121
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

Covered with Oil: Incorporating Realism in Cost Risk Analysis

References

  • Abate, C. C. (2004). Analysis of missile systems cost growth and implementation of acquisition reform initiatives using a hybrid adjusted cost growth model (Thesis). Wright-Patterson Air Force Base, OH: Air Force Institute of Technology.
  • Air Force. (2007). Air force cost uncertainty handbook. Hanscom Air Force Base, MA: U.S. Air Force.
  • Anderson, T. (2003). Satellite remaining weight growth. Presented to the Air Force Cost Analysis Agency, Arlington, VA.
  • Bolten, J. G., Leonard, R. S., Arena, M. V., Younossi, O., & Sollinger, J. M. (2006). Sources of Weapon System Cost Growth: Analysis of 35 Major Defense Acquisition Programs. Santa Monica, CA: RAND Corporation.
  • Book, S. A. (1999, February). Why correlation matters in cost estimating. Paper presented at the 32nd Annual DOD Cost Analysis Symposium, Williamsburg, VA.
  • Book, S. A. (2007). Cost S-curves through project phases (NASA Independent Project Assessment Office technical report). Washington, DC: NASA.
  • DAMIR. (2010). Selected acquisition database. Arlington, VA: DAMIR.
  • De Vany, A. (2004). Hollywood economics: How extreme uncertainty shapes the film industry. New York, NY: Routledge.
  • Embrechts, P., & Klüppelberg, C. (2003). Modelling extremal events for finance and insurance. Heidelberg, Germany: Springer-Verlag.
  • Garvey, P. R. (2000). Probability methods for cost uncertainty analysis. New York, NY: Marcel Dekker.
  • General Accounting Office. (1992). NASA program costs: Space missions require substantially more funding than initially estimated (GAO Report GAO/NSIAD-93-97). Washington, DC: Government Accountability Office.
  • General Accounting Office. (2004). Lack of disciplined cost-estimating processes hinders effective program management (GAO Report GAO-04-642). Washington, DC: General Accounting Office.
  • General Accounting Office. (2009a). Defense acquisitions: Assessments of selected weapon programs (GAO Report GAO-09-326SP). Washington, DC: General Accounting Office.
  • General Accounting Office. (2009b). NASA: Assessments of selected large-scale projects (GAO Report GAO-09-306SP). Washington, DC: General Accounting Office.
  • Goldie, C. M., & Kluppelberg, C. (1998). Subexponential distributions. In R. J. Adler, et al. (Eds.), A practical guide to heavy tails: Statistical techniques and applications. Rensselaer, NY: Birkhauser.
  • Hunt, C. (2006, August). Cost risk for CLV. Presented at a meeting on Crewed Launch Vehicle, Johnson Space Center, Houston, TX.
  • Institute for Defense Analysis. (2009). The Major Causes of Cost Growth in Defense Acquisition (IDA Paper P-4531).
  • Klugman, S. A., & Panjer, H. H. (2008). Loss distributions. Hoboken, NJ: John Wiley & Sons.
  • Marshall Space Flight Center (MSFC). (1981). Tethered satellite system risk analysis (REDSTAR Document #121-5511). Redstone Arsenal, AL: Marshall Space Flight Center.
  • Marshall Space Flight Center (MSFC). (1982). Tethered satellite system risk analysis (REDSTAR Document #121-5507). Redstone Arsenal, AL: Marshall Space Flight Center.
  • Marshall Space Flight Center (MSFC). (1992). TSS, OTA, OMV, ET, SSME, SRM historical growth cost drivers (REDSTAR Document #121-4955). Redstone Arsenal, AL: Marshall Space Flight Center.
  • Neatrour, J., & Hulkower, N. (2009, May). Fat-tailed distributions for cost and schedule risk analysis. Presented at the NASA Cost Symposium, Kennedy Space Center, Florida.
  • Nolan, J. P. (1998). Univariate stable distributions: Parameterizations and software. In R. J. Adler, et al. (Eds.), A practical guide to heavy tails: Statistical techniques and applications. Rensselaer, NY: Birkhauser.
  • Phillips, R. A. (2004). An analysis of aircraft weapon systems cost growth and implementation of acquisition reform initiatives using a hybrid adjusted cost growth model (Masters Thesis). Air Force Institute of Technology. (REDSTAR Document #55300130).
  • Porter, G., Gladstone, B., Gordon, C. V., Karvonides, N., Kneece Jr., R. R., Mandelbaum, J., O’Neil, W. D. (2009). The major causes of cost growth in defense acquisition (Institute for Defense Analysis technical report). Arlington, VA: IDA.
  • Rachev, S. T., & Fabozzi, F. J. (2005). Fat-tailed and skewed asset return distributions: Implications for risk management, portfolio selection, and option pricing. Hoboken, NJ: John Wiley & Sons.
  • Smart, C. (2005, June). Risk analysis in the NASA/air force cost model. Presented at the Joint Annual ISPA/SCEA Conference, Denver, CO.
  • Smart, C. (2007, July). Cost and schedule interrelationships. Presented at the NASA Cost Symposium, Denver, Colorado.
  • Smart, C. (2008, May). The fractal geometry of cost risk. Presented at the Joint Annual ISPA/SCEA Conference, Noorwijk, The Netherlands.
  • Smart, C. (2009, June). The portfolio effect and the free lunch. Presented at the Joint Annual ISPA/SCEA Conference, St. Louis, Missouri.
  • Smart, C. (2010, June). Here there be dragons: Considering the right tail in risk management. Presented at the Joint Annual ISPA/SCEA Conference, San Diego, California.
  • Taleb, N. N. (2007). The Black Swan: The impact of the highly improbable. New York, NY: Random House.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.