201
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

Key success factors of collaborative planning processes

&
Pages 154-164 | Received 26 Nov 2013, Accepted 04 Sep 2014, Published online: 08 Oct 2014

References

  • AIA (2009) Experiences in Collaboration: On the Path to IPD, American Institute of Architects California Council, p. 5.
  • van Aken, J. (2003) On the Design of Design Process in Architecture and Engineering: Technological Rules and the Principle of Minimal Specification, Working Paper, Eindhoven Centre for Innovation Studies.
  • Alshuwaikhat, H.M. and Abubakar, I. (2008) An integrated approach to achieving campus sustainability: assessment of the current campus environmental management practices. Journal of Cleaner Production, 16(16), 1777–1785. doi: 10.1016/j.jclepro.2007.12.002
  • Anumba, C.J., Baugh, C. and Khalfan, M.M.A. (2002) Organisational structures to support concurrent engineering in construction. Industrial Management & Data Systems, 102(5), 260–270. doi: 10.1108/02635570210428294
  • Costa, P.T., Jr. and McCrae, R.R. (1992) Revised NEO Personality Inventory (NEO-PI-R) and NEO Five-Factor Inventory (NEO-FFI) Manual, Psychological Assessment Resources, Odessa, FL.
  • Cummings, J.N. (2004) Work groups, structural diversity, and knowledge sharing in a global organization. Management Science, 50(3), 352–364. doi: 10.1287/mnsc.1030.0134
  • Dewulf, G. and Kadefors, A. (2012) Collaboration in public construction—contractual incentives, partnering schemes and trust. Engineering Project Organization Journal, 2(4), 240–250. doi: 10.1080/21573727.2012.684876
  • Driskell, J.E., Hogan, R. and Salas, E. (1987) Personality and group performance, in Hendrick, C. (ed.) Group Process and Intergroup Relations, Review of Personality and Social Psychology, Vol. 9, Sage Publications, Thousand Oaks, CA, pp. 91–113.
  • Faniran, O.O., Love, P.E.D., Treloar, G. and Anumba, C.J. (2001) Methodological issues in design-construction integration. Logistics Information Management, 14(5/6), 421–428. doi: 10.1108/EUM0000000006254
  • Hartmann, A. and Bresnen, M. (2011) The emergence of partnering in construction practice: an activity theory perspective. Engineering Project Organization Journal, 1(1), 41–52. doi: 10.1080/21573727.2010.549609
  • Heiselberg, P., Brohus, H., Hesselholt, A., Rasmussen, H., Seinre, E. and Thomas, S. (2009) Application of sensitivity analysis in design of sustainable buildings. Renewable Energy, 34(9), 2030–2036. doi: 10.1016/j.renene.2009.02.016
  • Hsu, W. and Liu, B. (2000) Conceptual design: issues and challenges. Computer-Aided Design, 32(14), 849–850.
  • IWHBD (2008) Integrated Whole Building Design Guidelines, New Zealand Government, Ministry for the Environment, available at www.mfe.govt.nz (accessed 26 November 2013).
  • Jassawalla, A.R. and Sashittal, H.C. (1998) An examination of collaboration in high-technology new product development processes. Journal of Product Innovation Management, 15(3), 237–254. doi: 10.1016/S0737-6782(97)00080-5
  • Khalfan, M.M.A., Anumba, C.J., Siemieniuch, C.E. and Sinclair, M.A. (2001) Readiness assessment of the construction supply chain for concurrent engineering. European Journal of Purchasing & Supply Management, 7(2), 141–153. doi: 10.1016/S0969-7012(00)00023-X
  • Kichuk, S.L. and Wiesner, W.H. (1997) The Big Five personality factors and team performance: implications for selecting successful product design teams. Journal of Engineering and Technology Management, 14(3–4), 195–221. doi: 10.1016/S0923-4748(97)00010-6
  • Kovacic, I. and Müller, C. (2011) Collaborative planning practice for sustainable buildings—a case study research, in People, Buildings and Environment, Conference Proceedings, Vol. 2, Lednice, Czech Republic, 7–9 November 2012.
  • Kovacic, I. and Sreckovic, M. (2012) Designing the planning processes for sustainable buildings: from experiment towards implementation. Engineering Project Organization Journal, 3(1), 51–63. doi: 10.1080/21573727.2012.760155
  • Kovacic, I., Filzmoser, M., Faatz, S. and Koeszegi, S.T. (2011) Costs and benefits of integrated planning: first experiment results. Organization, Technology and Management in Construction, 3(1), 254–263.
  • Lahdenperä, P. (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(1), 57–79. doi: 10.1080/01446193.2011.648947
  • Love, P.E.D., Mistry, D. and Davis, P.R. (2010) Price competitive alliance projects: identification of success factors for public clients. Journal of Construction Engineering and Management, 136(9), 947–956. doi: 10.1061/(ASCE)CO.1943-7862.0000208
  • Nofera, W. and Korkmaz, S. (2010) Design process integration for sustainable, high performance buildings, in Working Paper Proceedings Engineering Project Organizations Conference, South Lake Tahoe, CA, 4–7 November 2010.
  • Pennell, J.P. and Winner, R.I. (1989) Concurrent engineering: practices and prospects, in Global Telecommunications Conference, 1989, and Exhibition. Communications Technology for the 1990s and Beyond, GLOBECOM '89, IEEE, Vol. 1, pp. 647–655.
  • Prins, M. and Owen, R. (2010) Integrated design and delivery solutions. Architectural Engineering and Design Management, 6(4), 227–231. doi: 10.3763/aedm.2010.IDDS0
  • Rohracher, H. (2001) Managing the technological transition to sustainable construction of buildings: a socio-technical perspective. Technology Analysis & Strategic Management, 13(1), 137–150. doi: 10.1080/09537320120040491
  • Russell-Smith, S.V., Lepech, M.D., Fruchter, R. and Meyer, Y.B. (2014) Sustainable target value design: integrating life cycle assessment and target value design to improve building energy and environmental performance. Journal of Cleaner Production, available at http://dx.doi.org/10.1016/j.jclepro.2014.03.025
  • Smith, R.P. and Eppinger, S.D. (1998) Deciding between sequential and concurrent tasks in engineering design. CE (Concurrent Engineering): Research and Application, 6(1), 15–25.
  • Sturts Dossick, C. and Neff, G. (2011) Messy talk and clean technology: communication, problem-solving and collaboration using building information modelling. Engineering Project Organization Journal, 1(2), 83–93. doi: 10.1080/21573727.2011.569929
  • Thompson, J.D. (1967) Organizations in Action, McGraw-Hill, New York.
  • Wang, L., Shen, W., Xie, H., Neelamkavil, J. and Pardasani, A. (2002) Collaborative conceptual design—state of the art and future trends. Computer-Aided Design, 34(13), 981–996. doi: 10.1016/S0010-4485(01)00157-9

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.