Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review

ORCID Icon, ORCID Icon, ORCID Icon & ORCID Icon
Article: 2319574 | Received 06 Oct 2023, Accepted 10 Feb 2024, Published online: 21 Feb 2024

References

  • Abdzadeh, B., Noori, S., & Farid Ghannadpour, S. (2022). Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing. Automation in Construction, 140(August), 1–33. https://doi.org/10.1016/j.autcon.2022.104336
  • Amiri, T., Javad, M., Haghighi, F., Eshtehardian, E., & Abessi, O. (2018). Multi-project time-cost optimization in critical chain with resource constraints. KSCE Journal of Civil Engineering, 22(10), 3738–3752. https://doi.org/10.1007/s12205-017-0691-x
  • Ben Issa, S., Patterson, R. A., & Yiliu, T. (2021). Solving resource-constrained multi-project environment under different activity assumptions. International Journal of Production Economics, 232(February), 107936. https://doi.org/10.1016/j.ijpe.2020.107936
  • Ben Issa, S., & Yiliu, T. (2020). A survey in the resource-constrained project and multi-project scheduling problems. Journal of Project Management, 117–138. https://doi.org/10.5267/j.jpm.2019.11.001
  • Besikci, U., Bilge, Ü., & Ulusoy, G. (2013). Resource dedication problem in a multi-project environment. Flexible Services and Manufacturing Journal, 25(1–2), 206–229. https://doi.org/10.1007/s10696-012-9140-9
  • Besikci, U., Ulusoy, G., & Bilge, U. (2013). A combination of different resource management policies in a multi-project environment. In International Conference on Industrial Engineering and Systems Management, Agdal, Morocco.
  • Bredael, D., & Vanhoucke, M. (2023). Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates. European Journal of Operational Research, 308(1), 54–75. https://doi.org/10.1016/j.ejor.2022.11.009
  • Can, A., & Ulusoy, G. (2014). Multi-project scheduling with two-stage decomposition. Annals of Operations Research, 217(1), 95–116. https://doi.org/10.1007/s10479-014-1555-0
  • Capa, C., & Ulusoy, G. (2015). Proactive project scheduling in an R&D department a bi-objective genetic algorithm. In 2015 International Conference on Industrial Engineering and Operations Management (IEOM) (pp. 1–6). IEEE. https://doi.org/10.1109/IEOM.2015.7093733.
  • Chen, J. C., Chen, Y.-Y., Chen, T.-L., & Lin, Y.-H. (2022). Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer. Computers & Industrial Engineering, 169(July), 108240. https://doi.org/10.1016/j.cie.2022.108240
  • Chen, H., Ding, G., Zhang, J., & Qin, S. (2019). Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival. Computers & Industrial Engineering, 137(November), 106060. https://doi.org/10.1016/j.cie.2019.106060
  • Chen, H., Ding, G., Zhang, J., Rong, L., Jiang, L., & Qin, S. (2022). A Filtering genetic programming framework for stochastic resource constrained multi-project scheduling problem under new project insertions. Expert Systems with Applications, 198(July), 116911. https://doi.org/10.1016/j.eswa.2022.116911
  • Cheng, C. B., & Lo, C. Y. (2017). Multi-project scheduling by fuzzy combinatorial auction. In 2017 3rd IEEE International Conference on Cybernetics (CYBCONF) (pp. 1–6). IEEE. https://doi.org/10.1109/CYBConf.2017.7985794
  • Cheng, C. B., Lo, C. Y., & Chu, C. P. (2019). Solving multi-mode resource-constrained multi-project scheduling problem with combinatorial auction mechanisms. International Journal of Information and Management Sciences, 30(2), 143–167. https://doi.org/10.6186/IJIMS.201906
  • Chen, J.-J., Zhu, J.-L., & Zhang, D.-N. (2014). Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient. In 2014 International Conference on Management Science & Engineering 21st Annual Conference Proceedings (pp. 1012–1018). IEEE. https://doi.org/10.1109/ICMSE.2014.6930339.
