804
Views
39
CrossRef citations to date
0
Altmetric
Original Articles

Big data driven cycle time parallel prediction for production planning in wafer manufacturing

ORCID Icon, , ORCID Icon, &
Pages 714-732 | Received 20 Jul 2017, Accepted 07 Mar 2018, Published online: 21 Mar 2018

References

  • Bi, Z. 2017. Embracing Internet of Things (Iot) and Big Data for Industrial Informatics. Enterprise Information Systems 11: 949–951. August 9.
  • Bitam, S., S. Zeadally, and A. Mellouk. 2017. “Fog Computing Job Scheduling Optimization Based on Bees Swarm.” Enterprise Information Systems 12(4):373-397.
  • Cai, M., Y. Lin, B. Han, C. Liu, and W. Zhang. 2016. “On a Simple and Efficient Approach to Probability Distribution Function Aggregation.” IEEE Transactions on Systems Man & Cybernetics Systems 1–100. doi:10.1109/TSMC.2016.2531647.
  • Chang, P. C., and T. W. Liao. 2006. “Combining SOM and Fuzzy Rule Base for Flow Time Prediction in Semiconductor Manufacturing Factory.” Applied Soft Computing 6: 198–206. doi:10.1016/j.asoc.2004.12.004.
  • Chen, C. Y. J., E. I. George, and V. Tardif. 2001. “A Bayesian Model of Cycle Time Prediction.” IIE Transactions 33: 921–930. doi:10.1080/07408170108936884.
  • Chen, T. 2003. “A Fuzzy Back Propagation Network for Output Time Prediction in A Wafer Fab.” Applied Soft Computing 2: 211–222. January 1. doi:10.1016/S1568-4946(02)00066-2.
  • Chen, T. 2011. “Forecasting Job Cycle Time in a Wafer Fabrication Factory by the FPCA-FBPN Approach.” International Review on Computers & Software 6: 1050–1054.
  • Chen, T. 2013. “An Effective Fuzzy Collaborative Forecasting Approach for Predicting the Job Cycle Time in Wafer Fabrication.” Computers & Industrial Engineering 66: 834–848. doi:10.1016/j.cie.2013.09.010.
  • Chen, T. 2016. “Estimating Job Cycle Time in A Wafer Fabrication Factory: A Novel and Effective Approach Based on Post-Classification.” Applied Soft Computing 40: 558–568. doi:10.1016/j.asoc.2015.12.017.
  • Chen, T., H. Wu, and Y. Wang. 2009. “Fuzzy-Neural Approaches with Example Post-Classification for Estimating Job Cycle Time in a Wafer Fab.” Applied Soft Computing 9: 1225–1231. doi:10.1016/j.asoc.2009.03.006.
  • Chen, T., and L. Yu-Cheng. 2009. “A Fuzzy Back Propagation Network Ensemble with Example Classification for Lot Output Time Prediction in A Wafer Fab.” Applied Soft Computing 9: 658–666. doi:10.1016/j.asoc.2008.04.018.
  • Chung, S., and H. Huang. 2002. “Cycle Time Estimation for Wafer Fab with Engineering Lots.” IIE Transactions 34: 105–118. doi:10.1080/07408170208928854.
  • Farber, P., and K. Asanovic. 1997. “Parallel Neural Network Training on Multi-Spert.” In: 3rd International Conference on Algorithms and Architectures for Parallel Processing, Victoria, Australia, 659–666. doi:10.1109/ICAPP.1997.651531
  • Ghaisari, J., H. Jannesari, and M. Vatani. 2012. “Artificial Neural Network Predictors for Mechanical Properties of Cold Rolling Products.” Advances in Engineering Software 45: 91–99. doi:10.1016/j.advengsoft.2011.09.016.
  • Hsieh, L. Y., K. Chang, and C. Chien. 2013. “Efficient Development of Cycle Time Response Surfaces Using Progressive Simulation Metamodeling.” International Journal of Production Research 52: 3097–3109. December 5. doi:10.1080/00207543.2013.864055.
  • Kusiak, A., and G. Xu. 2012. “Modeling and Optimization of HVAC Systems Using a Dynamic Neural Network.” Energy 42: 241–250. doi:10.1016/j.energy.2012.03.063.
  • Lati, N., and I. Gilad. 2010. “Minimising Idle Times in Cluster Tools in the Semiconductor Industry.” International Journal of Production Research 48: 6443–6459. doi:10.1080/00207540903280556.
  • Liu, Z., H. Li, and G. Miao. 2010. “MapReduce-based Backpropagation Neural Network over Large Scale Mobile Data.” In: Natural Computation (ICNC), 2010 Sixth International Conference On,  Yantai, China,1726–1730. doi:10.1109/ICNC.2010.5584323
  • Long, H., L. Wang, Z. Zhang, Z. Song, and J. Xu. 2015. “Data-Driven Wind Turbine Power Generation Performance Monitoring.” IEEE Transactions on Industrial Electronics 62: 6627–6635. doi:10.1109/TIE.2015.2447508.
