1,026
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Suppliers portfolio and returner incentive decisions in closed-loop remanufacturing systems under multiple stochastic scenarios

, , &
Pages 208-225 | Received 02 Apr 2022, Accepted 29 Jul 2022, Published online: 12 Aug 2022

References

  • Abdolazimi, O., M. S. Esfandarani, M. Salehi, and D. Shishebori. 2020. “Robust Design of a multi-objective closed-loop Supply Chain by Integrating on-time Delivery, Cost, and Environmental Aspects, Case Study of a Tire Factory.” Journal of Cleaner Production 264: 121566. doi:10.1016/j.jclepro.2020.121566.
  • Agrawal, S., R. K. Singh, and Q. Murtaza. 2015. “A Literature Review and Perspectives in Reverse Logistics.” Resources, Conservation and Recycling 97: 76–92. doi:10.1016/j.resconrec.2015.02.009.
  • Battini, D., M. Bogataj, and A. Choudhary. 2017. “Closed Loop Supply Chain (CLSC): Economics, Modelling, Management and Control.” International Journal of Production Economics 183 (2): 319–321. doi:10.1016/j.ijpe.2016.11.020.
  • Berger, P. D., A. Gerstenfeld, and A. Z. Zeng. 2004. “How Many Suppliers are Best? A Decision Making Approach.” Omega 32 (1): 9–15. doi:10.1016/j.omega.2003.09.001.
  • Bhattacharya, R., A. Kaur, and R. K. Amit. 2018. “Price Optimization of multi-stage Remanufacturing in a Closed Loop Supply Chain.” Journal of Cleaner Production 186: 943–962. doi:10.1016/j.jclepro.2018.02.222.
  • Braz, A. C., A. M. De Mello, L. A. de Vasconcelos Gomes, and P. T. de Souza Nascimento. 2018. “The Bullwhip Effect in closed-loop Supply Chains: A Systematic Literature Review.” Journal of Cleaner Production 202: 376–389. doi:10.1016/j.jclepro.2018.08.042.
  • Chai, J., J. N. Liu, and E. W. Ngai. 2013. “Application of decision-making Techniques in Supplier Selection: A Systematic Review of Literature.” Expert Systems with Applications 40 (10): 3872–3885. doi:10.1016/j.eswa.2012.12.040.
  • Coenen, J., R. E. Van der Heijden, and A. C. van Riel. 2018. “Understanding Approaches to Complexity and Uncertainty in closed-loop Supply Chain Management: Past Findings and Future Directions.” Journal of Cleaner Production 201: 1–13. doi:10.1016/j.jclepro.2018.07.216.
  • Das, D., and P. Dutta. 2016. “Performance Analysis of a closed-loop Supply Chain with incentive-dependent Demand and Return.” The International Journal of Advanced Manufacturing Technology 86 (1–4): 621–639. doi:10.1007/s0017.
  • De Giovanni, P., P. V. Reddy, and G. Zaccour. 2016. “Incentive Strategies for an Optimal Recovery Program in a closed-loop Supply Chain.” European Journal of Operational Research 249 (2): 605–617. doi:10.1016/j.ejor.2015.09.021.
  • De Giovanni, P., and G. Zaccour. 2019. “A Selective Survey of game-theoretic Models of closed-loop Supply Chains.” 4OR- A Quarterly Journal of Operations Research 17 (1): 1–44. 10.1007/s1028
  • Esmaeili-Najafabadi, E., M. S. F. Nezhad, H. Pourmohammadi, M. Honarvar, and M. A. Vahdatzad. 2019. “A Joint Supplier Selection and Order Allocation Model with Disruption Risks in Centralized Supply Chain.” Computers & Industrial Engineering 127: 734–748. doi:10.1016/j.cie.2018.11.017.
  • Fathollahi-Fard, A. M., M. A. Dulebenets, M. Hajiaghaei–Keshteli, R. Tavakkoli-Moghaddam, M. Safaeian, and H. Mirzahosseinian. 2021. “Two Hybrid meta-heuristic Algorithms for a dual-channel closed-loop Supply Chain Network Design Problem in the Tire Industry under Uncertainty.” Advanced Engineering Informatics 50: 101418. doi:10.1016/j.aei.2021.101418.
  • Geißler, B., A. Martin, A. Morsi, and L. Schewe. 2012. “Using Piecewise Linear Functions for Solving MINLPs.” In Mixed Integer Nonlinear Programming, edited by Leyffer Sven and Lee Jon, 287–314. New York, NY: Springer. doi:10.1007/978-1-4614-1927-3_10.