  • Cooper, H. (1986). The integrative research review: A systematic approach sage publications: Beverly Hills, 1984, 143 pp. Educational Researcher, 15(8), 17–18. https://doi.org/10.3102/0013189X015008017
  • Cruz, A., Anabela, T., Carvalho, A. (2020). Traditional, agile and lean project management. Journal of Modern Project Management, 8(1). https://doi.org/10.19255/JMPM02407
  • Cui, L., Liu, X., Shaojun, L., & Jia, Z. (2021, August). A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem. Applied Soft Computing, 107, 107480. https://doi.org/10.1016/j.asoc.2021.107480
  • Drucker, A. M., Fleming, P., & Chan, A.-W. (2016). Research techniques made simple: Assessing risk of bias in systematic reviews. Journal of Investigative Dermatology, 136(11), e109–e114. https://doi.org/10.1016/j.jid.2016.08.021
  • Dulai, T., Dósa, G., & Werner-StarK, Á. (2018). Multi-project optimization with multi-functional resources by a genetic scheduling algorithm. Acta Polytechnica Hungarica, 15(4), 101–119. https://doi.org/10.12700/APH.15.4.2018.4.6
  • Dybä, T., & Dingsöyr, T. (2008). Strength of evidence in systematic reviews in software engineering. In Proceedings of the Second ACM-IEEE International Symposium on Empirical Software Engineering and Measurement. Association for Computing Machinery, Kaiserslautern, Germany (pp. 178–187).
  • ElFiky, H., Owida, A., & Galal, N. M. (2020). Resource constrained multi-project scheduling using priority rules: Application in the deep-water construction industry. In Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, UAE (pp. 353–363).
  • Fang, F., & Zhou, H. (2021). A combined multi-agent system for distributed multi-project scheduling problems. Applied Soft Computing, 107(August), 107402. https://doi.org/10.1016/j.asoc.2021.107402
  • Farizal, F., Rachman, A., Tandean, T., Sudarto, S., & Takahashi, K. (2016). Multi-project scheduling cost optimization in a machine manufacturer engineer-to-order. Makara Journal of Technology, 20(1), 13. https://doi.org/10.7454/mst.v20i1.3050
  • Feifei, L., Zhe, X., & Haitao, L. (2021). A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation. Computers & Industrial Engineering, 151(January), 106961. https://doi.org/10.1016/j.cie.2020.106961
  • Geiger, M. J. (2017). A Multi-Threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem. European Journal of Operational Research, 256(3), 729–741. https://doi.org/10.1016/j.ejor.2016.07.024
  • Ghani, I., & Yasin, I. (2013). Software security engineering in extreme programming: Methodology: A systematic literature review REVIEW. Science International, 25(2), 215–221.
  • Gholizadeh Tayyar, S., Lamothe, J., & Dupont, L. (2016). Genetic algorithm for generalized resource constrained multi project scheduling problem integrated with closed loop supply chain planning. In 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 1683–1687). IEEE. https://doi.org/10.1109/IEEM.2016.7798164.
  • Ghoroqi, M., Ghoddousi, P., Makui, A., Akbar Shirzadi Javid, A., & Talebi, S. (2023). An integrated model for multi-mode resource-constrained multi-project scheduling problems considering supply management with sustainable approach in the construction industry under uncertainty using evidence theory and optimization algorithms. Buildings, 13(8), 2023. https://doi.org/10.3390/buildings13082023
  • González, G., Calderón, C., González, D., & Trujillo, J. (2017). Priority rules performance analysis as a GA initial population for RCMPSP. In Proceedings of the International Conference on Industrial Engineering and Operations Management Bogota, Colombia.
