77
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

A machine survival time-based maintenance workforce allocation model for production systems

&

References

  • Ahire, S., G. Greenwood, A. Gupta, and M. Terwilliger. 2000. “Workforce-constrained Preventive Maintenance Scheduling Using Evolution Strategies.” Decision Science Journal 31 (4): 833–859. doi: 10.1111/j.1540-5915.2000.tb00945.x
  • Belmokaddem, M., M. Mekidiche, and A. Sahed. 2008. “Application of a Fuzzy Goal Programming Approach with Different Importance and Priorities to Aggregate Production Planning." Journal of Applied Quantitative Methods 4 (3): 317–331.
  • Caretto, L. 2010. “Notes on Engineering Economic Analysis.” Accessed July 24, 2015. http://csun.edu/~lcaretto/me483/engrEcon.pdf.
  • Engelbrecht, A. P. 2007. Computational Intelligence: An Introduction. 2nd ed. West Sussex: John Wiley & Sons Ltd.
  • Ighravwe, D. E., and S. A. Oke. 2014. “A Nonzero Integer non-Linear Programming Model for Maintenance Workforce Sizing.” International Journal of Production Economics 150: 204–214. doi: 10.1016/j.ijpe.2014.01.004
  • Ighravwe D.E. and Oke S.A. 2016. Maintenance Workforce Performance Enhancement in a Fuzzy Environment with Multiplicity of Criteria in Manufacturing System. Suranaree Journal of Science and Technology 23 (2): 91–107.
  • Ighravwe, D. E., S. A. Oke, and K. A. Adebiyi. 2015. “Maintenance Workload Optimisation with Accident Occurrence Considerations and Absenteeism from Work Using a Genetic Algorithm.” International Journal of Management Science and Engineering Management. 11 (4): 294–302. doi:10.1080/17509653.2015.1065208.
  • Janiak, A., and M. Lichtenstein. 2011. “Advanced Algorithms in Combinatorial Optimisation.” Printpap Lodz, Germany.
  • Kardas, K. 2012. “Evaluation of Efficiency of Working Time of Equipment in Blast Furnace Department.” Journal of Achievement in Materials and Manufacturing Engineering 55 (2): 876–880.
  • Ledesma, S., G. Avina, and R. Sanchez. 2008. “Practical Considerations for Simulated Annealing Implementation.” In: Simulated Annealing, edited by C. M. Tan, 401–420. Vienna: I-Tech Education and Publishing. Accessed July 22, 2015. http://www.intechopen.com/books/simulated_annealing/practical_considerations_for_simulated_annealing_implementation.
  • Mansour, M.A.A-F. 2011. “Solving the Periodic Maintenance Scheduling Problem via Genetic Algorithm to Balance Workforce Levels and Maintenance Cost.” American Journal of Engineering and Applied Sciences 4(2): 223–234. doi: 10.3844/ajeassp.2011.223.234
  • Parida, A., and U. Kumar. 2009. “Maintenance Productivity and Performance Measurement.” In: Handbook of Maintenance Management and Engineering, edited by M. Ben-Daya, S. O. Duffuaa, A. Raouf, J. Knezevic, and D. Ait-Kadi, 17–42. London: Springer Verlag.
  • Rodrigues, M., and K. Hatakeyama. 2006. “Analysis of the Fall of TPM in Companies.” Journal of Materials Processing Technology 179 (1–3): 276–279. doi: 10.1016/j.jmatprotec.2006.03.102
  • Safaei, N., D. Banjevic, and A. K. S. Jardine. 2008. “Multi-objective Simulated Annealing for A Maintenance Workforce Scheduling Problem: A Case Study.” In: Simulated Annealing, edited by C. M. Tan, 27–48. Vienna, Austria: I-Tech Education and Publishing.
  • Sarker, B. R., and T. I. Faiz. 2016. “Minimising Maintenance Cost for Offshore Wind Turbines Following Multi-Level Opportunistic Preventive Strategy.” Renewable Energy 85: 104–113. doi: 10.1016/j.renene.2015.06.030
  • Shemshadi, A., H. Shirazi, M. Toreihi, and M. J. Tarokh. 2011. “A Fuzzy VIKOR Method for Supplier Selection Based on Entropy Measure for Objective Weighting.” Expert Systems and Application 38: 12160–12167. doi: 10.1016/j.eswa.2011.03.027
  • Storn, R., and K. Price. 1997. “Differential Evolution: A Simple and Efficient Heuristic for Global Optimisation Over Continuous Spaces.” Journal of Global Optimisation 11: 341–359. doi: 10.1023/A:1008202821328

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.