213
Views
4
CrossRef citations to date
0
Altmetric
Original Articles

Uncertain production scheduling optimization in open-pit mines and its ellipsoidal robust counterpart

, , & ORCID Icon
Pages 245-253 | Received 10 Nov 2016, Accepted 12 Nov 2017, Published online: 29 Jan 2018

References

  • Albor Consuegra, F., & Dimitrakopoulos, R. (2009). Stochastic mine design optimisation based on simulated annealing: Pit limits, production schedules, multiple orebody scenarios and sensitivity analysis. Mining Technology, 118(2), 79–90.10.1179/037178409X12541250836860
  • Alipour, A., Khodaiari, A. A., Jafari, A., & Tavakkoli-Moghaddam, R. (2017). Robust production scheduling in open-pit mining under uncertainty: A box counterpart approach. Journal of Mining and Environment, 8(2), 255–267. doi:10.22044/jme.2017.849
  • Averbakh, I. (2000). Minmax regret solutions for minimax optimization problems with uncertainty. Operations Research Letters, 27(2), 57–65.10.1016/S0167-6377(00)00025-0
  • Bertsimas, D., & Sim, M. (2003). Robust discrete optimization and network flows. Mathematical Programming, 98(1-3), 49–71.10.1007/s10107-003-0396-4
  • Bertsimas, D., & Sim, M. (2004). The price of robustness. Operations Research, 52(1), 35–53.10.1287/opre.1030.0065
  • Chen, W., Sim, M., Sun, J., & Teo, C.-P. (2010). From CVaR to uncertainty set: Implications in joint chance-constrained optimization. Operations Research, 58(2), 470–485.10.1287/opre.1090.0712
  • Espinoza Daniel, G. M., Eduardo, M., Gonzalo, M., & Maurice, Q. (2013, November). Open pit mine scheduling under uncertainty: A robust approach. Proceedings of APCOM, Applications of Computers and Operations Research in the Mineral Industry (pp. 433–444). Porte Alegre: Fundação Luiz Englert.
  • Ghaoui, L. E., Oks, M., & Oustry, F. (2003). Worst-case value-at-risk and robust portfolio optimization: A conic programming approach. Operations Research, 51(4), 543–556.10.1287/opre.51.4.543.16101
  • Hustrulid, W. A., Kuchta, M., & Martin, R. K. (2013). Open pit mine planning and design, two volume set & CD-ROM pack. CRC Press.
  • Janak, S. L., Lin, X., & Floudas, C. A. (2007). A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution. Computers & Chemical Engineering, 31(3), 171–195.10.1016/j.compchemeng.2006.05.035
  • Kumral, M. (2010). Robust stochastic mine production scheduling. Engineering Optimization, 42(6), 567–579.10.1080/03052150903353336
  • Lagos, G., Espinoza, D., Moreno, E., & Amaya, J. (2011). Robust planning for an open-pit mining problem under ore-grade uncertainty. Electronic Notes in Discrete Mathematics, 37, 15–20.10.1016/j.endm.2011.05.004
  • Lamghari, A., & Dimitrakopoulos, R. (2012). A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty. European Journal of Operational Research, 222(3), 642–652.10.1016/j.ejor.2012.05.029
  • Li, Z., Ding, R., & Floudas, C. A. (2011). A comparative theoretical and computational study on robust counterpart optimization: I. Robust linear optimization and robust mixed integer linear optimization. Industrial & Engineering Chemistry Research, 50(18), 10567–10603.10.1021/ie200150p
  • Li, Z., & Floudas, C. A. (2012). Robust counterpart optimization: Uncertainty sets, formulations and probabilistic guarantees. Proceedings of the 6th conference on foundations of computer-aided process operations, Savannah (Georgia).
  • Lin, X., Janak, S. L., & Floudas, C. A. (2004). A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Computers & Chemical Engineering, 28(6-7), 1069–1085.10.1016/j.compchemeng.2003.09.020
  • Mokhtarian Asl, M., & Sattarvand, J. (2016). Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method. Journal of Mining and Environment, 7(2), 215–227.
  • Mulvey, J. M., Vanderbei, R. J., & Zenios, S. A. (1995). Robust optimization of large-scale systems. Operations Research, 43(2), 264–281.10.1287/opre.43.2.264
  • Ramazan, S., & Dimitrakopoulos, R. (2007). Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation. Orebody Modelling and Strategic Mine Planning, Spectrum Series, 14, 359–365.
  • Sabour, S. A., & Dimitrakopoulos, R. (2011). Incorporating geological and market uncertainties and operational flexibility into open pit mine design. Journal of Mining Science, 47(2), 191–201.10.1134/S1062739147020067
  • Soyster, A. L. (1973). Technical note—Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations Research, 21(5), 1154–1157.10.1287/opre.21.5.1154
  • Verderame, P. M., & Floudas, C. A. (2009). Operational planning of large-scale industrial batch plants under demand due date and amount uncertainty: II. Conditional value-at-risk framework. Industrial & Engineering Chemistry Research, 49(1), 260–275.
  • Yu, C.-S., & Li, H.-L. (2000). A robust optimization model for stochastic logistic problems. International Journal of Production Economics, 64(1–3), 385–397.10.1016/S0925-5273(99)00074-2

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.