References
- Andersen, T. L., J. W. Van der Meer, H. F. Burcharth, and S. Sigurdarson. 2012, October. Stability of hardly reshaping berm breakwaters. In International Conference on Coastal Engineering Proceedings of the Internatiuonal Conference on Coastal Engineering. American Society of Civil Engineers, Santander, Spain.
- Burcharth, H. F. 2013. “On Front Slope Stability of Berm Breakwaters.” Coastal Engineering 77: 71–76. doi:10.1016/j.coastaleng.2013.02.005.
- Breteler, M. K., and A. Bezuijen. 1998. “Design Criteria for Placed Block Revetments.” In Dikes And. Revetments: Design, Maintenance and Safety Assessment, edited by K. W. Pilarczyk, 217–248. Rotterdam, the Netherlands: AA Balkema.
- Dai, Y. B., and A. M. Kamel. 1969. Scale Effect Tests for Rubble-mound Breakwaters, U. S. Army Washington, D. C. Research Report H-69-2, Vicksburg, MS: U. S. Army Engineer Waterways Experiment Station, Corps of Engineers.
- Dijkstra, O. P. J., 2008. “Armour Stability on a Bermed Slope Breakwater,” M. Sc. thesis, Delft University of Technology, Delft.
- Dorst, K., et al. 2011. Stability of Pattern Placed Revetment Blocks. World association for waterborne transport infrastructure
- Karthika, P., E.-S. Amir, and L. Charles. 2017. “Wave Overtopping at Berm Breakwaters: Experimental Study and Development of Prediction Formula.” Coastal Engineering 130: 85–102. doi:10.1016/j.coastaleng.2017.10.004.
- Mansard, E. P. D., and E. R. Funke, 1980. “The Measurement of Incident and Reflected Spectra Using a Least-square Method.” Proc. International Conference on Coastal Engineering (ICCE 1980). ASCE, pp. 154–172.
- Pan, S. H. 1995. “Stability of Placed Stone Revetment under Wave Action.” Journal of Hohai University 23: 1–6. in Chinese.
- Pilarczyk, K. W., 1998. “Design Philosophy and Methodology.” In Dikes And. Revetments: Design, Maintenance and Safety Assessment, edited by K. W. Pilarczyk, 11–36. Rotterdam, the Netherlands: AA Balkema.
- Sun, J. S., and J. Zhang. 1985. “Prospect of Seabee Blocks.” Costal Engineering 2: 109-118. in Chinese.
- Tørum, A., M. N. Moghim, K. Westeng, N. Hidayati, and Ø. Arntsen. 2012. “On Berm Breakwaters: Recession, Crown Wall Wave Forces, Reliability.” Coastal Engineering 60: 299–318. doi:10.1016/j.coastaleng.2011.11.003.
- Van der Meer, J. W. 1998. “Wave Run-up and Overtopping.” In Dikes and Revetments: Design, Maintenance and Safety Assessment, edited by K. W. Pilarczyk, 145–159. Rotterdam, the Netherlands: AA Balkema.
- Van Gent, M. R. A. 1995. “Wave Interaction with Berm Breakwaters.” Journal of Waterway, Port, Coastal, and Ocean Engineering 121 (5): 229–238. (ASCE, New York). doi:10.1061/(ASCE)0733-950X(1995)121:5(229).
- Van Gent, M. R. A. 2013. “Rock Stability of Rubble Mound Breakwaters with a Berm.” Coastal Engineering 78: 35–54. doi:10.1016/j.coastaleng.2013.03.003.
- Xue, H. C. 1982. “The Stability of Slope Embankment Retaining Blocks under Wave Action.” Journal of East China Water Conservancy College 3: 1-10. in Chinese.
- Zhang, Q. F., and G. P. Chen. 2011. “Uplift Forces of Armoring Concrete Slab with Different Porosity.” Port & Waterway Engineering 11: 2–57. in Chinese.