261–281.10.1016/0377-2217(92)90117-R
  • Nguyen, D. G., & Murthy, D. N. P. (1988). Failure free warranty policies for non-repairable products: A review and some extensions. PAIRO Operational Research, 22, 205–220.
  • Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2007). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108, 349–358.10.1016/j.ijpe.2006.12.019
  • Pentico, D. W., & Drake, M. J. (2008). The deterministic EOQ with partial backordering: a new approach. European Journal of Operational Research, 194, 102–113.
  • Pentico, D. W., Drake, M. J., & Toews, C. (2009). The deterministic EPQ with partial backordering: a new approach. Omega, 37, 624–636.10.1016/j.omega.2008.03.002
  • Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48–55.10.1080/07408178608975329
  • Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.10.1016/S0925-5273(99)00044-4
  • Shih, W. (1980). Optimal inventory policies when stockouts result from defective products. International Journal of Production Research, 18, 677–686.10.1080/00207548008919699
  • Shu, H., & Zhou, X. (2014). An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement. International Journal of Systems Science, 45, 1242–1252.10.1080/00207721.2013.786155
  • Silver, E. A. (1976). Establishing the reorder quantity when the amount received is uncertain. INFORM, 14, 32–39.
  • Silver, E. A., Pyke, F. D., & Peterson, R. (1998). Inventory management and production planning and scheduling. New York, NY: Wiley.
  • Thorpe, J. F., & Middendorf, W. H. (1979). Product liability. New York, NY: Marcel Dekker.
  • Vijayashree, M., & Uthayakuman, R. (2014). An integrated inventory model with controllable lead time and setup cost reduction for defective and non-defective items. International Journal of Supply and Operations Management, 1, 190–215.
  • Wang, S., & Sarker, B. R. (2006). Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy. European Journal of Operational Research, 172, 179–200.10.1016/j.ejor.2004.10.001
  • Yang, J. S., & Pan, J. C. (2004). Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research, 42, 853–863.
  • Yang, P. C., & Wee, H. M. (2000). Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach. Production Planning and Control, 11, 41–47.
  • Yang, M. F., Lo, M. C., & Lu, T. P. (2013). A vendor-buyers integrated inventory model involving quality improvement investment in a supply chain. Journal of Marine Science and Technology, 21, 586–593.
  • Yao, M. J., & Chiou, C. C. (2004). On a replenishment coordination model in an integrated supply chain with one vendor and multiple buyers. European Journal of Operational Research, 159, 406–419.10.1016/j.ejor.2003.08.024
  • Yao, M. J., & Hsu, T. C. (2009). An efficient search algorithm for obtaining the optimal replenishment strategies in multi-stage just-in-time supply chain systems. Journal of Industrial and Management Optimization, 5, 11–32.
  • Yeh, R. H., Chen, G. C., & Chen, M. Y. (2005). Optimal age-replacement policy for nonrepairable products under renewing free-replacement warranty. IEEE Transactions on Reliability, 54, 92–97.10.1109/TR.2004.841723
  • Yu, H. F., & Yu, W. C. (2008). The optimal production and quality policy for the vendor in a trade. International Journal of Production Research, 46, 4135–4153.10.1080/00207540601013481
  • Yu, H. F., Hsu, W. K., & Chang, W. J. (2012). EOQ model where a portion of the defectives can be used as perfect quality. International Journal of Systems Science, 43, 1689–1698.10.1080/00207721.2010.549593
  • Zipkin, P. H. (2000). Foundations of inventory management. New York, NY: McGraw-Hill.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.