  • Hauder, V. A., Beham, A., Raggl, S., Parragh, S. N., & Affenzeller, M. (2020). Resource-constrained multi-project scheduling with activity and time flexibility. Computers & Industrial Engineering, 150(December), 1–14. https://doi.org/10.1016/j.cie.2020.106857
  • Hematian, M., Mehdi Seyyed Esfahani, M., Mahdavi, I., Mahdavi‐Amiri, N., & Rezaeian, J. (2020). A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty. Computational Intelligence, 36(1), 276–296. https://doi.org/10.1111/coin.12260
  • Howard, D. M.,Adams, M. J.,Clarke, T.-K.,Hafferty, J. D., Gibson, J.,Shirali, M., Coleman, J. R. I., Hagenaars, S. P., Ward ,J., Wigmore, E. M., Alloza, C., Shen, X., Barbu, M. C., Xu, E. Y., Whalley, H. C., Marioni, R. E., Porteous, D. J., Davies, G., Deary, I. J., Hemani, G.,Berger, K. (2019).Genome-Wide Meta-Analysis of depression identifies 102 independent variants and highlights the importance of the prefrontal brain regions.Nature Neuroscience, 22(3),343–352.https://doi.org/10.1038/s41593-018-0326-7
  • Javanmard, S., Afshar-Nadjafi, B., & AkhavanNiaki, S. (2021, March). A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage. Operational Research, 22(3), 2245–2280. https://doi.org/10.1007/s12351-021-00633-6
  • Jędrzejowicz, P., & Ratajczak-Ropel, E. (2019). A-Team solving distributed resource-constrained multi-project scheduling problem. Vietnam Journal of Computer Science, 6(4), 423–437. https://doi.org/10.1142/S2196888819500234
  • Jiang, C., Xiaofeng, H., & Juntong, X. (2019). A hybrid algorithm of product-service framework for the multi-project scheduling in ETO assembly process. Procedia CIRP, 83, 298–303. https://doi.org/10.1016/j.procir.2019.04.078
  • Joo, B. J., & Chua, P. C. (2017). Multimode resource-constrained multi-project scheduling with ad hoc activity splitting. In 2017 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) (pp. 2261–2265). IEEE. https://doi.org/10.1109/IEEM.2017.8290294.
  • Kebede, R., Moscati, A., & Johansson, P. (2020). Semantic web and linked data for information exchange between the building and product manufacturing industries: A literature review. 248–265. https://doi.org/10.46421/2706-6568.37.2020.paper018
  • Klevanskiy, N. N., Tkachev, S. I., & Voloshchouk, L. A. (2019). Multi-project scheduling: multicriteria time-cost trade-off problem. Procedia Computer Science, 150, 237–243. https://doi.org/10.1016/j.procs.2019.02.048
  • Korotkov, V., & Matveev, M. (2020). Individual scheduling for the multi-mode Resource_Constrained multi-project scheduling problem. In CEUR Workshop Proceedings, Aachen, Germany.
  • Kühn, M., Dirkmann, S., Völker, M., & Schmidt, T. (2016). A decomposition method for the multi-mode resource-constrained multi-project scheduling problem (MRCMPSP). In Operations Research Proceedings.
  • Kühn, M., Völker, M., & Schmidt, T. (2020). An algorithm for efficient generation of customized priority rules for production control in project manufacturing with stochastic job processing times. Algorithms, 13(12), 337. https://doi.org/10.3390/a13120337
  • Kühn, M., Zahid, T., Völker, M., Völker, Z., & Rose, O. (2016). Investigation of genetic operators and priority heuristics for simulation based optimization of multi-mode resource constrained multi-project scheduling problems (MMRCMPSP). In Proceedings 30th European Conference on Modelling and Simulation, Regensburg, Germany.
  • Liberati, A. (2009). The PRISMA statement for reporting systematic reviews and meta-analyses of studies that evaluate health care interventions: Explanation and elaboration. Annals of Internal Medicine, 151(4), W. https://doi.org/10.7326/0003-4819-151-4-200908180-00136
  • Li, S.-L., Dong, X.-Y., & Han, S. (2017). Research on a multi-project scheduling optimization algorithm with resource time-windows. In 2nd International Conference on Computational Modeling, Simulation and Applied Mathematics, Beijing, Chin.
