85
Views
3
CrossRef citations to date
0
Altmetric
ARTICLE

Concurrent Engineering Readiness Assessment Tool for Construction

, &
Pages 163-179 | Published online: 06 Jun 2011

REFERENCES

  • Ainscough , M. S. and Yazdani , B. 1999 . “ ‘Concurrent engineering within British industry’ ” . In Proceedings of Advances in Concurrent Engineering (CE99), Bath, UK Edited by: Chawdhry , P. K. , Ghodous , P. and Vandorpe , D. 443 – 448 . 1–3 September, University of Bath
  • Al-Ashaab , A. and Molina , A. 1999 . “ ‘Concurrent engineering framework: A Mexican perspective’ ” . In Proceedings of Advances in Concurrent Engineering (CE99), Bath, UK Edited by: Chawdhry , P. K. , Ghodous , P. and Vandorpe , D. 435 – 442 . 1–3 September, University of Bath
  • Aouad , G. , Cooper , R. , Kagioglou , M. , Hinks , J. and Sexton , M. 1998 . A Synchronised Process/IT Model to Support the Co-maturation of Processes and IT in the Construction Sector Time Research Institute, University of Salford .
  • Bergman , L. and Ohlund , S. 1995 . “ ‘Development of an assessment tool to assist in the implementation of concurrent engineering’ ” . In Proceedings of Conference on Concurrent Engineering: A Global Perspective, August Edited by: Paul , A. J. and Sobolewski , M. 499 – 510 . Washington, DC : CTC .
  • Brookes , N. J. , Backhouse , C. J. and Burns , N. D. 2000 . ‘Improving product introduction through appropriate organization: The development of the SIMPLOFI positioning tool’, in Proceedings of Institution of Mechanical Engineers Vol 214, Part B . Journal of Engineering Manufacture , : 339 – 364 . Professional Engineering Publishing
  • Brooks , B. M. and Foster , S. G. 1997 . “ ‘Implementing concurrent engineering’ ” . In Concurrent Engineering—The Agenda for Success Edited by: Medhat , S . Baldock : Research Studies Press .
  • CERC Report . 1993 . Final Report on Readiness Assessment for Concurrent Engineering for DICE West Virginia University, CE Research Centre .
  • CERC Technical Report . 1992 . Process Issues in Implementing Concurrent Engineering West Virginia University, CE Research Centre .
  • Chen , G. 1996 . “ ‘The organizational management framework for implementation of concurrent engineering in the Chinese context’ ” . In Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26–28 August 1996, 165–171 Edited by: Sobolewski , M. and Fox , M. Technomic Publishing Co, Lancaster, PP .
  • Componation , P. J. and Byrd , J. Jr . 1996 . “ ‘A readiness assessment methodology for implementing concurrent engineering’ ” . In Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26–28 August 1996, 150–156 Edited by: Sobolewski , M. and Fox , M. Technomic Publishing Co, Lancaster PP .
  • Crow , K. A. 1994 . Building Effective Product Development Teams Palos Verdes, CA DRM Associates .
  • de Graaf , R. and Sol , E. J. 1994 . “ ‘Assessing Europe's readiness for concurrent engineering’ ” . In Proceedings of Conference on Concurrent Engineering: Research and Application, Pittsburgh, PA, August 29–31 Edited by: Paul , A. J. and Sobolewski , M. 77 – 82 . London : Academic Press .
  • Egan , J. 1998 . Rethinking Construction: Report of the Construction Task Force on the Scope for Improving the Quality and Efficiency of UK Construction Industry London : Department of the Environment, Transport and the Regions .
  • Evbuomwan , N. F.O. and Anumba , C. J. 1998 . ‘An integrated framework for concurrent life-cycle design and construction’ . Advances in Engineering Software , 5 ( 7–9 ) : 587 – 597 .
  • Finnemore , M. and Sarshar , M. 2000 . “ ‘Linking construction process improvement to business benefit’ ” . In Proceedings of the Bizarre Fruit 2000 National Conference of Postgraduate Research in the Built and Human Environment, Salford, UK, 9–10 March Edited by: Sun , M. , Aouad , G. , Ormerod , M. and Ruddock , L. 94 – 106 . University of Salford
