686
Views
3
CrossRef citations to date
0
Altmetric
Article

Performance evaluation of the remanufacturing system prone to random failure and repair

&
Pages 33-44 | Received 29 May 2018, Accepted 08 May 2019, Published online: 10 Jun 2019

References

  • Abdul-Kader, W., O. Ganjavi, and F. Baki. 2011. “A Nonlinear Model for Optimizing the Performance of A Multi-Product Production Line.” International Transactions in Operational Research 18 (5): 561–577. doi:10.1111/j.1475-3995.2011.00814.x.
  • Abdul-Kader, W., and A. Gharbi. 2002. “Capacity Estimation of a Multi-Product Unreliable Production Line.” International Journal of Production Research 40 (18): 4815–4834. doi:10.1080/0020754021000024148.
  • Aksoy, H. K., and S. M. Gupta. 2005. “Buffer Allocation Plan for a Remanufacturing Cell.” Computers and Industrial Engineering 48 (3): 657–677. doi:10.1016/j.cie.2003.03.007.
  • Aksoy, H. K., and S. M. Gupta. 2010. “Near Optimal Buffer Allocation in Remanufacturing Systems with N-Policy.” Computers and Industrial Engineering 59 (4): 496–508. doi:10.1016/j.cie.2010.06.004.
  • Aksoy, H. K., and S. M. Gupta. 2011. “Optimal Management of Remanufacturing Systems with Server Vacations.” International Journal of Advanced Manufacturing Technology 54 (9–12): 1199–1218. doi:10.1007/s00170-010-3001-z.
  • Blackburn, J. D., V. D. R. Guide, G. C. Souza, and L. N. Van Wassenhove. 2004. “Reverse Supply Chains for Commercial Returns.” California Management Review 46 (2): 6–22. doi:10.2307/41166207.
  • Buzacott, J. A. 1969. “Methods of Reliability Analysis of Production Systems Subject to Breakdowns.” In Operations Research Proceedings of NATO Conference, Turin, Italy, June 24–July 4, edited by D. Grouchko, 211–232. London: Gordon and Breach Science Publishers.
  • Esmaeilian, B., S. Behdad, and B. Wang. 2016. “The Evolution and Future of Manufacturing: A Review.” Journal of Manufacturing Systems 39: 79–100. doi:10.1016/j.jmsy.2016.03.001.
  • Gershwin, S. B., and J. E. Schor. 2000. “Efficient Algorithms for Buffer Space Allocation.” Annals of Operations Research 93 (1–4): 117–144. doi:10.1023/A:1018988226612.
  • Graham, I., P. Goodall, Y. Peng, C. Palmer, A. West, P. Conway, J. E. Mascolo, and F. U. Dettmer. 2015. “Performance Measurement and KPIs for Remanufacturing.” Journal of Remanufacturing 5 (10): 1–17. doi:10.1186/s13243-015-0019–2.
  • Gu, F. (2018). “Performance Improvement of Remanufacturing Systems Operating under N-Policy” (Master’s thesis), University of Windsor, Canada
  • Guide, V. D. R., G. C. Souza, L. N. Van Wassenhove, and J. D. Blackburn. 2006. “Time Value of Commercial Product Returns.” Management Science 52 (8): 1200–1214. doi:10.1287/mnsc.1060.0522.
  • Jarrahi, F., and W. Abdul-Kader. 2015. “Performance Evaluation of a Multi-Product Production Line: An Approximation Method.” Applied Mathematical Modelling 39 (13): 3619–3636. doi:10.1016/j.apm.2014.11.059.
  • Koren, Y., S. J. Hu, and T. W. Weber. 1998. “Impact of Manufacturing System Configuration on Performance.” CIRP Annals-Manufacturing Technology 47 (1): 369–372. doi:10.1016/S0007-8506(07)62853-4.
  • Meller, R. D., and D. S. Kim. 1996. “The Impact of Preventive Maintenance on System Cost and Buffer Size.” European Journal of Operational Research 95: 577–591. doi:10.1016/0377-2217(95)00313-4.
  • Nahas, N. 2017. “Buffer Allocation and Preventive Maintenance Optimization in Unreliable Production Lines.” Journal of Intelligent Manufacturing 28 (1): 85–93. doi:10.1007/s10845-014-0963-y.
  • Noseworthy, S., and W. Abdul-Kader. 2004. “Impact of Preventive Maintenance on Serial Production Line Performance: A Simulation Approach.” Proceedings of the Administrative Sciences Association of Canada, ASAC 2004 Conference, Production and Operations Management Division, Quebec City, Canada.
  • Radhoui, M., N. Rezg, and A. Chelbi. 2010. “Joint Quality Control and Preventive Maintenance Strategy for Imperfect Production Processes.” Journal of Intelligent Manufacturing 21 (2): 205–212. doi:10.1007/s10845-008-0198-z.
  • Ravi, V., R. Shankar, and M. K. Tiwari. 2005. “Analyzing Alternatives in Reverse Logistics for End-Of-Life Computers: ANP and Balanced Scorecard Approach.” Computers & Industrial Engineering 48 (2): 327–356. doi:10.1016/j.cie.2005.01.017.
  • Savaliya, R. (2017). “Performance Evaluation of Remanufacturing Systems” (Master’s thesis), University of Windsor, Canada
  • Su, C., and A. Xu. 2014. “Buffer Allocation for Hybrid Manufacturing/Remanufacturing System considering Quality Grading.” International Journal of Production Research 52 (5): 1269–1284. doi:10.1080/00207543.2013.828165.
  • Van der Duyn Schouten, F. A., and S. G. Vanneste. 1995. “Maintenance Optimization of a Production System with Buffer Capacity.” European Journal of Operational Research 82 (2): 323–338. doi:10.1016/0377-2217(94)00267-G.
  • Zandieh, M., M. N. Joreir-Ahmadi, and A. Fadaei-Rafsanjani. 2017. “Buffer Allocation Problem and Preventive Maintenance Planning in Non-Homogenous Unreliable Production Lines.” The International Journal of Advanced Manufacturing Technology. doi:10.1007/s00170-016-9744-4.
  • Zequeira, R. I., B. Prida, and J. E. Valdes. 2004. “Optimal Buffer Inventory and Preventive Maintenance for an Imperfect Production Process.” International Journal of Production Research 42 (5): 959–974. doi:10.1080/00207540310001631610.
  • Zequeira, R. I., J. E. Valdes, and C. Berenguer. 2008. “Optimal Buffer Inventory and Opportunistic Preventive Maintenance under Random Production Capacity Availability.” International Journal of Production Economics 111 (2): 686–696. doi:10.1016/j.ijpe.2007.02.037.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.