  • Lima, R., Tereso, A., & Faria, J. (2019). Project management under uncertainty: Resource flexibility visualization in the schedule. Procedia Computer Science, 164, 381–388. https://doi.org/10.1016/j.procs.2019.12.197
  • Liu, Y., Cheng, H., & Liu, C. (2022). Optimization of construction program schedule plans based on multi-objective optimization theory. Iranian Journal of Science & Technology, Transactions of Civil Engineering, 46(6), 4763–4782. https://doi.org/10.1007/s40996-022-00865-2
  • Liu, J., & Ming, L. (2019). Robust dual-level optimization framework for resource-constrained multiproject scheduling for a prefabrication facility in construction. Journal of Computing in Civil Engineering, 33(2), 04018067. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000816
  • Liu, M., Shan, M., & Juan, W. (2014). Multiple R&D projects scheduling optimization with improved particle swarm algorithm. The Scientific World Journal, 2014, 1–7. https://doi.org/10.1155/2014/652135
  • Liu, D., & Zhe, X. (2020). A multi-PR heuristic for distributed multi-project scheduling with uncertain duration. IEEE Access, 8, 227780–227792. https://doi.org/10.1109/ACCESS.2020.3045713
  • Liu, D., Zhe, X., & Feifei, L. (2021). A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty. Computers & Industrial Engineering, 160(October), 107553. https://doi.org/10.1016/j.cie.2021.107553
  • Li, F., & Zhe, X. (2018). A multi-agent system for distributed multi-project scheduling with two-stage decomposition. In B. Xin (Ed.), PLOS ONE 13(10), e0205445. https://doi.org/10.1371/journal.pone.0205445
  • Madan, M., & Gnanendran, K. (2020, July). Course planning in educational programs: A project management approach. Operations and Supply Chain Management: An International Journal, 349–358. https://doi.org/10.31387/oscm0430275
  • Maenhout, B., & Vanhoucke, M. (2016). An exact algorithm for an integrated project staffing problem with a homogeneous workforce. Journal of Scheduling, 19(2), 107–133. https://doi.org/10.1007/s10951-015-0443-z
  • Maher, G., Abd-El-Roaf, O., El-Hefnawy, N., & Kfafy, A. (2019). A novel approach for multi-resource planning in construction engineering.” In 2019 Ninth International Conference on Intelligent Computing and Information Systems (ICICIS) (pp. 278–284). IEEE. https://doi.org/10.1109/ICICIS46948.2019.9014772.
  • Marimuthu, K., Raphael, B., Ananthanarayanan, K., Palaneeswaran, E., & Bodaghi, B. (2017). An overview of multi-project scheduling problems in India with resource constrained and unconstrained settings. In Proceedings of the 22nd International Conference on Advancement of Construction Management and Real Estate, Melbourne, Victoria, Australia (pp. 988–995). CRIOCM 2017 Organising Committee.
  • Masmoudi, M., & Haiit, A. (2014). Fuzzy resource constraint project scheduling problem. Journal of Financial Stability, 26(1), 1–18.
  • Mihály, K., Kulcsárné Forrai, M., & Kulcsár, G. (2018). New multi-objective methods to solve resource-constraint multi-project scheduling problems in integrated ERP-APS systems. IOP Conference Series: Materials Science and Engineering, 448, 012033. https://doi.org/10.1088/1757-899X/448/1/012033
  • Musaab Falih, H., & Rasheed, M. S. (2022). Time and finance optimization model for multiple construction projects using genetic algorithm. Journal of the Mechanical Behavior of Materials, 31(1), 267–281. https://doi.org/10.1515/jmbm-2022-0032
  • Nabipoor Afruzi, E., Aghaie, A., & Najafi, A. (2018). Robust Optimization for the Resource Constrained Multi-Project Scheduling Problem with Uncertain Activity Durations. Scientia Iranica, 17(1), 361–376. https://doi.org/10.24200/sci.2018.20801
  • Nie, H., & Liu, B. (2013). Combining MILP with memetic algorithm for scheduling and staffing construction project with a multi-skilled workforce. In 2013 International Conference on Computational and Information Sciences (pp. 1150–1153). IEEE. https://doi.org/10.1109/ICCIS.2013.305.