  • Kamara , J. M. , Anumba , C. J. and Evbuomwan , N. F.O. 2000 . ‘Developments in the implementation of concurrent engineering in construction’ . International Journal of Computer Integrated Design andand Construction , 2 ( 1 ) : 68 – 78 .
  • Khalfan , M. M.A. and Anumba , C. J. 2000a . “ ‘A comparative review of concurrent engineering readiness assessment tools and models’ ” . In Concurrent Engineering 2000 (CE 2000) Conference, Lyon, France, 1–20 July Edited by: Ghodous , P. and Vandorpe , D. 578 – 585 . Lancaster, PA : Technomic Publishing Company, Inc .
  • Khalfan , M. M.A. and Anumba , C. J. 2000b . “ ‘Readiness assessment for concurrent engineering in construction’ ” . In Proceedings of the Bizarre Fruit 2000 National Conference of Postgraduate Research in the Built and Human Environment, Salford, UK, 9–10 March Edited by: Sun , M. , Aouad , G. , Ormerod , M. and Ruddock , L. 42 – 54 . University of Salford
  • Khalfan , M. M.A. and Anumba , C. J. 2000c . “ ‘Implementation of concurrent engineering in construction—readiness assessment’ ” . In Proceedings of the Construction Information Technology 2000 Conference, Reykjavik, Iceland, 28–30 June Edited by: Gudnason , G . Vol. 1 , 544 – 555 . Reykjavik : Iceland Building Research Institute .
  • Koskela , L. 2003 . ‘Is structural change the primary solution to the problems of construction’ . Building Research and Information , 31 ( 2 ) : 85 – 96 .
  • Kwak , Y. H. and Ibbs , C. W. 1997 . Project Management Process Maturity (PM)2 Model http://www.ce.berkeley.edu/∼yhkwak/pmmaturity.html
  • Latham , M. 1994 . Constructing the Team, Final Report on Joint Review of Procurement and Contractual Agreements in the UK Construction Industry London : HMSO .
  • Love , P. E.D. and Gunasekaran , A. 1997 . ‘Concurrent engineering in the construction industry’ . Concurrent Engineering: Research and Applications , 5 ( 2 ) : 155 – 162 .
  • Martin , A. and Evans , S. 1992 . “ ‘Project planning in a concurrent engineering environment’ ” . In Proceedings of 3rd International Conference on Factory 2000, York, UK, July 1992 298 – 303 . London : IEE Publication No. 359 .
  • Muya , M. , Price , A. D.F. and Thrope , A. 1999 . “ ‘Contractors' supplier management’ ” . In Proceedings of a Joint Triennial Symposium, Cape Town, 5–10 September 1999 Edited by: Bowen , P. A. and Hindle , R. D. Vol. 2 , 632 – 640 . Rotterdam : CIB .
  • Paul , J. and Burns , C. 1997 . “ ‘Implementing a business process re-engineering programme’ ” . In Concurrent Engineering—The Agenda for Success Edited by: Medhat , S. Baldock, Hertfordshire : Research Studies Press .
  • SPICE Questionnaire . 1998 . Key Construction Process Questionnaire, Ver. 1.0 Salford University .
  • Winner , R. I. , Pennell , J. P. , Bertrend , H. E. and Slusarczuk , M. M.G. 1988 . The Role of Concurrent Engineering in Weapons' System Acquisition , IDA Report R-338 Alexandria, VA : Institute for Defence Analyses .
  • Wognum , P. M. , Stoeten , B. J.B. , Kerkhof , M. and de Graaf , R. 1996 . “ ‘PMO-RACE: A combined method for assessing organisations for CE’ ” . In Advances in Concurrent Engineering, Proceedings of 3rd ISPE International Conference on Concurrent Engineering: Research and Applications, University of Toronto, Ontario, Canada, 26–28 August Edited by: Sobolewski , M. and Fox , M. 113 – 120 . Lancaster, PA, Technomic Publishing Co, Inc
  • Yin , R. K. 1989 . Case Study Research: Design and Methods , Applied Social Research Methods Series Vol. 5 , Sage Publications .
  • Young , R. I.M. 1999 . Organisational Issues in Concurrent Engineering , Department of Manufacturing Engineering, Loughborough University, Lecture Notes, Section 2 8 – 15 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.