References
- N. Vagenas, Applications of discrete-event simulation in Canadian mining operations in the nineties. Int. J. Surf. Min. Reclam. Environ. 13(2) (1999), pp. 77–78.10.1080/09208119908944213
- G. Yuriy and N. Vayenas, Discrete-event simulation of mine equipment systems combined with a reliability assessment model based on genetic algorithms, Int. J. Surf. Min. Reclam. Environ. 22(1) (2008), pp. 70–83.10.1080/17480930701589674
- A.M. Newman, E. Rubio, R. Caro, A. Weintraub, and K. Eurek, A review of operations research in mine planning, Interfaces 40(3) (2010), pp. 222–245.10.1287/inte.1090.0492
- J. Wolgram, Z. Li, and M. Scoble, Application of simulation techniques in Oyu Tolgoi underground development scheduling, In Proceedings of the 6th International Conference and Exhibition of Mass Mining, Sudbury, ON, 2012.
- S. Mak and D. Picken, Using risk analysis to determine construction project contingencies, J. Constr. Eng. Manage. 126(2) (2000), pp. 130–136.10.1061/(ASCE)0733-9364(2000)126:2(130)
- J. Raftery, Risk Analysis in Project Management, Routledge, London 2003.
- P. Knites and E. Bonates, Applications of discrete mine simulation modeling in South America, Int. J. Surf. Min. Reclam. Environ. 13(2) (1999), pp. 69–72.
- A.W. Ovalle, Mass caving maximum production capacity, In Proceedings of the 6th International Conference and Exhibition of Mass Mining, Sudbury, ON, 2012.