121
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Time Phasing Aircraft R&D Using the Weibull and Beta Distributions

, , &

References

  • Abernethy, T. S. (1984). An application of the Rayleigh distribution to contract cost data ( Master’s thesis). Naval Postgraduate School, Monterey, CA.
  • Belcher, G. J., & Dukovich, J. A. (1999). Improved methods for estimating development costs. Tysons, VA: Logistics Management Institute.
  • Brown, T. W., White, E. D., & Gallagher, M. A. (2002). Weibull-based forecasting of R&D program budgets. The Journal of Cost Analysis & Management, 4(1), 41–54.
  • Burgess, E. (2006). R&D Budget Profiles and Metrics. Journal of Parametrics, 25(1), 11–29.
  • Carter, A. B. (2010). Better buying power: Guidance for obtaining greater efficiency and productivity in defense spending (Memorandum). Washington, DC: U.S. Department of the Air Force.
  • Department of the Air Force. (2007). Air force cost analysis handbook. Washington, DC: U.S. Department of the Air Force.
  • Dibbly, S. (1988). FSD avionics funding profile study. Washington, DC: U.S. Department of the Air Force, ASD/ACCR Research and Cost Division.
  • Johnson, N. L., Kotz, S., & Balakrishnan, N. (1994). Continuous univariate distributions (2nd ed.). New York, NY: Wiley-Interscience.
  • Lee, D. A., Hogue, M. R., & Gallagher, M. A. (1997). Determining a budget profile from a R&D cost estimate. The Journal of Cost Analysis, 14(2), 29–41. doi:10.1080/08823871.1997.10462311
  • National Aeronautics and Space Administration. (2002). NASA cost estimating handbook. Washington, DC: National Aeronautics and Space Administration.
  • Neter, J., Kutner, M. H., Nachtseim, C. J., & Wasserman, W. (1996). Applied linear statistical models (4th ed.). Boston, MA: McGraw-Hill Companies.
  • Norden, P. V. (1970). Useful tools for project management. In M. K. Starr (Ed.), Management of production (pp. 71–101). Baltimore, MD: Penguin Publishing.
  • Packard, D. ( Chairman). (1986). A quest for excellence, final report to the president by the president’s blue ribbon commission on defense management. Washington, DC: U.S. Government.
  • Putnam, L. H. (1978). A general empirical solution to the macro software sizing and estimating problem. IEEE Transactions on Software Engineering, 4(4), 345–361. doi:10.1109/TSE.1978.231521
  • Saxer, R. K. (1995). Buying the C-17: A case study. Industrial College of the Armed Forces ( Master’s thesis), Washington, DC.
  • Unger, E. J., Gallagher, M. A., & White, E. D. (2004). R&D budget-driven cost and schedule overruns. The Journal of Cost Analysis & Management, 6(1), 80–97. doi:10.1080/15411656.2004.10462249
  • Watkins, H. (1982). An application of Rayleigh curve theory to contract cost estimation and control ( Master’s thesis). Naval Postgraduate School, Monterey, CA.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.