  • Giri, B. C., and S. Sharma. 2016. “Optimal Production Policy for a closed-loop Hybrid System with Uncertain Demand and Return under Supply Disruption.” Journal of Cleaner Production 112: 2015–2028. doi:10.1016/j.jclepro.2015.06.147.
  • Glock, C. H. 2011. “A multiple-vendor single-buyer Integrated Inventory Model with A Variable Number of Vendors.” Computers & Industrial Engineering 60 (1): 173–182. doi:10.1016/j.cie.2010.11.001.
  • Govindan, K., H. Mina, A. Esmaeili, and S. M. Gholami-Zanjani. 2020. “An Integrated Hybrid Approach for Circular Supplier Selection and Closed Loop Supply Chain Network Design under Uncertainty.” Journal of Cleaner Production 242: 118317. doi:10.1016/j.jclepro.2019.118317.
  • Govindan, K., and H. Soleimani. 2017. “A Review of Reverse Logistics and closed-loop Supply Chains: A Journal of Cleaner Production Focus.” Journal of Cleaner Production 142: 371–384. doi:10.1016/j.jclepro.2016.03.126.
  • Govindan, K., H. Soleimani, and D. Kannan. 2015. “Reverse Logistics and closed-loop Supply Chain: A Comprehensive Review to Explore the Future.” European Journal of Operational Research 240 (3): 603–626. doi:10.1016/j.ejor.2014.07.012.
  • Guide, V. D. R., Jr, R. H. Teunter, and L. N. Van Wassenhove. 2003. “Matching Demand and Supply to Maximize Profits from Remanufacturing.” Manufacturing & Service Operations Management 5 (4): 303–316. doi:10.1287/msom.5.4.303.24883.
  • He, Y. 2015. “Acquisition Pricing and Remanufacturing Decisions in a closed-loop Supply Chain.” International Journal of Production Economics 163: 48–60. doi:10.1016/j.ijpe.2015.02.002.
  • Hosoda, T., and S. M. Disney. 2018. “A Unified Theory of the Dynamics of closed-loop Supply Chains.” European Journal of Operational Research 269 (1): 313–326. doi:10.1016/j.ejor.2017.07.020.
  • Hosseini-Motlagh, S. M., M. Nouri-Harzvili, M. Johari, and B. R. Sarker. 2020. “Coordinating Economic Incentives, Customer Service and Pricing Decisions in a Competitive closed-loop Supply Chain.” Journal of Cleaner Production 255: 120241. doi:10.1016/j.jclepro.2020.120241.
  • Hosseini, S., N. Morshedlou, D. Ivanov, M. D. Sarder, K. Barker, and A. Al Khaled. 2019. “Resilient Supplier Selection and Optimal Order Allocation under Disruption Risks.” International Journal of Production Economics 213: 124–137. doi:10.1016/j.ijpe.2019.03.018.
  • Jurburg, D., and M. Tanco. 2017. “Study of the Operational Factors Affecting Productivity in SMEs.” Memoria Investigaciones en Ingenieria 15: 7–23.
  • Keyvanshokooh, E., S. M. Ryan, and E. Kabir. 2016. “Hybrid Robust and Stochastic Optimization for closed-loop Supply Chain Network Design Using Accelerated Benders Decomposition.” European Journal of Operational Research 249 (1): 76–92. doi:10.1016/j.ejor.2015.08.028.
  • Khatami, M., M. Mahootchi, and R. Z. Farahani. 2015. “Benders’ Decomposition for Concurrent Redesign of Forward and closed-loop Supply Chain Network with Demand and Return Uncertainties.” Transportation Research Part E: Logistics and Transportation Review 79: 1–21. doi:10.1016/j.tre.2015.03.003.
  • Liao, H., and L. Li. 2021. “Environmental Sustainability EOQ Model for closed-loop Supply Chain under Market Uncertainty: A Case Study of Printer Remanufacturing.” Computers & Industrial Engineering 151: 106525. doi:10.1016/j.cie.2020.106525.
  • Liu, L., Z. Wang, L. Xu, X. Hong, and K. Govindan. 2017. “Collection Effort and Reverse Channel Choices in a closed-loop Supply Chain.” Journal of Cleaner Production 144: 492–500. doi:10.1016/j.jclepro.2016.12.126.
  • Lücker, F., R. W. Seifert, and I. Biçer. 2019. “Roles of Inventory and Reserve Capacity in Mitigating Supply Chain Disruption Risk.” European Journal of Operational Research 57 (4): 1238–1249. doi:10.1080/00207543.2018.1504173.
