References
- Bolten, J. G., Leonard, R. S., Arena, M. V., Younossi, O., & Sollinger, J. M. (2008). Sources of Weapon System Cost Growth: Analysis of 35 Major Defense Acquisition Programs. Santa Monica, CA: RAND Corporation.
- Christensen, D. S. ( Spring 1994). Using Performance Indices to Evaluate the Estimate at Completion. Journal of Cost Analysis and Management, 17–24.
- Christensen, D. S., Antolini, R. C., & McKinney, J. W. ( Spring 1995). A Review of Estimate at Completion Research. Journal of Cost Analysis and Management, 41–62.
- Coleman, R. L., Dameron, M. E., Chelson, H. F., Summerville, J. R., & Van Drew, S. L. (2003). Predicting Final CPI. 4th Joint Annual ISPA/SCEA International Conference, Orlando, FL.
- Crawford, D. E., & Smoker, R. E. ( June 1993). A Cost Risk Analysis Metric (Technical Application Guide). The Measureable News, 1–8.
- Druker, E., Demangos, D., & Coleman, R. (2009). Performing Statistical Analysis on Earned Value Data. The 2009 ISPA/SCEA Joint Conference, St. Louis, MO.
- Heydinger, G. N. (1977). Space and Missile Systems Organization Cost Performance Forecasting Study. Los Angeles: Cost Analysis Division.
- Keaton, C. G., White, E. D., & Unger, E. J. (2011). Using Earned Value Data to Detect Potential Problems in Acquisition Contracts. Journal of Cost Analysis and Parametrics, 4(2), 148–159.
- NDIA/PMSC. (2009). Earned Value Management Systems Intent Guide. Arlington, VA: National Defense Industrial Association.
- OUSD (AT&L). (2005). Data Item Description: Contract Performance Report. Washington, D.C.: OUSD (AT&L).
- Smoker, R. E. (2011). Use of Earned Value Management Trends to Forecast Cost Risks. Journal of Cost Analysis and Parametrics, 4(1), 31–51.
- Smoker, R. E. (2013). Use of EVM Trends to Find WBS Level 3 Completion Dates. (Unpublished).