  • Okada, I., Weng, W., Yang, W., & Fujimura, S. (2016). A genetic algorithm with local search using activity list characteristics for solving resource‐constrained multiproject scheduling problem. IEEJ Transactions on Electrical and Electronic Engineering, 11, S2. https://doi.org/10.1002/tee.22324
  • Papaioannou, D., Sutton, A., & Booth, A. (2016). Systematic approaches to a successful literature review. Sage Publications Ltd.
  • Peng, W., Lin, J., Zhang, J., & Chen, L. (2021). A Bi-objective hierarchical program scheduling problem and its solution based on NSGA-III. Annals of Operations Research, 308(1–2), 389–414. https://doi.org/10.1007/s10479-021-04106-z
  • Pérez, E., Posada, M., & Lorenzana, A. (2016). Taking advantage of solving the resource constrained Multi-Project scheduling problems using multi-modal genetic algorithms. Soft Computing, 20(5), 1879–1896. https://doi.org/10.1007/s00500-015-1610-z
  • Pritsker, A. A. B., Waiters, L. J., & Wolfe, P. M. (1969). Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), 1–148. https://doi.org/10.1287/mnsc.16.1.93
  • Rokou, E., Dermitzakis, M., & Kirytopoulos, K. (2014). Multi-project flexible resource profiles project scheduling with ant colony optimization.” In 2014 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 642–646). IEEE. https://doi.org/10.1109/IEEM.2014.7058717.
  • Rong, C., Liang, C., Dongxiao, G., & Leung, J. Y.-T. (2017). A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution. International Journal of Production Research, 55(21), 6207–6234. https://doi.org/10.1080/00207543.2017.1326641
  • Rostami, M., & Bagherpour, M. (2020). A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems. Operational Research, 20(2), 857–897. https://doi.org/10.1007/s12351-017-0358-x
  • Sadeghloo, M., Emami, S., & Divsalar, A. (2023, June). A benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty. Annals of Operations Research. https://doi.org/10.1007/s10479-023-05403-5
  • Sanchez, M. G., Fernandez Gil, A., & Castro, C. (2019). Integrating a SMT solver based local search in ant colony optimization for solving RCMPSP. In 2019 IEEE Latin American Conference on Computational Intelligence (LA-CCI) (pp. 1–6). IEEE. https://doi.org/10.1109/LA-CCI47412.2019.9036765.
  • Sánchez, G., Mariam, E. L.-R., Fernández Gil, A., Castro, C., & Voß, S. (2023). Resource-constrained multi-project scheduling problem: A survey. European Journal of Operational Research, 309(3), 958–976. https://doi.org/10.1016/j.ejor.2022.09.033
  • Santos, H. G., Soares, J., & Toffolo, T. (2014). Hybrid local search for the multi-mode resource-constrained multi-project scheduling problem. In 10th International Conference of the Practice and Theory of Automated Timetabling, New York, United Kingdom (pp. 26–29).
  • Satic, U., Jacko, P., & Kirkbride, C. (2022). Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem. International Journal of Production Research, 60(4), 1411–1423. https://doi.org/10.1080/00207543.2020.1857450
  • Sayyadi, A., Esmaeeli, H., & Hossein Hosseinian, A. (2022). A community detection approach for the resource leveling problem in a multi-project scheduling environment. Computers & Industrial Engineering, 169(July), 108202. https://doi.org/10.1016/j.cie.2022.108202
  • Shahriar, A., Karapetyan, D., Kheiri, A., Özcan, E., & Parkes, A. J. (2016). Combining monte-carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem. Information Sciences, 373(December), 476–498. https://doi.org/10.1016/j.ins.2016.09.010
  • Shi, Y., Zongzhan, D., & Jianxun, L. (2019). Hierarchy model for distributed resource constrained multi-project scheduling problem. In Proceedings of the 2019 5th International Conference on Industrial and Business Engineering (pp. 123–127). New York, NY, USA: ACM. https://doi.org/10.1145/3364335.3364363.