  • Niros, A. D., and G. E. Tsekouras. 2012. “A Novel Training Algorithm for RBF Neural Network Using A Hybrid Fuzzy Clustering Approach.” Fuzzy Sets and Systems 193: 62–84. doi:10.1016/j.fss.2011.08.011.
  • Odersky, M., P. Altherr, V. Cremet, B. Emir, S. Maneth, S. Micheloud, N. Mihaylov, M. Schinz, E. Stenman, and M. Zenger. 2006. “An Overview of the Scala Programming Language.” École Polytechnique Fédérale de Lausanne (EPFL), Lausanne, Switzerland. https://infoscience.epfl.ch//record/52656
  • Oh, S. K., W. D. Kim, W. Pedrycz, and S. C. Joo. 2012. “Design of K-Means Clustering-Based Polynomial Radial Basis Function Neural Networks (Prbf NNs) Realized with the Aid of Particle Swarm Optimization and Differential Evolution.” Neurocomputing 78: 121–132. doi:10.1016/j.neucom.2011.06.031.
  • Papadimitriou, S., and J. Sun. 2009. “DisCo: Distributed Co-Clustering with Map-Reduce: A Case Study Towards Petabyte-Scale End-to-End Mining.” In: Eighth IEEE International Conference on Data Mining, Libraries Australia, 512–521. doi: 10.1109/ICDM.2008.142
  • Pearn, W. L., Y. Tai, and J. H. Lee. 2009. “Statistical Approach for Cycle Time Estimation in Semiconductor Packaging Factories.” IEEE Transactions on Electronics Packaging Manufacturing 32: 198–205. doi:10.1109/TEPM.2009.2022270.
  • Priebe, T., and G. Pernul. 2001. A Pragmatic Approach to Conceptual Modeling of OLAP Security.  Yokohama: Springer Berlin Heidelberg. doi:10.1007/3-540-45581-7_24
  • Qin, W., J. Zhang, and Y. Sun. 2013. “Multiple-Objective Scheduling for Interbay AMHS by Using Genetic-Programming-Based Composite Dispatching Rules Generator.” Computers in Industry 64: 694–707. doi:10.1016/j.compind.2013.03.009.
  • Rodriguez, A., and A. Laio. 2014. “Clustering by Fast Search and Find of Density Peaks.” Science 344: 1492–1496. June 27. doi:10.1126/science.1242072.
  • Rogers, R. O., and D. B. Skillicorn. 1998. “Using the BSP Cost Model to Optimise Parallel Neural Network Training.” Future Generation Computer Systems 14: 409–424. doi:10.1016/S0167-739X(98)00043-0.
  • Sha, D. Y., and S. Y. Hsu. 2004. “Due-Date Assignment in Wafer Fabrication Using Artificial Neural Networks.” The International Journal of Advanced Manufacturing Technology 23: 768–775. May 1. doi:10.1007/s00170-003-1644-8.
  • Sha, D. Y., R. L. Storch, and C. H. Liu. 2007. “Development of a Regression-Based Method with Case-Based Tuning to Solve the Due Date Assignment Problem.” International Journal of Production Research 45: 65–82. doi:10.1080/00207540500507435.
  • Shahrivari, S., and S. Jalili. 2016. “Single-Pass and Linear-Time K-Means Clustering Based on MapReduce.” Information Systems 60: 1–12. doi:10.1016/j.is.2016.02.007.
  • Sierra-Canto, X., F. Madera-Ramirez, and V. Uc-Cetina. 2010. “Parallel Training of a Back-Propagation Neural Network Using CUDA.” In: Ninth International Conference on Machine Learning and Applications (ICMLA), Washington, D.C., USA, 307–312. doi:10.1109/ICMLA.2010.52
  • Staiano, A., R. Tagliaferri, and W. Pedrycz. 2006. “Improving RBF Networks Performance in Regression Tasks by Means of a Supervised Fuzzy Clustering.” Neurocomputing 69: 1570–1581. doi:10.1016/j.neucom.2005.06.014.
  • Tai, Y. T., W. L. Pearn, and J. H. Lee. 2012. “Cycle Time Estimation for Semiconductor Final Testing Processes with Weibull-Distributed Waiting Time.” International Journal of Production Research 50: 581–592. doi:10.1080/00207543.2010.543938.
  • Tirkel, I. 2013. “Forecasting Flow Time in Semiconductor Manufacturing Using Knowledge Discovery in Databases.” International Journal of Production Research 51: 5536–5548. doi:10.1080/00207543.2013.787168.
  • Tsekouras, G. E., A. Manousakis, C. Vasilakos, and K. Kalabokidis. 2015. “Improving the Effect of Fuzzy Clustering on RBF Network’s Performance in Terms of Particle Swarm Optimization.” Advances in Engineering Software 82: 25–37. doi:10.1016/j.advengsoft.2014.12.004.
