Publication Cover
Transportation Letters
The International Journal of Transportation Research
Volume 11, 2019 - Issue 5
261
Views
7
CrossRef citations to date
0
Altmetric
Research Paper

Estimation of critical gap of U-turns at uncontrolled median openings

ORCID Icon, &

References

  • Aldian, A., and M. A. P. Taylor. 2001. “Selecting Priority Junction Traffic Models to Determine U-turn Capacity at Median Opening.” Proceedings of the Eastern Asia Society for Transportation Studies 3 (2): 101–113.
  • Al-Masaeid, H. R. 1999. “Capacity of U-turn at Median Openings.” ITE Journal 69 (6): 28–30.
  • Amin, H. J., and A. K. Maurya. 2015. “A Review of Critical Gap Estimation Approaches at Uncontrolled Intersection in Case of Heterogeneous Traffic Conditions.” Journal of Transport Literature 9 (3): 5–9.10.1590/2238-1031.jtl.v9n3a1
  • Ashalatha, R., and S. Chandra. 2011. “Critical Gap Through Clearing Behavior of Drivers at Unsignalised Intersections.” KSCE Journal of Civil Engineering 15 (8): 427–1434.
  • Ashalatha, R., S. Chandra, and K. Prasanth. 2005. “Critical Gap at Uncontrolled Intersections Using Maximum Likelihood Technique.” Indian Highways 33 (10): 67–74. Indian Roads Congress, New Delhi.
  • Ashworth, R., and B. D. Green. 1966. “Gap Acceptance at An Uncontrolled Intersection.” Traffic Engineering Control 7: 676–678.
  • Bunker, J. M. 2012. “Novel Methods and the Maximum Likelihood Estimation Technique for Estimating Traffic Critical Gap.” Journal of Advanced Transportation 48 (6): 542–555.
  • Chen, X., Y. Qi, and G. Liu. 2012. “Empirical Study of Gap-acceptance Behavior of Right-turn-on-Red Drivers on Dual Right-turn Lanes.” Journal of Transportation Engineering 139 (2): 173–180.10.1061/(ASCE)TE.1943-5436.0000489
  • Davis, G. A., and T. Swenson. 2004. “Field Study of Gap Acceptance by Left-turning Drivers.” Transportation Research Record: Journal of the Transportation Research Board 1899: 71–75.10.3141/1899-09
  • Devarasetty, P. C., Y. Zhang, and K. Fitzpatrick. 2012. “Differentiating between Left-turn Gap and Lag Acceptance at Unsignalized Intersections as a Function of the Site Characteristics.” Journal of Transportation Engineering 138 (5): 580–588.10.1061/(ASCE)TE.1943-5436.0000368
  • Gattis, J. L., and S. T. Low. 1999. “Gap Acceptance at Atypical Stop Controlled Intersections.” Journal of Transportation Engineering 116 (2): 153–166.
  • Gavulová, A. 2012. “Use of Statistical Techniques for Critical Gaps Estimation.” In the Proceedings of the 12th International Conference Reliability and Statistics in Transportation and Communication (RelStat’12), Riga, Latvia, October 17–20, 20–26.
  • Hamed, M. M., S. M. Easa, and R. R. Batayneh. 1997. “Disaggregate Gap-acceptance Model for Unsignalized T-intersections.” Journal of Transportation Engineering 123 (1): 36–42.10.1061/(ASCE)0733-947X(1997)123:1(36)
  • HCM (Highway Capacity Manual). 1985. TRB. Washington, DC: National Research Council.
  • HCM (Highway Capacity Manual). 1994. TRB. Washington, DC: National Research Council.
  • HCM (Highway Capacity Manual). 2000. TRB. Washington, DC: National Research Council.
  • HCM (Highway Capacity Manual). 2010. TRB. Washington, DC: National Research Council.
  • Hwang, S. Y., and C. H. Park. 2005. “Modeling of the Gap Acceptance Behavior at a Merging Section of Urban Freeway.” In Proceedings of the Eastern Asia Society for Transportation Studies, Tokyo, 5, 1641–1656.
  • Jenjiwattanakul, T., and K. Sano. 2011. “Effect of Waiting Time on the Gap Acceptance Behavior of U-turning Vehicles at Midblock Median Openings.” Journal of the Eastern Asia Society for Transportation Studies 9: 1601–1613.
  • Kyte, M., C. Clemow, and C. J. Khisty. 1991. “Capacity and Delay Characteristics of Two-way Stop-controlled Intersections.” Transportation Research Record: Journal of the Transportation Research Board 1320: 160–167.
