References
- Banerjee, A. (1986). A joint economic lot size model for purchaser and vendor. Decision Sciences, 17, 292–311. Retrieved from http://dx.doi.org/10.1111/j.1540-5915.1986.tb00228.x
- Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92, 75–80.
- Cachon, G., & Lariviere, M. A. (2005). Supply chain coordination with revenue sharing contracts: Strength and limitations. Management Science, 51, 30–44.
- Chan, C. K., & Kingsman, B. G. (2007). Coordination in a single-vendor multi-buyer supply chain by synchronizing delivery and production cycles. Transportation Research Part E, 43, 90–111.
- Giri, B. C., & Maiti, T. (2014). Service competition in a supply chain with two retailers under service level sensitive retail price and demand. International Journal of Management Science and Engineering Management, 9, 133–146. Retrieved from http://dx.doi.org/10.1080/17509653.2013.868079
- Govindan, K. (2015). The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory. European Journal of Operational Research, 242, 402–423.
- Goyal, S. K. (1976). An integrated inventory model for a single-supplier single-customer problem. International Journal of Production Research, 15, 107–111.
- Goyal, S. K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19, 236–241.
- Goyal, S. K. (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82, 209–210.
- Güler Güray, M., & Bilgiç, T. (2009). On coordinating an assembly system under random yield and random demand. European Journal of Operational Research, 196, 342–350. Retrieved from http://dx.doi.org/10.1016/j.ejor.2008.03.002
- Güler Güray, M., & Keskın, M. E. (2013). On coordination under random yield and random demand. Expert Systems with Applications, 40, 3688–3695. Retrieved from http://dx.doi.org/10.1016/j.eswa.2012.12.073
- He, Y., Zaho, X., Zaho, L., & He, J. (2009). Coordinating a supply chain with effort and price dependent stochastic demand. Applied Mathematical Modeling, 33, 2771–2790.
- Hill, R. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal Production Research, 37, 2463–2475.
- Hu, F., Lim, C. C., & Lu, Z. (2013). Coordination of supply chains with a flexible ordering policy under yield and demand uncertainty. International Journal of Production Economics, 146, 686–693.
- Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.
- Inderfurth, K., & Vogelgesang, S. (2013). Concepts for safety stock determination under stochastic demand and different types of random production yield. European Journal of Operational Research, 224, 293–301.
- Jena, S. K., & Sarmah, S. P. (2016). Price and service co-opetition under uncertain demand and condition of used items in a remanufacturing system. International Journal of Production Economics, 173, 1–21.
- Karlin, S. (1958). One stage models with uncertainty. In K. Arrow, S. Karlin, & H. Scarf (Eds.), Studies in the mathematical theory of inventory and production (pp. 109–134). Stanford, CA: Stanford University Press.
- Li, X., Li, Y., & Cai, X. (2012). A note on the random yield from the perspective of the supply chain. Omega, 40, 601–610.
- Li, X., Li, Y., & Cai, X. (2015). Remanufacturing and pricing decisions with random yield and random demand. Computers & Operations Research, 54, 195–203.
- Lodree, E. J. (2007). Advanced supply chain planning with mixtures of back-orders, lost sales, and lost contract. European Journal of Operational Research, 181, 168–183.
- Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.
- Meena, P. L., & Sarmah, S. P. (2014). Mitigating the risks of supply disruption under stochastic demand. International Journal of Management Science and Engineering Management, 9, 157–168.
- Noori, A. H., & Keller, G. (1986). The lot-size reorder model with upstream-downstream uncertainty. Decision Sciences, 17, 285–291.
- Shah, N. H., & Gor, A. S. (2009). An integrated economic lot-size model for vendor-buyer inventory system when input is random. Mathematical and Computer Modeling, 49, 1326–1330.
- Shiah, W. (1980). Optimal inventory policies when stock outs result from defective products. International Journal of Production Research, 18(6), 677–685.
- Wang, X. (2009). Optimization of a 2-stage series inventory system with stochastic demand and endogenous lead time uncertainty. Proceedings of the IEEE/INFORMS International Conference on Service Operations, Logistics and Informatics (SOLI ’09), 22--24 July 2009, Chicago, IL (pp. 508-512). Retrieved from http://dx.doi.org/10.1109/SOLI.2009.5203986
- Wang, Y., Wang, Y., & Gerchak, Y. (2000). Input control in a batch production system with lead times, due dates and random yields. European Journal of Operational Research, 126, 371–385. Retrieved from http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00295-7
- White, J. A. (1970). On absorbing Markov chains and optimum batch production quantities. AIIE Transactions, 2, 82–88.
- Yano, C. A., & Lee, H. U. (1995). Lot-sizing with random yields: A review. Operations Research, 43, 311–334.
- Yin, Z., & Ma, S. (2015). Incentives to improve the service level in a random yield supply chain: The role of bonus contracts. European Journal of Operational Research, 244, 778–791.