  • Shou, Y., Xiang, W., Ying, L., & Yao, W. (2014). A multiagent evolutionary algorithm for the resource-constrained project portfolio selection and scheduling problem. Mathematical Problems in Engineering, 2014, 1–9. https://doi.org/10.1155/2014/302684
  • Shu, X., Qiang, S., Wang, Q., & Wang, Q. (2018). Optimization of resource-constrained multi-project scheduling problem based on the genetic algorithm. In 2018 15th International Conference on Service Systems and Service Management (ICSSSM) (pp. 1–6). IEEE. https://doi.org/10.1109/ICSSSM.2018.8465086.
  • Singh, A. (2014). Resource constrained multi-project scheduling with priority rules & analytic hierarchy process. Procedia Engineering, 69, 725–734. https://doi.org/10.1016/j.proeng.2014.03.048
  • Snauwaert, J., & Vanhoucke, M. (2023). A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem. European Journal of Operational Research, 307(1), 1–19. https://doi.org/10.1016/j.ejor.2022.05.049
  • Somy, S., Shafaei, R., & Ramezanian, R. (2021, April). Resilience-based mathematical model to restore disrupted road-bridge transportation networks. Structure and Infrastructure Engineering, 18(9), 1334–1349. https://doi.org/10.1080/15732479.2021.1906711
  • Song, W., Hui, X., Kang, D., & Zhang, J. (2018). An agent-based simulation system for multi-project scheduling under uncertainty. Simulation Modelling Practice and Theory, 86(August), 187–203. https://doi.org/10.1016/j.simpat.2018.05.009
  • Song, W., Kang, D., Zhang, J., & Hui, X. (2017). A multi-unit combinatorial auction based approach for decentralized multi-project scheduling. Autonomous Agents and Multi-Agent Systems, 31(6), 1548–1577. https://doi.org/10.1007/s10458-017-9370-z
  • Sonmez, R., & Uysal, F. (2015). Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem. Journal of Computing in Civil Engineering, 29(5), 04014072. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000382
  • Stoll, C. R. T., Izadi, S., Fowler, S., Green, P., Suls, J., & Colditz, G. A. (2019). The value of a second reviewer for study selection in systematic reviews. Research Synthesis Methods, 10(4), 539–545. https://doi.org/10.1002/jrsm.1369
  • Taheri Amiri, M. J., Haghighi, F. R., Eshtehardian, E., & Abessib, O. (2017). Optimization of time, cost and quality in critical chain method using simulated annealing. International Journal of Engineering, 30(5), 627–635.
  • Thomé, A. M. T., Felipe Scavarda, L., & José Scavarda, A. (2016). Conducting systematic literature review in operations management. Production Planning & Control, 27(5), 408–420. https://doi.org/10.1080/09537287.2015.1129464
  • Tian, J., Han, X., & Dong, S. (2018). Optimizing for a resource-constrained multi-project scheduling problem with planned resource unavailability. In 3rd International Conference on Modelling, Simulation and Applied Mathematics, Shanghai, China.