  • Liu, P., J. Lu, and B. Cao. 2009. “Capacity of U-turns at Unsignalized Median Openings on Six-lane Streets.” Transportation Research Record: Journal of the Transportation Research Board 2130: 59–65.10.3141/2130-08
  • Liu, P., X. Wang, J. Lu, and G. Sokolow. 2007. “Headway Acceptance Characteristics of U-turning Vehicles at Unsignalized Intersections.” Transportation Research Record: Journal of the Transportation Research Board 2027: 52–57.10.3141/2027-07
  • Lord-Attivor, R., and M. K. Jha. 2012. “Modeling Gap Acceptance and Driver Behavior at Stop Controlled (Priority) Intersections in Developing Countries.” In Proceedings of the 6th WSEAS international conference on Computer Engineering and Applications, Harvard, Cambridge, 29–38.
  • Ma, D. F., X. L. Ma, S. Jin, F. Sun, and D. H. Wang. 2013. “Estimation of Major Stream Delays with a Limited Priority Merge.” Canadian Journal of Civil Engineering 40 (12): 1227–1233.10.1139/cjce-2012-0532
  • McGowen, P., and L. Stanley. 2012. “Alternative Methodology for Determining Gap Acceptance for Two-way Stop-controlled Intersections.” Journal of Transportation Engineering 138 (5): 495–501.10.1061/(ASCE)TE.1943-5436.0000358
  • Miller, A. J., and R. L. Pretty. 1968. “Overtaking on Two-lane Rural Roads.” Proceedings of the Australia Road Research Board (ARRB) 4 (1): 582–591.
  • Mohapatra, S. S., P. P. Dey, and S. Chandra. 2016. “Modeling the Critical Position of U-turning Vehicles at Uncontrolled Median Openings.” KSCE Journal of Civil Engineering 20 (1): 411–420.10.1007/s12205-015-1293-0
  • Ogallo, H., and M. Jha. 2014. “Methodology for Critical-gap Analysis at Intersections with Unprotected Opposing Left-turn Movements.” Journal of Transportation Engineering 140 (9): 04014045.10.1061/(ASCE)TE.1943-5436.0000691
  • Pant, P., and P. Balakrishnan. 1994. “Neural Network for Gap Acceptance at Stop‐controlled Intersections.” Journal of Transportation Engineering 120 (3): 432–446.10.1061/(ASCE)0733-947X(1994)120:3(432)
  • Patil, G., and D. Pawar. 2014. “Temporal and Spatial Gap Acceptance for Minor Road at Uncontrolled Intersections in India.” Transportation Research Record: Journal of the Transportation Research Board 2461: 129–136.10.3141/2461-16
  • Raff, M. S., and J. W. Hart. 1950. A Volume Warrant for Stop Signs. Saugatuck, CT: Eno Foundation for Highway Traffic Control.
  • Shihan, H., and H. Mohammed. 2009. “Traffic system studies at median U-turn in Baghdad city employing U-SIM model.” Journal of Engineering and Development 13 (1): 226–237.
  • Tian, Z. Z., R. Troutbeck, M. Kyte, W. Brilon, M. Vandehey, W. Kittelson, and B. Robinson. 2000. “A Further Investigation on Critical Gap and Follow-up Time.” Proceedings of the 4th International Symposium on Highway Capacity, Maui, Hawaii, Transportation Research Circular E-C018, June, 397–408.
  • Troutbeck, R. J. 1992. Estimating the Critical Acceptance Gap From Traffic Movements. Physical Infrastructure Centre, Queensland University of Technology.
  • Tupper, S. M., M. A. Knodler, C. D. Fitzpatrick, and D. S. Hurwitz. 2013. “Comparative Analysis of Critical Gap Acceptance Methodologies.” TRB 92nd Annual Meeting Compendium of Papers, Washington, DC.
  • Wan, I. W. H., and M. E. Sanik. 2007. “Estimating Critical Gap Acceptance for Unsignalized T-intersection Under Mixed Traffic Flow Condition.” In the proceedings of the Eastern Asia Society for Transportation Studies, 6.
  • Wu, N. 2006. “A New Model for Estimating Critical Gap and Its Distribution at Unsignalized Intersections Based on the Equilibrium of Probabilities.” In the proceedings of the 5th International Symposium on Highway Capacity and Quality of Service, Yokohama, Japan, July, 25–29.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.