  • Mahapatra, M. S., P. C. Pradhan, and J. K. Jha. 2021. “Sourcing Decisions with Order Allocation under Supply Disruption Risk considering Quantitative and Qualitative Criteria.” Operational Research- An International Journal 21: 1–43.
  • Masoudipour, E., H. Amirian, and R. Sahraeian. 2017. “A Novel closed-loop Supply Chain Based on the Quality of Returned Products.” Journal of Cleaner Production 151: 344–355. doi:10.1016/j.jclepro.2017.03.067.
  • Matsumoto, M., and Y. Umeda. 2011. “An Analysis of Remanufacturing Practices in Japan.” Journal of Remanufacturing 1 (1): 2. doi:10.1186/2210-4690-1-2.
  • Meena, P. L., and S. P. Sarmah. 2013. “Multiple Sourcing under Supplier Failure Risk and Quantity Discount: A Genetic Algorithm Approach.” Transportation Research Part E: Logistics and Transportation Review 50 (C): 84–97. doi:10.1016/j.tre.2012.10.001.
  • Meena, P. L., and S. P. Sarmah. 2016. “Supplier Selection and Demand Allocation under Supply Disruption Risks.” The International Journal of Advanced Manufacturing Technology 83 (1–4): 265–274. doi:10.1007/s00170-015-7520-5.
  • Meena, P. L., S. P. Sarmah, and A. Sarkar. 2011. “Sourcing Decisions under Risks of Catastrophic Event Disruptions.” Transportation Research Part E: Logistics and Transportation Review 47 (6): 1058–1074. doi:10.1016/j.tre.2011.03.003.
  • Modak, N. M., N. Modak, S. Panda, and S. S. Sana. 2018. “Analyzing Structure of two-echelon closed-loop Supply Chain for Pricing, Quality and Recycling Management.” Journal of Cleaner Production 171: 512–528. doi:10.1016/j.jclepro.2017.10.033.
  • Mondal, A., and S. K. Roy. 2021. “Multi-objective Sustainable Opened- and closed-loop Supply Chain under Mixed Uncertainty during COVID-19 Pandemic Situation.” Computers & Industrial Engineering 159: 107453. doi:10.1016/j.cie.2021.107453.
  • OECD Green Growth Studies, (2015). Creating Incentives for Greener Products: A Policy Manual for Eastern Partnership Countries. 10.1787/9789264244542-en
  • Özkır, V., and H. Başlıgıl. 2012. “Modelling product-recovery Processes in closed-loop supply-chain Network Design.” International Journal of Production Research 50 (8): 2218–2233. doi:10.1080/00207543.2011.575092.
  • Pedram, A., N. B. Yusoff, O. E. Udoncy, A. B. Mahat, P. Pedram, and A. Babalola. 2017. “Integrated Forward and Reverse Supply Chain: A Tire Case Study.” Waste Management 60: 460–470. doi:10.1016/j.wasman.2016.06.029.
  • Peng, H., N. Shen, H. Liao, H. Xue, and Q. Wang. 2020. “Uncertainty Factors, Methods, and Solutions of closed-loop Supply chain—A Review for Current Situation and Future Prospects.” Journal of Cleaner Production 254: 120032. doi:10.1016/j.jclepro.2020.120032.
  • Ponte, B., M. M. Naim, and A. A. Syntetos. 2019. “The Effect of Returns Volume Uncertainty on the Dynamic Performance of closed-loop Supply Chains.” Journal of Remanufacturing 10 (1): 1–14. doi:10.1007/s13243-019-00070-x.
  • Rizova, M. I., T. C. Wong, and W. Ijomah. 2020. “A Systematic Review of decision-making in Remanufacturing.” Computers & Industrial Engineering 147: 106681.
  • Ruiz-Torres, A. J., and F. Mahmoodi. 2006. “A Supplier Allocation Model considering Delivery Failure, Maintenance and Supplier Cycle Costs.” International Journal of Production Economics 103 (2): 755–766. doi:10.1016/j.ijpe.2005.09.008.
  • Ruiz-Torres, A. J., F. Mahmoodi, and S. Ohmori. 2019. “Joint Determination of Supplier Capacity and Returner Incentives in a closed-loop Supply Chain.” Journal of Cleaner Production 215: 1351–1361. doi:10.1016/j.jclepro.2019.01.146.
