302
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Optimisation of dragline inspection intervals with time-counter algorithm

&
Pages 412-425 | Received 26 Jan 2017, Accepted 29 May 2017, Published online: 20 Jun 2017

References

  • B. Forsmann and U. Kumar, Surface mining equipment and maintenance trends in the Scandinavian countries, J. Mines Met. Fuels. 40 (1992), pp. 267–269.
  • Unger, R. L. and Conway, K., Impact of maintainability design on injury rates and maintenance costs for underground mining equipment, in Special Publication Report No. 18–94: Improving Safety at Small Underground Mines, R.H. Peters, ed., Bureau of Mines, Washington, DC, 1994, pp. 140–167.
  • D. Clark, Tribology – Its applications to equipment reliability and maintainability design in the underground coal mining industry, Proceedings of the Institution of Engineers Aus- tralia Tribology Conference, Brisbane, 1990, pp. 38–44.
  • R.K. Mobley, Maintenance Fundamentals, Butterworth-Heinemann, Burlington, MA, 2004.
  • R. Smith, Rules of Thumb for Maintenance and Reliability Engineers, Butterworth-Heinemann, Burlington, MA, 2007.
  • The USA Department of Energy, Types of Maintenance Programs, Office of Energy Efficiency and Renewable Energy, n.d. Available at February 2015 https://www1.eere.energy.gov/femp/pdfs/OM_5.pdf
  • O. Gölbaşı and N. Demirel, Determination of optimal time intervals for the dragline maintenance using probabilistic approaches, in Proceedings of International Symposium on Mine Planning and Equipment Selection, Springer International Publishing, Dresden, Germany, 2013, pp. 1195–1203.
  • J.A. Andrawus, J. Watson, M. Kishk, and H. Gordon, Optimisation of Wind Turbine Inspection Intervals, Wind Eng. 32 (2008), pp. 477–490. doi:10.1260/030952408786411921.
  • A.H. Christer and S.K. Lee, Modelling ship operational reliability over a mission under regular inspections, J. Oper. Res. Soc. 48 (1997), pp. 688–699. doi:10.1057/palgrave.jors.2600424.
  • N. Arthur, Optimization of vibration analysis inspection intervals for an offshore oil and gas water injection pumping system, Proc. Inst. Mech. Eng. Part E J. Process Mech. Eng. 219 (2005), pp. 251–259. doi:10.1243/095440805X8638.
  • A. Pillay, J. Wang, A. Wall, T. Ruxton, and C. G. Loughran, Formal safety assessment of fishing vessels: Risk and maintenance modelling. Proc. Inst. Mar. Eng. Sci. Technol. Part A J. Mar. Eng. Technol. 3 (2004), pp. 29–42. doi: 10.1080/20464177.2004.11020178.
  • A.H. Christer, Condition-based inspection models of major civil-engineering structures, J. Oper. Res. Soc. 39 (1988), pp. 71–82. doi:10.2307/2582000.
  • D.F. Redmond, A.H. Christer, S.R. Rigden, E. Burley, A. Tajelli, and A. Abu-Tair, O.R. modelling of the deterioration and maintenance of concrete structures, Eur. J. Oper. Res. 99 (1997), pp. 619–631. doi:10.1016/S0377-2217(96)00325-6.
  • P. Scarf and H.A. Majid, Modelling warranty extensions: A case study in the automotive industry, Proc. Inst. Mech. Eng. Part O J. Risk Reliab. 225 (2011), pp. 251–265. doi:10.1177/1748006X11401801.
  • A. H. Christer, Innovatory decision making, in The Role and Effectiveness of Theories of decision in Practice, K. Bowen and D. J. White, eds, Hodder and Stoughton, London, 1973, pp. 369–377.
  • A.H. Christer, Prototype modelling of irregular condition monitoring of production plant, IMA J. Manage. Math. 3 (1991), pp. 219–232. doi:10.1093/imaman/3.3.219.
  • X. Jia and A.H. Christer, A periodic testing model for a preparedness system with a defective state, IMA J. Manage. Math. 13 (2002), pp. 39–49. doi:10.1093/imaman/13.1.39.
  • J. Zhao, A.H. Chan, C. Roberts, and K.B. Madelin, Reliability evaluation and optimisation of imperfect inspections for a component with multi-defects, Reliab. Eng. Syst. Saf. 92 (2007), pp. 65–73. doi:10.1016/j.ress.2005.11.003.
  • W. Wang, An inspection model based on a three-stage failure process, Reliab. Eng. Syst. Saf. 96 (2011), pp. 838–848. doi:10.1016/j.ress.2011.03.003.
  • R. Flage, A delay time model with imperfect and failure-inducing inspections, Reliab. Eng. Syst. Saf. 124 (2014), pp. 1–12. doi:10.1016/j.ress.2013.11.009.
  • W. Wang, D. Banjevic, and M. Pecht, A multi-component and multi-failure mode inspection model based on the delay time concept, Reliab. Eng. Syst. Saf. 95 (2010), pp. 912–920. doi:10.1016/j.ress.2010.04.004.
  • W. Wang, M.J. Carr, and T.W. Chow, A two-level inspection model with technological insertions, IEEE Trans. Reliab. 61 (2012), pp. 479–490. doi:10.1109/TR.2012.2183911.
  • N. Demirel and O. Gölbaşı, Preventive replacement decisions for dragline components using reliability analysis, Minerals 6 (2016), p. 51. doi:10.3390/min6020051.
  • O. Gölbaşı and N. Demirel. Risk-based reliability allocation methodology to set a maintenance priority among system components: A case study in Mining. Eksploatacja i Niezawodnosc – Maint. Reliab. 19 (2017), pp. 191–202. doi:10.17531/ein.2017.2.6.
  • N. Demirel, O. Gölbaşı, Ş. Düzgün, and S. Kestel, System reliability investigation of draglines using fault tree analysis, Proceedings of International Symposium on Mine Planning and Equipment Selection, Springer International Publishing, Dresden, Germany, 2013, pp. 1151–1158.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.