358
Views
19
CrossRef citations to date
0
Altmetric
Articles

Stochastic supply chain model with imperfect production and controllable defective rate

&
Pages 133-146 | Received 27 Dec 2017, Accepted 06 Oct 2018, Published online: 22 Oct 2018

References

  • Arkan, A., & Hejazi, S. R. (2012). Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Computers & Industrial Engineering, 62, 56–69. doi: 10.1016/j.cie.2011.08.016
  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292–311. doi: 10.1111/j.1540-5915.1986.tb00228.x
  • Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead-time. International Journal of Production Economics, 92, 75–80. doi: 10.1016/j.ijpe.2003.09.012
  • Ben-Daya, M., & Raouf, A. (1994). Inventory models involving lead time as a decision variable. The Journal of the Operational Research Society, 45, 579–582. doi: 10.1057/jors.1994.85
  • Braglia, M., Castellano, D., & Gallo, M. (2016). An approximated closed form minimum-cost solution to the (r,q) policy with complete backordering and further developments. Applied Mathematical Modelling, 40, 8406–8423. doi: 10.1016/j.apm.2016.05.001
  • Cetinkaya, S., Lee, C., & Tekin, E. (2008). A stochastic model for joint inventory and outbound shipment decisions. IIE Transactions, 40, 324–40. doi: 10.1080/07408170701487989
  • Chang, H. C. (2004). An application of fuzzy sets theory to the EOQ model with imperfect quality items. Computers & Operations Research, 31, 2079–2092. doi: 10.1016/S0305-0548(03)00166-7
  • Chang, H. C., Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Integrated vendor-buyer cooperative inventory models with controllable lead-time and ordering cost reduction. European Journal of Operational Research, 170, 481–495. doi: 10.1016/j.ejor.2004.06.029
  • Chen, L.-H., & Kang, F.-S. (2010). Coordination between vendor and buyer considering trade credit and items of imperfect quality. International Journal of Production Economics, 123, 52–61. doi: 10.1016/j.ijpe.2009.06.043
  • Das, C (1975). Effect of lead time on inventory: A static analysis. Operational Research Quarterly, 26, 273–282. doi: 10.1057/jors.1975.61
  • Dey, O., & Giri, B. C. (2014). Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. International Journal of Production Economics, 155, 222–228. doi: 10.1016/j.ijpe.2014.02.004
  • Foote, B., Kebriaei, N., & Kumin, H. (1988). Heuristic policies for inventory ordering problems with long and randomly varying lead times. Journal of Operations Management, 7, 115–124. doi: 10.1016/0272-6963(81)90008-5
  • Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. The International Journal of Production Research, 15, 107–111. doi: 10.1080/00207547708943107
  • Goyal, S. K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19, 236–241. doi: 10.1111/j.1540-5915.1988.tb00264.x
  • Goyal, S. K., & Cárdenas-Barrón, L. E. (2002). Note on: Economic production quantity model for items with imperfect quality a practical approach. International Journal of Production Economics, 77, 85–87. doi: 10.1016/S0925-5273(01)00203-1
  • Ha, D., & Kim, S. L. (1997). Implementation of JIT purchasing: An integrated approach. Production Planning and Control, l8, 152–157. doi: 10.1080/095372897235415
  • Heydari, J., Zaabi-Ahmadi, P., & Choi, T. M. (2016). Coordinating supply chains with stochastic demand by crashing lead times. Computers and Operations Research. doi:10.1016/j.cor.2016.10.009.
  • Hossain, S. J., Ohaiba, M. M., & Sarker, B. R. (2017). An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness. International Journal of Production Economics, 188, 50–62. doi: 10.1016/j.ijpe.2017.03.015
  • Huang, C.-K. (2010). An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments. Applied Mathematical Modelling, 34, 1352–1359. doi: 10.1016/j.apm.2009.08.015
  • Huang, C.-K., Tsai, D.-M., Wu, J.-C., & Chung, K.-J. (2010). An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments. European Journal of Operational Research, 202, 473–478. doi: 10.1016/j.ejor.2009.05.035