  • Ruiz-Torres, A. J., F. Mahmoodi, and A. Z. Zeng. 2013. “Supplier Selection Model with Contingency Planning for Supplier Failures.” Computers & Industrial Engineering 66 (2): 374–382. doi:10.1016/j.cie.2013.06.021.
  • Sarkar, A., and P. K. J. Mohapatra. 2009. “Determining the Optimal Size of Supply Base with the Consideration of Risks of Supply Disruptions.” International Journal of Production Economics 119 (1): 122–135. doi:10.1016/j.ijpe.2008.12.019.
  • Savaskan, R. C., S. Bhattacharya, and L. N. Van Wassenhove. 2004. “Closed-loop Supply Chain Models with Product Remanufacturing.” Management Science 50 (2): 239–252. doi:10.1287/mnsc.1030.0186.
  • Sawik, T. 2013. “Selection of Resilient Supply Portfolio under Disruption Risks.” Omega 41 (2): 259–269. doi:10.1016/j.omega.2012.05.003.
  • Sawik, T. 2018. “Selection of a Dynamic Supply Portfolio under Delay and Disruption Risks.” International Journal of Production Research 56 (1–2): 760–782. doi:10.1080/00207543.2017.1401238.
  • Schramm, V. B., L. P. B. Cabral, and F. Schramm. 2020. “Approaches for Supporting Sustainable Supplier selection-A Literature Review.” Journal of Cleaner Production 273: 123089. doi:10.1016/j.jclepro.2020.123089.
  • Snyder, L. V., Z. Atan, P. Peng, Y. Rong, A. J. Schmitt, and B. Sinsoysal. 2016. “OR/MS Models for Supply Chain Disruptions: A Review.” IIE Transactions 48 (2): 89–109. doi:10.1080/0740817x.2015.1067735.
  • Stević, Ž., D. Pamučar, A. Puška, and P. Chatterjee. 2020. “Sustainable Supplier Selection in Healthcare Industries Using a New MCDM Method: Measurement of Alternatives and Ranking according to COmpromise Solution (MARCOS).” Computers & Industrial Engineering 140: 106231. doi:10.1016/j.cie.2019.106231.
  • Sureeyatanapas, P., K. Sriwattananusart, T. Niyamosoth, W. Sessomboon, and S. Arunyanart. 2018. “Supplier Selection Towards Uncertain and Unavailable Information: An Extension of TOPSIS Method.” Operations Research Perspectives 5: 69–79. doi:10.1016/j.orp.2018.01.005.
  • Taleizadeh, A. A., F. Haghighi, and S. T. A. Niaki. 2019. “Modeling and Solving a Sustainable Closed Loop Supply Chain Problem with Pricing Decisions and Discounts on Returned Products.” Journal of Cleaner Production 207: 163–181. doi:10.1016/j.jclepro.2018.09.198.
  • Torabi, S. A., M. Baghersad, and S. A. Mansouri. 2015. “Resilient Supplier Selection and Order Allocation under Operational and Disruption Risks.” Transportation Research Part E: Logistics and Transportation Review 79: 22–48. doi:10.1016/j.tre.2015.03.005.
  • Weber, C. A., J. R. Current, and W. C. Benton. 1991. “Vendor Selection Criteria and Methods.” European Journal of Operational Research 50 (1): 2–18. doi:10.1016/0377-2217(91)90033-R.
  • Wu, G. H., C. K. Chang, and L. M. Hsu. 2018. “Comparisons of Interactive Fuzzy Programming Approaches for Closed-loop Supply Chain Network Design under Uncertainty.” Computers & Industrial Engineering 68. doi:10.1016/j.cie.2018.09.022.
  • Yolmeh, A., and U. Saif. 2021. “Closed-loop Supply Chain Network Design Integrated with Assembly and Disassembly Line Balancing under Uncertainty: An Enhanced Decomposition Approach.” International Journal of Production Research 59 (9): 2690–2707. doi:10.1080/00207543.2020.1736723.
  • Zeballos, L. J., C. A. Méndez, and A. P. Barbosa-Povoa. 2016. “Design and Planning of closed-loop Supply Chains: A risk-averse Multistage Stochastic Approach.” Industrial & Engineering Chemistry Research 55 (21): 6236–6249. doi:10.1021/acs.iecr.5b03647.
  • Zeballos, L. J., C. A. Méndez, and A. P. Barbosa-Povoa. 2018. “Integrating Decisions of Product and closed-loop Supply Chain Design under Uncertain Return Flows.” Computers & Chemical Engineering 112: 211–238. doi:10.1016/j.compchemeng.2018.02.011.