Publication Cover
Transportation Letters
The International Journal of Transportation Research
Volume 13, 2021 - Issue 7
1,180
Views
16
CrossRef citations to date
0
Altmetric
Article

Integrated scheduling in automated container terminals considering AGV conflict-free routing

, , &

References

  • Cao, J. X., D. H. Lee, J. H. Chen, and Q. Shi. 2010. “The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders’ Decomposition-based Methods.” Transportation Research Part E 46 (3): 0–353. doi:10.1016/j.tre.2009.08.012.
  • Chang, Y., X. Zhu, B. Yan, and L. Wang. 2017. “Integrated Scheduling of Handling Operations in Railway Container Terminals.” Transportation Letters 11 (7):402–412.
  • Chen, L., and A. Langevin, LUZQ. 2013. “Integrated Scheduling of Crane Handling and Truck Transportation in a Maritime Container Terminal. Eur J Oper Res”. European Journal of Operational Research 225 (1): 142–152. doi:10.1016/j.ejor.2012.09.019.
  • He, J., Y. Huang, W. Yan, and S. Wang. 2015. “Integrated Internal Truck, Yard Crane and Quay Crane Scheduling in a Container Terminal considering Energy Consumption.” Expert Systems with Applications 42 (5): 2464–2487. doi:10.1016/j.eswa.2014.11.016.
  • Jun-Jun, L., X. Bo-Wei, P. Octavian, Y. Yong-Sheng, and W. Hua-Feng. 2018. “Impact Analysis of Travel Time Uncertainty on Agv Catch-up Conflict and the Associated Dynamic Adjustment.” Mathematical Problems in Engineering 2018: 1–11.
  • Kaveshgar, N., and N. Huynh. 2015. “Integrated Quay Crane and Yard Truck Scheduling for Unloading Inbound Containers.” International Journal of Production Economics 159: 168–177. doi:10.1016/j.ijpe.2014.09.028.
  • Lau, H. Y. K., and Y. Zhao. 2008. “Integrated Scheduling of Handling Equipment at Automated Container Terminals.” Annals of Operations Research 159 (1): 373–394. doi:10.1007/s10479-007-0262-5.
  • Lu, Y., and M. Le. 2014. “The Integrated Optimization of Container Terminal Scheduling with Uncertain Factors.” Computers & Industrial Engineering 75: 209–216. doi:10.1016/j.cie.2014.06.018.
  • Luo, J., Y. Wu, and A. B. Mendes. 2016. “Modelling of Integrated Vehicle Scheduling and Container Storage Problems in Unloading Process at an Automated Container Terminal.” Computers & Industrial Engineering 94: 32–44.
  • Małopolski., W. 2018. “A Sustainable and Conflict-free Operation of AGVs in A Square Topology.” Computers & Industrial Engineering 126: 472–481. doi:10.1016/j.cie.2018.10.002.
  • Miyamoto, T., and K. Inoue. 2016. “Local and Random Searches for Dispatch and Conflict-free Routing Problem of Capacitated Agv Systems.” Computers & Industrial Engineering 91: 1–9. doi:10.1016/j.cie.2015.10.017.
  • Moorthy, R. L., W. H. Guan, N. W. Cheong, and T. C. Piaw. 2003. “Cyclic Deadlock Prediction and Avoidance for Zone-controlled Agv System.” International Journal of Production Economics 83 (3): 309–324. doi:10.1016/S0925-5273(02)00370-5.
  • Nishi, T., M. Ando, and M. Konishi. 2006. “Experimental Studies on a Local Rescheduling Procedure for Dynamic Routing of Autonomous Decentralized Agv Systems.” Robotics and Computer-integrated Manufacturing 22 (2): 154–165. doi:10.1016/j.rcim.2005.02.010.
  • Nishi, T., Y. Hiranaka, and I. E. Grossmann. 2011. “A Bilevel Decomposition Algorithm for Simultaneous Production Scheduling and Conflict-free Routing for Automated Guided Vehicles.” Computers and Operations Research 38 (5): 876–888. doi:10.1016/j.cor.2010.08.012.
  • Roy, D., A. Gupta, and R. B. M. De Koster. 2015. “A Non-linear Traffic Flow-based Queuing Model to Estimate Container Terminal Throughput with Agvs.” International Journal of Production Research 54 (2): 472–493.
  • Srinivas, M., and L. M. Patnaik. 1994. “Adaptive Probabilities of Crossover and Mutation in Genetic Algorithms.” IEEE Transactions on Systems, Man and Cybernetics 24 (4): 656–667. doi:10.1109/21.286385.
  • Tang, L., J. Zhao, and J. Liu. 2014. “Modeling and Solution of the Joint Quay Crane and Truck Scheduling Problem.” European Journal of Operational Research 236 (3): 978–990. doi:10.1016/j.ejor.2013.08.050.
  • Truong, L. T., M. Sarvi, G. Currie, and T. M. Garoni. (2015). “How Many Simulation Runs are Required to Achieve Statistically Confident Results: A Case Study of Simulation-Based Surrogate Safety Measures.” 2015 IEEE 18th International Conference on Intelligent Transportation Systems, Spain, 274–278.
  • Xin, J., R. R. Negenborn, and G. Lodewijks. 2014a. “Energy-aware Control for Automated Container Terminals Using Integrated Flow Shop Scheduling and Optimal Control.” Transportation Research Part C: Emerging Technologies 44: 214–230. doi:10.1016/j.trc.2014.03.014.
  • Xin, J., R. R. Negenborn, and G. Lodewijks. 2014b. “Trajectory Planning for Agvs in Automated Container Terminals Using Avoidance Constraints: A Case Study.” IFAC Proceedings Volumes 47 (3): 9828–9833. doi:10.3182/20140824-6-ZA-1003.01306.
  • Yang, Y., M. Zhong, and Y. Dessouky. 2018. “An Integrated Scheduling Method for AGV Routing in Automated Container Terminals.” Computers & Industrial Engineering 126: 482–493. doi:10.1016/j.cie.2018.10.007.
  • Zhen, L., S. Yu, S. Wang, and Z. Sun. 2016. “Scheduling Quay Cranes and Yard Trucks for Unloading Operations in Container Ports.” Annals of Operations Research 273: 455–478.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.