  • UCI. 2016. “USA, UCI Machine Learning Repository.” http://archive.ics.uci.edu/ml/index.html
  • Upadhyaya, S. R. 2013. “Parallel Approaches to Machine learning—A Comprehensive Survey.” Journal of Parallel and Distributed Computing 73: 284–292. doi:10.1016/j.jpdc.2012.11.001.
  • Wa, K., D. Ea, W. Dp, and Z. Je. 1985. “APACHE II: A Severity of Disease Classification System.” Critical Care Medicine 13: 818. doi:10.1097/00003246-198510000-00009.
  • Wang, H., C. Chien, and M. Gen. 2015. “An Algorithm of Multi-Subpopulation Parameters with Hybrid Estimation of Distribution for Semiconductor Scheduling with Constrained Waiting Time.” IEEE Transactions on Semiconductor Manufacturing 28: 353–366. doi:10.1109/TSM.2015.2439054.
  • Wang, H., Y. Fu, M. Huang, and J. Wang. 2016a. “Multiobjective Optimisation Design for Enterprise System Operation in the Case of Scheduling Problem with Deteriorating Jobs.” Enterprise Information Systems 10: 268–285. doi:10.1080/17517575.2015.1078913.
  • Wang, J., and J. Zhang. 2016. “Big Data Analytics for Forecasting Cycle Time in Semiconductor Wafer Fabrication System.” International Journal of Production Research 54: 7231–7244. doi:10.1080/00207543.2016.1174789.
  • Wang, J., J. Zhang, and X. Wang. 2017. “A Two-Dimensional Long-Short-Term Memory Model with Multiply Memory Units for Short-Term Cycle Time Forecasting in Re-Entrant Manufacturing Systems.” IEEE Transactions on Industrial Informatics 14(2): 748-758.
  • Wang, J., J. Zhang, and X. Wang. 2018. “A Data Driven Cycle Time Prediction with Feature Selection in A Semiconductor Wafer Fabrication System.” IEEE Transactions on Semiconductor Manufacturing 31: 173–182. January 1. doi:10.1109/TSM.2017.2788501.
  • Wang, J. W., H. F. Wang, J. L. Ding, K. Furuta, T. Kanno, W. H. Ip, and W. J. Zhang. 2016b. “On Domain Modelling of the Service System with Its Application to Enterprise Information Systems.” Enterprise Information Systems 10: 1–16. doi:10.1080/17517575.2013.810784.
  • Wein, L. M. 1988. “Scheduling Semiconductor Wafer Fabrication.” IEEE Transactions on Semiconductor Manufacturing 1: 115–130. doi:10.1109/66.4384.
  • Wu, S. L., L. Xu, and W. He. 2009. “Industry-Oriented Enterprise Resource Planning.” Enterprise Information Systems 3: 409–424. doi:10.1080/17517570903100511.
  • Yang, F., B. E. Ankenman, and B. L. Nelson. 2008. “Estimating Cycle Time Percentile Curves for Manufacturing Systems via Simulation.” INFORMS Journal on Computing 20: 628–643. doi:10.1287/ijoc.1080.0272.
  • Yavuz, B., B. Yavuz, B. Yavuz, E. Sparks, D. Liu, D. Liu, S. Owen, S. Owen, S. Owen, and S. Owen. 2016. “MLlib: Machine Learning in Apache Spark.” Journal of Machine Learning Research 17: 1235–1241.
  • You, Z., J. Yu, L. Zhu, S. Li, and Z. Wen. 2014. “A MapReduce Based Parallel SVM for Large-Scale Predicting Protein–Protein Interactions.” Neurocomputing 145: 37–43. doi:10.1016/j.neucom.2014.05.072.
  • Zhang, W. J., and Y. Lin. 2010. “On the Principle of Design of Resilient Systems – Application to Enterprise Information Systems.” Enterprise Information Systems 4: 99–110. May 1. doi:10.1080/17517571003763380.
  • Zhang, W. J., and J. W. Wang. 2016. “Design Theory and Methodology for Enterprise Systems.” Enterprise Information Systems 10: 245–248. doi:10.1080/17517575.2015.1080860.
  • Zhao, Y., J. Song, A. Montazeri, M. M. Gupta, Y. Lin, C. Wang, and W. J. Zhang. 2017. “Mining Affective Words to Capture Customer’s Affective Response to Apparel Products.” Textile Research Journal. doi:10.1177/0040517517712092.
  • Zhong, R. Y., G. Q. Huang, S. Lan, Q. Y. Dai, X. Chen, and T. Zhang. 2015. “A Big Data Approach for Logistics Trajectory Discovery from RFID-enabled Production Data.” International Journal of Production Economics 165: 260–272. doi:10.1016/j.ijpe.2015.02.014.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.