  • Jha, J. K., & Shanker, K. (2013). Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Applied Mathematical Modelling, 37, 1753–1767. doi: 10.1016/j.apm.2012.04.042
  • Kang, J. H., & Kim, Y. D. (2010). Inventory replenishment and delivery planning in a two-level supply chain with compound Poisson demands. The International Journal of Advanced Manufacturing Technology, 49, 1107–1118. doi: 10.1007/s00170-009-2468-y
  • Keller, G., & Noori, H. (1988). Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Transactions, 20, 284–291. doi: 10.1080/07408178808966182
  • Kim, K. L., Hayya, J. C., & Hong, J. D. (1992). Setup reduction in economic production quantity model. Decision Sciences, 23, 500–508. doi: 10.1111/j.1540-5915.1992.tb00402.x
  • Lee, W. C., Wu, J. W., & Hou, W. B. (2004). A note on inventory model involving variable lead time with defective units for mixtures of distribution. International Journal of Production Economics, 89, 31–44. doi: 10.1016/S0925-5273(03)00197-X
  • Lee, W. C., Wu, J. W., & Hsu, J. W. (2006). Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate. Applied Mathematics and Computation, 175, 1125–1138. doi: 10.1016/j.amc.2005.08.046
  • Li, Y., Xu, X., & Ye, F. (2011). Supply chain coordination model with controllable lead time and service level constraint. Computers & Industrial Engineering, 61, 858–864. doi: 10.1016/j.cie.2011.05.019
  • Liao, C. J., & Shyu, C. H. (1991). An analytical determination of lead time with normal demand. International Journal of Operations & Production Management, 11, 72–78. doi: 10.1108/EUM0000000001287
  • Lin, Y.-J. (2008). Minimax distribution free procedure with backorder price discount. International Journal of Production Economics, 111(1), 118–128. doi: 10.1016/j.ijpe.2006.11.016
  • Lin, Y. J. (2009). An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers & Industrial Engineering, 56, 1597–1606. doi: 10.1016/j.cie.2008.10.009
  • Lou, K.-R., & Wang, W.-C. (2013). A comprehensive extension of an integrated inventory model with ordering cost reduction and permissible delay in payments. Applied Mathematical Modelling, 37, 4709–4716. doi: 10.1016/j.apm.2012.09.074
  • Magson, D. (1979). Stock control when the lead time cannot be considered constant. The Journal of the Operational Research Society, 30, 317–322. doi: 10.1057/jors.1979.71
  • Mandal, P., & Giri, B. C. (2015). A single-vendor multi-buyer integrated model with controllable lead time and quality improvement through reduction in defective items. International Journal of Systems Science: Operations & Logistics, 2, 1–14.
  • Naddor, E. (1966). Inventory Systems. New York, NY: Wiley.
  • Nasri, F., Affisco, J. F., & Paknejad, M. J. (1990). Setup cost reduction in an inventory model with finite-range stochastic lead-times. The International Journal of Production Research, 28, 199–212. doi: 10.1080/00207549008942693
  • Nouri, M., Hosseini-Motlagh, S.-M., Nematollahi, M., & Sarker, B. R. (2018). Coordinating manufacturer's innovation and retailer's promotion and replenishment using a compensation-based wholesale price contract. International Journal of Production Economics, 198, 11–24. doi: 10.1016/j.ijpe.2018.01.023
  • Ouyang, L. Y., & Wu, K. S. (1997). Mixture inventory model involving variable lead time with a service level constraint. Computers & Operations Research, 24, 875–882. doi: 10.1016/S0305-0548(96)00084-6
  • Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2004). Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics, 92, 255–266. doi: 10.1016/j.ijpe.2003.10.016
  • Ouyang, L. Y., Yeh, N. C., & Wu, K. S. (1996). Mixture inventory model with backorders and lost sales for variable lead time. The Journal of the Operational Research Society, 47, 829–832. doi: 10.1057/jors.1996.102
