195
Views
4
CrossRef citations to date
0
Altmetric
Articles

Exploring a production-inventory model with optimal reliability of the production in a parallel-series system

, &
Pages 71-86 | Received 01 Feb 2019, Accepted 02 Feb 2020, Published online: 26 Mar 2020

References

  • Gupta RK, Bhunia AK, Roy D. A GA based penalty function technique for solving constrainedredundancy allocation problem of series system with interval valued reliability of components. J Comput Appl Math. 2009;232(2):275–284.
  • Wang Z, Chen T, Tang K, et al. A multi-objective approach to redundancy allocation problem in parallel-series systems. IEEE Conf Evol Comput. 2009;582–589.
  • Mahato SK, Sahoo L, Bhunia AK. Reliability-redundancy optimization problem with interval valued reliabilities of components via genetic algorithm. J Inf Comput Sci. 2012;7(4):284–295.
  • Garg H, Sharma SP. Reliability-redundancy allocation problem of pharmaceutical plant. J Eng Sci Technol. 2013a;8(2):190–198.
  • Sahoo L, Bhunia AK, Roy D. Reliability optimization with high and low level redundancies in interval environment via genetic algorithm. Int J Syst Assur Eng Manage. 2014;5(4):513–523.
  • Chambari A, Sadeghi J, Bakhtiari F, et al. A note on a reliability redundancy allocation problem using a tuned parameter genetic algorithm. OPSEARCH. 2016;53(2):426–442.
  • Kim H, Kim P. Reliability-redundancy allocation problem considering optimal redundancy strategy using parallel genetic algorithm. Reliab Eng Syst Saf. 2017;159:153–160.
  • Zheng T, Huang M, Liu Y, et al. Reliability model of bond wire fatigue for IGBT in MMC with system redundancy consideration. Microelectron Reliab. 2018;80–90:1164–1167.
  • Ye Z, Cai Z, Zhou F, et al. Reliability analysis for series manufacturing system with imperfect inspection considering the interaction between quality and degradation. Reliab Eng Syst Saf. 2019;189:345–356.
  • Mousavi SM, Alikar N, Tavana M. An improved particle swarm optimization model for solving homogeneous discounted series-parallel redundancy allocation problems. J Intell Manuf. 2019;30(3):1175–1194.
  • Sahoo L, Bhunia AK, Kapur PK. Genetic algorithm based multi-objective reliability optimization in interval environment. Comput Ind Eng. 2012;62(1):152–160.
  • Garg H, Sharma SP. Multi-objective reliability-redundancy allocation problem using particle swarm optimization. Comput Ind Eng. 2013b;64(1):247–255.
  • Garg H. Fuzzy multiobjective reliability optimization problem of industrial systems using particle swarm optimization. J Ind Math. 2013c;2013:1–9.
  • Muhuri PK, Ashraf Z, Danish Lohani QM. Multiobjective reliability redundancy allocation problem with interval type-2 fuzzy uncertainty. IEEE Trans Fuzzy Syst. 2017;26(3):1339–1355.
  • Das BC, Das B, Mondal SK. Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period. Transp Res E Logist Transp Rev. 2014;68:1–13.
  • Betts JM. Minimizing inventory costs for capacity-constrained production using a hybrid simulation model. Procedia Comput Sci. 2014;29:759–768.
  • Sadeghi J, Niaki STA. Two parameter tuned multi-objective evolutionary algorithms for a bi-objective vendor managed inventory model with trapezoidal fuzzy demand. Appl Soft Comput. 2015;30:567–576.
  • Das BC, Das B, Mondal SK. An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets. Appl Soft Comput. 2015;28:453–465.
  • Manna AK, Das B, Dey JK, et al. Multi-item EPQ model with learning effect on imperfect production over fuzzy-random planning horizon. J Manage Anal. 2016. DOI:10.1080/23270012.2016.1217755
  • Manna AK, Dey JK, Mondal SK. Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J Ind Prod Eng. 2017b. DOI:10.1080/21681015.2017.1415230
  • Tsou CS, Kao C,H. Multi-objective inventory control using electromagnetism-like meta-heuristic. Int J P Res. 2008;6(14):3859–3874.
  • Rahimi M, Baboli A, Rekik Y. Multi-objective inventory routing problem: A stochastic model to consider profit, service level and green criteria. Transp Res E Logist Transp Rev. 2017;101:59–83.
  • Manna AK, Dey JK, Mondal SK. Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int J Syst Sci Oper Logist. 2018. DOI:10.1080/23302674.2018.1479802
  • Sadeghi J, Sadeghi S, Niaki STA. A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: an NSGA-II with tuned parameters. Comput Oper Res. 2014;41(1):53–64.
  • Alikar N, Mousavi SM, Ghazilla RAR, et al. A bi-objective multi-period series-parallel inventory-redundancy allocation problem with time value of money and inflation considerations. Comput Ind Eng. 2017;104:51–67.
  • Manna AK, Dey JK, Mondal SK. Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput Ind Eng. 2017a;104:9–22.
  • Deb K. Multi-objective optimization using evolutionary algorithms. New York, NY: John Wiley and Sons, Inc.; 2001. ( ISBN:047187339X).
  • Kim H, Liou MS. New fitness sharing approach for multi-objective genetic algorithms. J Global Optim. 2013;55(3):579–595.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.