178
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

A heuristic for the multi-level capacitated lot sizing problem with inventory constraints

Pages 240-252 | Received 26 Apr 2018, Accepted 30 Nov 2018, Published online: 18 Feb 2019

References

  • Afentakis, P., Gavish, B., & Karmarkar, U. (1984). Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems. Management Science, 30, 222–239.
  • Akbalik, A., Kebe, S., Penz, B., & Sbihi, N. (2008). Exact methods and a heuristic for the optimization of an integrated replenishment-storage planning problem. International Transactions in Operational Research, 15, 195–214.
  • Akbalik, A., Penz, B., & Rapine, C. (2015). Capacitated lot sizing problems with inventory bounds. Annals of Operations Research, 229, 1–18.
  • Billington, P. J., McClain, J. O., & Thomas, L. J. (1983). Mathematical programming approaches to capacity-constrained MRP systems: Review, formulation and problem reduction. Management Science, 29, 1126–1141.
  • Brahimi, N., Absi, N., Dauzère-Pérès, S., & Kedad-Sidhoum, S. (2015). Models and lagrangian heuristics for a two-level lot-sizing problem with bounded inventory. OR Spectrum, 37, 983–1006.
  • Buschkühl, L., Sahling, F., Helber, S., & Tempelmeier, H. (2010). Dynamic capacitated lot-sizing problems: A classification and review of solution approaches. OR Spectrum, 32, 231–261.
  • Chen, W. H., & Thizy, J. M. (1990). Analysis of relaxations for the multi-item capacitated lot-sizing problem. Annals of Operations Research, 26, 29–72.
  • Clark, A. R., & Armentano, V. A. (1993). Echelon stock formulations for multi-stage lot-sizing with lead times. International Journal of Systems Science, 24, 1759–1775.
  • Clark, A. R., & Armentano, V. A. (1995). A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times. Journal of the Operational Research Society, 46, 1208–1222.
  • França, P. M., Armentano, V. A., Berretta, R. E., & Clark, A. R. (1997). A heuristic method for lot-sizing in multi-stage systems. Computers & Operations Research, 24, 861–874.
  • Lang, J. C. (2010). Production and inventory management with substitutions. Lecture notes in economics and mathematical systems: (Vol. 636). Berlin: Springer.
  • Melo, R. A., & Ribeiro, C. C. (2017). Formulations and heuristics for the multi-item uncapacitated lot-sizing problem with inventory bounds. International Journal of Production Research, 55, 576–592.
  • Meyr, H. (2004). Simultane Losgrößen- und Reihenfolgeplanung bei mehrstufiger kontinuierlicher Fertigung [Simultaneous lot-sizing and sequencing for multi-level continuous manufacturing]. Zeitschrift für Betriebswirtschaft, 74, 585–610.
  • Phouratsamay, S.-L., Kedad-Sidhoum, S., & Pascual, F. (2018). Two-level lot-sizing with inventory bounds. Discrete Optimization, 30, 1–19. Advance online publication.
  • Schwarz, L. B., & Schrage, L. (1975). Optimal and system myopic policies for multi-echelon production/inventory assembly systems. Management Science, 21, 1285–1294.
  • Silver, E. A., & Meal, H. C. (1973). A heuristic for selecting lot size quantities for the case of a deterministic timevarying demand rate and discrete opportunities for replenishment. Production and Inventory Management Journal, 14, 64–74.
  • Stadtler, H. (1996). Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lot sizing. European Journal of Operational Research, 94, 561–581.
  • Stadtler, H., & Sürie, C. (2000). Description of MLCLSP test instances. Technical Report, Technische Universität Darmstadt. Retrieved from https://www.yumpu.com/en/document/view/49317722/pdf-format-120kb-technische-universitat-darmstadt
  • Tempelmeier, H., & Derstroff, M. (1993). Mehrstufige Mehrprodukt-Losgrößenplanung bei beschränkten Ressourcen und genereller Erzeugnisstruktur [Multi-level multi-product lot-sizing with constrained resources and general product structure]. OR Spektrum, 15, 63–73.
  • Tempelmeier, H., & Derstroff, M. (1996). A Lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times. Management Science, 42, 738–757.
  • Wagner, H. M., & Whitin, T. M. (1958). Dynamic version of the economic lot size model. Management Science, 5, 89–96.
  • Witt, A., & Voß, S. (2011). Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software. European Journal of Industrial Engineering, 5, 81–100.
  • Wolsey, L. A. (2006). Lot-sizing with production and delivery time windows. Mathematical Programming Series A, 107, 471–489.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.