References
- A. Bley, N. Boland, C. Fricke, and G. Froyland, A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Comput. Oper. Res. 37 (9) (2010), pp. 1641–1647. doi:10.1016/j.cor.2009.12.008.
- B. Groeneveld, E. Topal, and B. Leenders, Robust, flexible and operational mine design strategies, Min. Techno. 121 (2012), pp. 20–28. doi:10.1179/1743286311Y.0000000018.
- B. Tolwenski and R. Underwood, A scheduling algorithm for open pit mines, IMA J. Math. Appl. Bus. Ind. 7 (1996), pp. 247–270.
- M. Gershon, Mine scheduling optimization with mixed integer programming, Min. Engg. 35 (1983), pp. 351–354.
- B. Tachefine and F. Soumis, Maximal closure on a graph with resource constraints, Comput. Oper. Res. 24 (10) (1997), pp. 981–990. doi:10.1016/S0305-0548(97)00008-7.
- E. Topal and S. Ramazan, Strategic mine planning model using network flow model and real case application, Int. J. Min. Reclam. Environ. 26 (1) (2012), pp. 29–37. doi:10.1080/17480930.2011.600827.
- K. Dagdelen and T.B. Johnson (1986). Optimum open pit mine production scheduling by lagrangian parameterization, Proceedings 19th International Symposium 1986 - Application of Computers and Operations Research in the Mineral Industry, University Park, PA, pp. 127–142.
- S. Ramazan, (2001). Open pit mine scheduling based on fundamental tree algorithm, PhD thesis, Colorado School of Mines, Golden.
- L. Cacetta and S.P. Hill, An application of branch and cut to open pit mine scheduling, J. Glob. Optim. 27 (2003), pp. 349–365. doi:10.1023/A:1024835022186.
- A. Bley, N. Boland, G. Froyland, and M. Zuckerberg (2012). Solving mixed integer nonlinear programming problems for mine production planning with stockpiling. Technical Report 2009/21, Institute of Mathematics, TU Berlin.
- M. Vallee, Mineral resource + engineering, economic and legal feasibility = ore reserve, CIM Bull. 93 (2000), pp. 53–61.
- C. Baker and S. Giacomo (1998). Resource and reserves: Their uses and abuses by the equity markets. In proceedings, Ore reserves and finance: a joint seminar between Australasian Institute of Mining and Metallurgy and ASX. Sydney.
- M. Rossi and C.V. Deutsch, Mineral Resource Estimation, Springer, Dordrecht, 2014.
- P. Goovaerts, Geostatistics for Natural Resources Evaluation, Oxford University Press, New York, 1997.
- M. David, Advanced Applied Geostatistical Ore Reserve Estimation, Elsevier, Amsterdam, 1988.
- I. Minniakhmetov, R. Dimitrakopoulos, and M. Godoy, High-order spatial simulation using Legendre-like orthogonal splines, Math. Geosci. 50, 7 (2018), pp. 753–780. doi:10.1007/s11004-018-9741-2.
- R. Nussbaumer, G. Mariethoz, E. Gloaguen, and K. Holliger, Which path to choose in sequential Gaussian simulation, Math. Geosci. 50, 1 (2018), pp. 97–120. doi:10.1007/s11004-017-9699-5
- A.G. Journel and C.J. Huijbregts, Mining Geostatistics, Academic Press, London, 1978, pp. 600 p.
- R. Dimitrakopoulos, C. Farrelly, and M. Godoy, Moving forward from traditional optimisation: Grade uncertainty and risk effects in open pit mine design, Trans. IMM, Sec. A Min. Ind. 111 (2002), pp. A82–A89.
- P. Ravenscroft, Risk analysis for mine scheduling by conditional simulation, Trans. Inst. Min. Metall. 101 (1992), pp. 104–108.
- P. Dowd, Risk in minerals projects: Perception, analysis and management, Trans. Inst. Min. Metall. 106 (1997), pp. 9–18.
- J.R. Birge and F. Louveaux, Introduction to Stochastic Programming, 2nd ed., Springer, New York, NY, 2011.
- S. Ramazan and R. Dimitrakopoulos, Production scheduling with uncertain supply: A new solution to the open pit mining problem, Optim. Eng. 14 (2) (2013), pp. 361–380. doi:10.1007/s11081-012-9186-2.
- S. Ramazan and R. Dimitrakopoulos, Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, in Orebody Modelling and Strategic Mine Planning Vol. 14, 2nd ed., AusIMM Spectrum Series, 2007, Melbourne, Australia, pp. 359–365.
- R. Dimitrakopoulos and S. Ramazan, Uncertainty-based production scheduling in open pit mining, SME Trans. 316 (2004), pp. 106–112.
- R. Dimitrakopoulos and S. Ramazan, Stochastic integer programming for optimizing long-term production schedules of open pit mines: Methods, application and value of stochastic solutions, Min. Techno. 117, 4 (2008), pp. 155–160. doi:10.1179/174328609X417279.
- A. Lamghari and R. Dimitrakopoulos, A diversified Tabu search for the open-pit mine production scheduling problem with metal uncertainty, Eur. J. Oper. Res. 222 (3) (2013), pp. 642–652. doi:10.1016/j.ejor.2012.05.029.
- F. Glover and M. Laguna, Tabu Search. In: Du DZ., Pardalos P.M. (eds) Handbook of Combinatorial Optimization. Springer, Boston, MA, (1998), pp. 2093–2229.
- A. Lamghari, R. Dimitrakopoulos, and J.A. Ferland, A variable neighborhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty, J. Oper. Res. Soc. 65 (2014), pp. 1305–1314. doi:10.1057/jors.2013.81.
- J. Jin, T.G. Crainic, and A. Løkketangen, A parallel multi-neighbourhood cooperative tabu search for capacitated vehicle routing problems, Eur. J. Oper. Res. 222 (3) (2012), pp. 441–451. doi:10.1016/j.ejor.2012.05.025.
- P. Toth and D. Vigo, The granular tabu search and its application to the vehicle-routing problem, INFORMS J. Comput. 15 (4) (2003), pp. 333–346. doi:10.1287/ijoc.15.4.333.24890.
- Q. Wu, J.K. Hao, and F. Glover, Multi-neighbourhood Tabu search for the maximum weight clique problem, Ann. Oper. Res. 196 (1) (2012), pp. 611–634. doi:10.1007/s10479-012-1124-3.
- R. Goodfellow and R. Dimitrakopoulos, Simultaneous stochastic optimization of mining complexes and mineral value chains, Math. Geosci. 49 (2017), pp. 341–360. doi:10.1007/s11004-017-9680-3
- L. Montiel and R. Dimitrakopoulos, Simultaneous stochastic optimization of production scheduling at Twin Creeks mining complex, Nevada, Min. Engg. 70 (12) (2018), pp. 48–56. doi:10.19150/me.8645.
- A. Khana and M.W.A. Asad, A method for optimal cut-off grade policy in open pit mining operations under uncertain supply, Resour. Policy. 60 (2019), pp. 178–184. doi:10.1016/j.resourpol.2018.12.00.
- A.D. Ajaka, E. Lilford, and E. Topal, Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty, Resour Policy. 55 (2018), pp. 62–79. doi:10.1016/j.resourpol.2017.10.016.