207
Views
22
CrossRef citations to date
0
Altmetric
Original Articles

Queuing network analysis approach for estimating the sizes of the time buffers in Theory of Constraints-controlled production systems

&
Pages 1207-1226 | Received 01 Jun 2003, Published online: 21 Oct 2013

References

  • ATWATER, J. B. and CHAKRAVORTY, S. S., 1994, Does protective capacity assist managers in competing along time-based dimensions? Production and Inventory Management Journal, Third Quarter, 53–59.
  • BITRAN, G. B. and TIRUPATI, D., 1988, Multiproduct queueing networks with deterministic routing: decomposition approach and the notion of interference. Management Science, 34, 75–100.
  • GOLDRATT, E. M., 1986, The Goal: A Process of Ongoing Improvement, revd edn (Croton-on-Hudson: North River).
  • GOLDRATT, E. M., 1990, The Haystack Syndrome: Sifting Information Out of the Data Ocean (Croton-on-Hudson: North River). p 238.
  • Hopp, W. J. and SPEARMAN, M. L., 1996, Factory Physics: Foundations for Manufacturing Management (Chicago: Irwin).
  • KELTON, W. D., SADOWSKI, R. P. and SADOWSKI, D. A., 1998, Simulation with Arena (Boston: McGraw-Hill).
  • MURALIDHAR, K., SWENSETH, S. R. and WILSON, R. L., 1992, Describing processing times in JIT environments. International Journal of Production Research, 30, 1–11.
  • RADOVILSKY, Z. D., 1998, A quantitative approach to estimate the size of the time buffers in the theory of constraints. International Journal of Production Economics, 55, 113–119.
  • RAHMAN, S., 1998, Theory of Constraints: a review of the philosophy and its applications. International Journal of Operations and Production Management, 18, 336–355.
  • SCHRAGENHEIM, E. and RONEN, B., 1990. Drum-Buffer-Rope shop floor control. Production and Inventory Management Journal, Third Quarter, 18–23.
  • SEGAL, M. and WHITT, W., 1989, A queueing network analyser for manufacturing. Proceedings of the 12th International Teletraffic Conference, Turin, Italy, pp. 1146–1152.
  • SRIKANTH, M. L. and UMBLE, M. M., 1997, Synchronous Management: Profit Based Manufacturing for the 21st Century, Vol. 1 (Guilford: Spectrum). p 235–298.
  • Tu, Y. M. and LI, R. K., 1998, Constraint time buffer determination model. International Journal of Production Research, 36, 1091–1103.
  • WHITT, W., 1983, The queueing network analyzer. Bell System Technical Journal, 62, 2779–2815.
  • WHITT, W., 1993, Approximations for the GI/G/m queue. Production and Operations Management, 2, 114–161.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.