53
Views
15
CrossRef citations to date
0
Altmetric
Articles

A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction

&

References

  • Harris, FW. How many parts to make at once. Factory. Mag Manag. 1913 Feb;10(2):135–136 and 152. Operations Research. Reprinted in 1990;38(6):947–950.
  • Erlenkotter D. Note – An early classic misplaced: Ford W. Harris’s economic order quantity model of 1915. Manage Sci. 1989 Jul;35(7):898–900.10.1287/mnsc.35.7.898
  • Erlenkotter D. Ford Whitman Harris and the economic order quantity model. Oper Res. 1990 Nov;38(6):937–946.10.1287/opre.38.6.937
  • Taft EW. The most economical production lot. Iron Age. 1918;101(18):1410–1412.
  • Salameh MK. Jaber MY. Economic production quantity model for items with imperfect quality. Int J Prod Econ. 2000 May 30;64(1-3):59–64.10.1016/S0925-5273(99)00044-4
  • Chiu YP. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optimiz. 2003 Aug;35(4):427–437.10.1080/03052150310001597783
  • Freimer M, Thomas D, Tyworth J. The value of setup cost reduction and process improvement for the economic production quantity model with defects. Eur J Oper Res. 2006 Aug 16;173(1):241–251.10.1016/j.ejor.2004.11.024
  • Chiu SW, Wang SL, Chiu YSP. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur J Oper Res. 2007 Jul 16;180(2):664–676.10.1016/j.ejor.2006.05.005
  • Halim KA, Giri BC, Chaudhuri KS. Fuzzy EPQ models for an imperfect production system. Int J Syst Sci. 2009 Jan;40(1):45–52.10.1080/00207720802090427
  • Kreng VB, Tan SJ. Optimal replenishment decision in an EPQ model with defective items under supply chain trade credit policy. Expert Syst Appl. 2011 Aug 8;38(8):9888–9899.10.1016/j.eswa.2011.02.040
  • Sarkar B, Moon I. An EPQ model with inflation in an imperfect production system. Appl Math Comput. 2011 Mar 1;217(13):6159–6167.10.1016/j.amc.2010.12.098
  • Pal B, Sana SS, Chaudhuri K. Maximising profits for an EPQ model with unreliable machine and rework of random defective items. Int J Syst Sci. 2013 Mar;44(3):582–594.10.1080/00207721.2011.617896
  • Sarkar B, Cárdenas-Barrón LE, Sarkar M, et al. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J Manuf Syst. 2014 Jul;33(3):423–435.10.1016/j.jmsy.2014.02.001
  • Eilon S. Multi-product batch production on a single machine—A problem revisited. Omega. 1985;13(5):453–468.10.1016/0305-0483(85)90073-8
  • Haji A, Haji R. Optimum aggregate inventory for scheduling multi-product single machine system with zero setup time. Int J Eng Trans B. 2002 Apr;15:41–48.
  • Li J, Wang S, Cheng TE. Analysis of postponement strategy by EPQ-based models with planned backorders. Omega. 2008;36(5):777–788.10.1016/j.omega.2006.03.002
  • Sugapriya C, Jeyaraman K. Determining a common production cycle time for an EPQ model for non-instantaneous deteriorating items allowing price discount using permissible delay in payments. ARPN J Eng Appl Sci. 2008 Apr;3(2):26–30.
  • Haji B, Haji R, Haji A. Optimal batch production with rework and non-zero setup cost for rework. The 39th International Conference on Computers & Industrial Engineering; 2009 Jul 6-9; University of Technology of Troyes, Paris, France; IEEE;2009. pp. 857–862
  • Taleizadeh AA, Niaki STA, Najafi AA. Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. J Comput Appl Math. 2010 Feb 15;233(8):1834–1849.10.1016/j.cam.2009.09.021
  • Taleizadeh A, Widyadanab GA, Wee HM, et al. Multi products single machine economic production quantity model with multiple batch size. Int J Ind Eng Comput. 2011 Apr;2(2):213–224.10.5267/j.ijiec
  • Taleizadeh AA, Sadjadi SJ, Niaki STA. Multiproduct EPQ model with single machine, backordering and immediate rework process. Eur J Ind Eng. 2011 Oct;5(4):388–411.10.1504/EJIE.2011.042738
  • Taleizadeh A, Cárdenas-Barrón L, Biabani J, et al. Multi products single machine EPQ model with immediate rework process. Int J Ind Eng Comput. 2012;3(2):93–102.10.5267/j.ijiec.2011.09.001
  • Taleizadeh AA, Jalali-Naini SG, Wee HM, et al. An imperfect multi-product production system with rework. Sci Iran. 2013 Jun;20(3):811–823.
  • Chiu YSP, Huang CC, Wu MF, et al. Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate. Econ Model. 2013 Sep;35:112–117.10.1016/j.econmod.2013.06.024
  • Taleizadeh AA, Cárdenas-Barrón LE, Mohammadi B. A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. Int J Prod Econ. 2014 Apr;150:9–27.10.1016/j.ijpe.2013.11.023
  • Pasandideh SHR, Niaki STA, Nobil AH, et al. A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost. Int J Prod Econ. 2015 Nov;169:203–214.10.1016/j.ijpe.2015.08.004
  • Nobil AH, Sedigh AHA, Cárdenas-Barrón LE. A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions. Expert Syst Appl. 2016 Sep;56(1):310–319.10.1016/j.eswa.2016.03.015

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.