References
- Cornell, C. A., and S. R. Winterstein. 1988. “Temporal and Magnitude Dependence in Earthquake Recurrence Models.” Bulletin of the Seismological Society of America 78 (4 ): 1522–1537.
- Einstein, H. H., and R. Sousa. 2007. “Warning Systems for Natural Threats.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 1 (1): 3–20. doi:10.1080/17499510601127087.
- Gilbert, R. B., M. Habibi, and N. Min. 2012. “Achieving Reliability in the Face of Extreme Uncertainty.” In Fifth Asian-PACIFIC Symposium on Structural Reliability and its Applications (5APSSRA), edited by K. K. Phoon, M. Beer, S. T. Quek, and S. D. Pang, 1–13. (Keynote Paper).
- Gilbert, R. B., M. Habibi, and F. Nadim. 2016. “Accounting for Unknown Unknowns in Managing Multi-Hazard Risks.” In Multi-hazard Approaches to Civil Infrastructure Engineering, edited by P. Gardoni and J. M. LaFave, 383–412. Cham: Springer International Publishing Switzerland.
- Gilbert, R. B., D. R. Montgomery, J. Wartman, J. R. Keaton, S. Anderson, J. Benoit, and J. delaChapelle. 2016. “Lessons about Managing Landslide Risk from the 2014 Oso, Washington Landslide.” In Fifth International Seminar on Forensic Geotechnical Engineering, International Society of Soil Mechanics and Geotechnical Engineering, 1–11. Bangalore, India: International Society for Soil Mechanics and Geotechnical Engineering (ISSMGE).
- Haugerud, R. A. 2014. Preliminary Interpretation of Pre-2014 Landslide Deposits in the Vicinity of Oso, Washington. Reston: U.S. Geological Survey Open-File Report 2014-1065, U.S. Geological Survey.
- Iverson, R. M., and D. L. George. 2016. “Modelling Landslide Liquefaction, Mobility Bifurcation and the Dynamics of the 2014 Oso Disaster.” Géotechnique 66 (3): 175–187. doi:10.1680/jgeot.15.LM.004.
- Keaton, J. R., J. Wartman, S. Anderson, J. Benoit, J. deLaChapelle, R. B. Gilbert, and D. R. Montgomery. 2014. The 22 March 2014 Oso Landslide, Snohomish County, Washington. Oso, WA: Geotechnical Extreme Events Reconnaissance (GEER), National Science Foundation.
- Liu, Z., F. Nadim, A. Garcia-Aristizabal, A. Mignan, K. Fleming, and B. Q. Luna. 2015. “A Three-Level Framework for Multi-Risk Assessment.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 9 (2): 59–74. doi:10.1080/17499518.2015.1041989.
- Medina-Cetina, Z., and F. Nadim. 2008. “Stochastic Design of an Early Warning System.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 2 (4): 223–236. doi:10.1080/17499510802086777.
- Mostofi, A. 2018. “Development of a New Decision-Based Framework for Risk Assessment and Management of Landslides.” (PhD Dissertation). The University of Texas at Austin.
- Nadim, F., and Z. Q. Liu. 2013. “Quantitative Risk Assessment for Earthquake-Triggered Landslides Using Bayesian Network.” Proccedings of 18th International conference on soil Mechanics and Geotechnical engineering, Paris.
- Rodríguez-Ochoa, R., F. Nadim, J. M. Cepeda, M. A. Hicks, and Z. Liu. 2015. “Hazard Analysis of Seismic Submarine Slope Instability.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 9 (3): 128–147. doi:10.1080/17499518.2015.1051546.
- Shannon, C. E. 1948. “A Mathematical Theory of Communication.” Bell System Technical Journal 27: 379–423. doi: 10.1002/j.1538-7305.1948.tb01338.x
- Stark, T. D., A. K. Baghdady, O. Hungr, and J. Aaron. 2017. “Case Study: Oso, Washington, Landslide of March 22, 2014—Material Properties and Failure Mechanism.” Journal of Geotechnical and Geoenvironmental Engineering 143 (5), 05017001-pp1-13. https://ascelibrary.org/doi/10.1061/%28ASCE%29GT.1943-5606.0001615. doi: 10.1061/(ASCE)GT.1943-5606.0001615
- Wartman, J., D. R. Montgomery, S. A. Anderson, J. R. Keaton, J. Benoit, J. dela Chapelle, and R. B. Gilbert. 2016. “The 22 March 2014 Oso Landslide, Washington, USA.” Geomorphology 253: 275–288. doi:10.1016/j.geomorph.2015.10.022.
- Zhang, J., and W. H. Tang. 2009. “Study of Time-Dependent Reliability of Old Man-Made Slopes Considering Model Uncertainty.” Georisk: Assessment and Management of Risk for Engineered Systems and Geohazards 3 (2): 106–113. doi:10.1080/17499510802571851.