  • Paknejad, M. J., Nasri, F., & Affisco, J. F. (1995). Defective units in a continuous review (S,Q) system. International Journal of Production Research, 33, 2767–2777. doi: 10.1080/00207549508904844
  • Pan, C. H., & Hsiao, Y. C. (2001). Inventory models with back-order discounts and variable lead time. International Journal of Systems Science, 32, 925–929. doi: 10.1080/00207720010004449
  • Pan, J. C., & Hsiao, Y. C. (2005). Integrated inventory models with controllable lead time and backorder discount considerations. International Journal of Production Research, 93, 387–397. doi: 10.1016/j.ijpe.2004.06.035
  • Pan, J. C., & Yang, J. S. (2002). A study of an integrated inventory with controllable lead time. International Journal of Production Research, 40, 1263–1273. doi: 10.1080/00207540110105680
  • Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Research, 100, 148–154. doi: 10.1016/j.ijpe.2004.11.004
  • Park, S., Lee, T.-E., & Sung, C. S. (2010). A three-level supply chain network design model with risk-pooling and lead times. Transportation Research Part E: Logistics and Transportation Review, 46(5), 563–581. doi: 10.1016/j.tre.2009.12.004
  • Porteus, E. L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137–144. doi: 10.1287/opre.34.1.137
  • Porteus, L. E. (1985). Investing in reduced setups in the EOQ model. Management Science, 31, 998–1010. doi: 10.1287/mnsc.31.8.998
  • Priyan, S., & Uthayakumar, R. (2014). Trade credit financing in the vendor-buyer inventory system with ordering cost reduction, transportation cost and backorder price discount when the received quantity is uncertain. Journal of Manufacturing Systems, 33, 654–674. doi: 10.1016/j.jmsy.2014.06.003
  • Rosenblatt, M. J., & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48–55. doi: 10.1080/07408178608975329
  • Salameh, M. K., & Jaber, M. Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64. doi: 10.1016/S0925-5273(99)00044-4
  • Sarkar, B., Mandal, B., & Sarkar, S. (2015). Quality improvement and backorder price discount under controllable lead time in an inventory model. Journal of Manufacturing Systems, 35, 26–36. doi: 10.1016/j.jmsy.2014.11.012
  • Sarkar, S., & Giri, B. C. (2018). A vendor-buyer integrated inventory system with variable lead time and uncertain market demand. Operational Research. doi:10.1007/s12351-018-0418-x.
  • Tersine, R. J. (1994). Principles of inventory and materials management. Englewood Cliffs, NJ: Prentice Hall.
  • Tiwari, S., Sana, S. S., & Sarkar, S. (2018). Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas, 112(4), 1075–1099. doi: 10.1007/s13398-017-0410-y
  • Wee, H. M., Yu, J., & Chen, M. C. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. Omega, 35, 7–11. doi: 10.1016/j.omega.2005.01.019
  • Wu, J. W., & Tsai, H. Y. (2001). Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures of normal distribution. International Journal of Systems Science, 32, 259–268. doi: 10.1080/00207720121523
  • Wu, K. S. (2000). (Q;r) inventory model with variable lead time when the amount received is uncertain. Journal of Information and Management Sciences, 11, 81–94.
  • Yang, J. S., & Pan, J. C. (2004). Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research, 42, 853–863. doi: 10.1080/00207540310001632448
  • Yu, A. J., & Dong, Y. (2014). A numerical solution for a two-stage production and inventory system with random demand arrivals. Computers & Operations Research, 44, 13–21. doi: 10.1016/j.cor.2013.10.011
  • Zhang, T., Liang, L., Yu, Y., & Yu, Y. (2007). An integrated vendor-managed inventory model for a two-echelon system with order cost reduction. International Journal of Production Economics, 109, 241–253. doi: 10.1016/j.ijpe.2006.12.051
  • Zikopoulos, C. (2017). Remanufacturing lot sizing with stochastic lead-time resulting from stochastic quality of returns. International Journal of Production Research, 55(6), 1565–1587. doi: 10.1080/00207543.2016.1150616

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.