  • Toffolo, T. A. M., Santos, H. G., Carvalho, M. A. M., & Soares, J. A. (2016). An integer programming approach to the multimode resource-constrained multiproject scheduling problem. Journal of Scheduling, 19(3), 295–307. https://doi.org/10.1007/s10951-015-0422-4
  • Uysal, F., Sonmez, R., & Kursat Isleyen, S. (2021). A graphical processing unit‐based parallel hybrid genetic algorithm for resource‐constrained multi‐project scheduling problem. Concurrency and Computation: Practice and Experience, 33(16). https://doi.org/10.1002/cpe.6266
  • Van Eynde, R., & Vanhoucke, M. (2020). Resource-constrained multi-project scheduling: Benchmark datasets and decoupled scheduling. Journal of Scheduling, 23(3), 301–325. https://doi.org/10.1007/s10951-020-00651-w
  • Van Eynde, R., & Vanhoucke, M. (2022). New summary measures and datasets for the multi-project scheduling problem. European Journal of Operational Research, 299(3), 853–868. https://doi.org/10.1016/j.ejor.2021.10.006
  • Vázquez, E. P., Posada Calvo, M., & Martín Ordóñez, P. (2015). Learning process on priority rules to solve the RCMPSP. Journal of Intelligent Manufacturing, 26(1), 123–138. https://doi.org/10.1007/s10845-013-0767-5
  • Villafáñez, F., Poza, D., López-Paredesa, A., Pajaresa, J., & Acebes, F. (2020). Portfolio scheduling: An integrative approach of limited resources and project prioritization. Journal of Project Management, 103–116. https://doi.org/10.5267/j.jpm.2019.12.001
  • Villafáñez, F. A., Poza, C., López-Paredes, A., & Pajares, J. (2018). Una nomenclatura unificada para problemas de programación de proyectos (RCPSP and RCMPSP). Dirección y Organización, (64), 56–60. https://doi.org/10.37610/dyo.v0i64.523
  • Villafáñez, F., Poza, D., López-Paredes, A., Pajares, J., & Del Olmo, R. (2019). A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP). Soft Computing, 23(10), 3465–3479. https://doi.org/10.1007/s00500-017-3003-y
  • Wang, X., Chen, Q., Mao, N., Chen, X., & Zhantao, L. (2015). Proactive approach for stochastic RCMPSP based on multi-priority rule combinations. International Journal of Production Research, 53(4), 1098–1110. https://doi.org/10.1080/00207543.2014.946570
  • Wang, X., Ferreira, F. A. F., & Ching-Ter, C. (2022). Multi-Objective competency-based approach to project scheduling and staff assignment: Case study of an internal audit project. Socio-Economic Planning Sciences, 81(June), 101182. https://doi.org/10.1016/j.seps.2021.101182
  • Wang, Y., Zhengwen, H., Kerkhove, L.-P., & Vanhoucke, M. (2017). On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Computers & Industrial Engineering, 114(December), 223–234. https://doi.org/10.1016/j.cie.2017.10.021
  • Wauters, T., Kinable, J., Smet, P., Vancroonenburg, W., Vanden Berghe, G., & Verstichel, J. (2016). The multi-mode resource-constrained multi-project scheduling problem. Journal of Scheduling, 19(3), 271–283. https://doi.org/10.1007/s10951-014-0402-0
  • Weixin, W., Xianlong, G., & Jiafu, S. (2019). Multi-project scheduling with multi-factor disruptions under uncertain environments. In 2019 8th International Conference on Industrial Technology and Management (ICITM) (pp. 295–300). IEEE. https://doi.org/10.1109/ICITM.2019.8710663.
  • Weixin, W., Xianlong, G., Lvcheng, L., & Jiafu, S. (2019). Proactive and reactive multi-project scheduling in uncertain environment. IEEE Access, 7, 88986–88997. https://doi.org/10.1109/ACCESS.2019.2926337
  • Weixin, W., Xu, W., Xianlong, G., Lin, Y., Yang, C., & Jia, G. (2013). Research of multi-attribute trade-off optimization on critical chain multi-project scheduling. Journal of Theoretical and Applied Information Technology, 48(2), 786–794.
  • Winklehnera, P., & Hauder, V. A. (2022). Flexible job-shop scheduling with release dates, deadlines and sequence dependent setup times: A real-world case. In 3rd International Conference on Industry 4.0 and Smart Manufacturing, Linz, Austria (pp. 1654–1663).
  • Wu, Y. N., & Ding, Y. (2015). Research on the resource-constrained government investment multi-project scheduling problems. In International Conference on Material Science and Environmental Engineering Engineering, Wuhan, China.
