References
- Abernethy, T. S. (1984). An application of the Rayleigh distribution to contract cost data ( Master’s thesis). Naval Postgraduate School, Monterey, CA.
- Belcher, G. J., & Dukovich, J. A. (1999). Improved methods for estimating development costs. Tysons, VA: Logistics Management Institute.
- Brown, T. W., White, E. D., & Gallagher, M. A. (2002). Weibull-based forecasting of R&D program budgets. The Journal of Cost Analysis & Management, 4(1), 41–54.
- Burgess, E. (2006). R&D Budget Profiles and Metrics. Journal of Parametrics, 25(1), 11–29.
- Carter, A. B. (2010). Better buying power: Guidance for obtaining greater efficiency and productivity in defense spending (Memorandum). Washington, DC: U.S. Department of the Air Force.
- Department of the Air Force. (2007). Air force cost analysis handbook. Washington, DC: U.S. Department of the Air Force.
- Dibbly, S. (1988). FSD avionics funding profile study. Washington, DC: U.S. Department of the Air Force, ASD/ACCR Research and Cost Division.
- Johnson, N. L., Kotz, S., & Balakrishnan, N. (1994). Continuous univariate distributions (2nd ed.). New York, NY: Wiley-Interscience.
- Lee, D. A., Hogue, M. R., & Gallagher, M. A. (1997). Determining a budget profile from a R&D cost estimate. The Journal of Cost Analysis, 14(2), 29–41. doi:10.1080/08823871.1997.10462311
- National Aeronautics and Space Administration. (2002). NASA cost estimating handbook. Washington, DC: National Aeronautics and Space Administration.
- Neter, J., Kutner, M. H., Nachtseim, C. J., & Wasserman, W. (1996). Applied linear statistical models (4th ed.). Boston, MA: McGraw-Hill Companies.
- Norden, P. V. (1970). Useful tools for project management. In M. K. Starr (Ed.), Management of production (pp. 71–101). Baltimore, MD: Penguin Publishing.
- Packard, D. ( Chairman). (1986). A quest for excellence, final report to the president by the president’s blue ribbon commission on defense management. Washington, DC: U.S. Government.
- Putnam, L. H. (1978). A general empirical solution to the macro software sizing and estimating problem. IEEE Transactions on Software Engineering, 4(4), 345–361. doi:10.1109/TSE.1978.231521
- Saxer, R. K. (1995). Buying the C-17: A case study. Industrial College of the Armed Forces ( Master’s thesis), Washington, DC.
- Unger, E. J., Gallagher, M. A., & White, E. D. (2004). R&D budget-driven cost and schedule overruns. The Journal of Cost Analysis & Management, 6(1), 80–97. doi:10.1080/15411656.2004.10462249
- Watkins, H. (1982). An application of Rayleigh curve theory to contract cost estimation and control ( Master’s thesis). Naval Postgraduate School, Monterey, CA.