  • Xiaoming, F., Liqiang, Q., & Wang, F. (2017). Hybrid constrained flexible city resource scheduling scheme based on particle swarm optimization. Journal Acta Technica, 62(6B), 1447–1458.
  • Yang, D., Zhou, X., Yang, Z., Jiang, Q., & Feng, W. (2020). Multi-objective optimization model for flexible job shop scheduling problem considering transportation constraints: A comparative study. In 2020 IEEE Congress on Evolutionary Computation (CEC) (pp. 1–8). IEEE. https://doi.org/10.1109/CEC48606.2020.9185653.
  • Yan, R., Li, W., Ping Jiang, Y. Z., & Wu, G. (2014). A modified differential evolution algorithm for resource constrained multi-project scheduling problem. Journal of Computers, 9(8). https://doi.org/10.4304/jcp.9.8.1922-1927
  • Yassine, A. A., Mostafa, O., & Browning, T. R. (2017). Scheduling multiple, resource-constrained, iterative, product development projects with genetic algorithms. Computers & Industrial Engineering, 107(May), 39–56. https://doi.org/10.1016/j.cie.2017.03.001
  • Yining, Y., Zhe, X., Liu, D., & Zhao, S. (2022). A two-stage approach with softmax scoring mechanism for a multi-project scheduling problem sharing multi-skilled staff. Expert Systems with Applications, 203(October), 117385. https://doi.org/10.1016/j.eswa.2022.117385
  • Yining, Y., Zhe, X., & Zhao, S. (2023). A two-stage algorithm based on 12 priority rules for the stochastic distributed resource-constrained multi-project scheduling problem with multi-skilled staff. IEEE Access, 11, 29554–29565. https://doi.org/10.1109/ACCESS.2023.3261139
  • Yuan, P., Han, W., Xichao, S., Liu, J., & Song, J. (2018). A dynamic scheduling method for carrier aircraft support operation under uncertain conditions based on rolling horizon strategy. Applied Sciences, 8(9), 1546. https://doi.org/10.3390/app8091546
  • Yuan, P., Xiao, W., Zhengyang, L., Liang, H., & Zhao, Z. (2019). A robust optimization scheduling for carrier aircraft support operation based on critical chain method. IOP Conference Series: Materials Science and Engineering, 627(1), 012007. https://doi.org/10.1088/1757-899X/627/1/012007
  • Zhang, L., & Sun, R. (2011). An improvement of resource-constrained multi-project scheduling model based on priority-rule based heuristics. In ICSSSM11 (pp. 1–5). IEEE. https://doi.org/10.1109/ICSSSM.2011.5959321.
  • Zhao, S., & Zhe, X. (2021). New closed-loop approximate dynamic programming for solving stochastic decentralized multi-project scheduling problem with resource transfers. Expert Systems with Applications, 185(December), 115593. https://doi.org/10.1016/j.eswa.2021.115593
  • Zheng, Z., Shumin, L., Guo, Z., & Yueni, Z. (2013). Resource-constraint multi-project scheduling with priorities and uncertain activity durations. International Journal of Computational Intelligence Systems, 6(3), 530. https://doi.org/10.1080/18756891.2013.789152
  • Zhu, H., Zhiqiang, L., Chenyao, L., & Ren, Y. (2021). Modeling and algorithm for resource-constrained multi-project scheduling problem based on detection and rework. Assembly Automation, 41(2), 174–186. https://doi.org/10.1108/AA-09-2020-0132
  • Zhu, H., Zhiqiang, L., & Xinming, H. (2018). A modified heuristic algorithm for resource constrained multi-project scheduling problem based on inspection and rework. In 2018 IEEE 14th International Conference on Automation Science and Engineering (CASE) (pp. 1058–1063). IEEE. https://doi.org/10.1109/COASE.2018.8560369.
  • Zohrehvandi, S. (2022). A project-scheduling and resource management heuristic algorithm in the construction of combined cycle power plant projects. Computers, 11(2), 23. https://doi.org/10.3390/computers11020023