297
Views
8
CrossRef citations to date
0
Altmetric
Articles

Imperfect economic production quantity models under predictive maintenance and reworking

, , , , &
Pages 347-360 | Received 08 Dec 2018, Accepted 23 Feb 2019, Published online: 20 Mar 2019

References

  • Albin, S. L. , & Chao, S. (1992). Preventive replacement in systems with dependent components. IEEE Transactions on Reliability , 41 (2), 230–238. doi: 10.1109/24.257786
  • Blanchard, B. S. , Fabrycky, W. J. , & Fabrycky, W. J. (1990). Systems engineering and analysis . Englewood Cliffs, NJ : Prentice Hall.
  • Bloch-Mercier, S. (2002). A preventive maintenance policy with sequential checking procedure for a Markov deteriorating system. European Journal of Operational Research , 142 (3), 548–576. doi: 10.1016/S0377-2217(01)00310-1
  • Chiu, S. W. , Wang, S. L. , & Chiu, Y. S. P. (2007). Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research , 180 (2), 664–676. doi: 10.1016/j.ejor.2006.05.005
  • Curcurù, G. , Galante, G. , & Lombardo, A. (2010). A predictive maintenance policy with imperfect monitoring. Reliability Engineering & System Safety , 95 (9), 989–997. doi: 10.1016/j.ress.2010.04.010
  • Daily, J. , & Peterson, J. (2017). Predictive maintenance: How big data analysis can improve maintenance. In K. Richter & J. Walther (Eds.), Supply Chain Integration Challenges in Commercial Aerospace. A Comprehensive Perspective on the Aviation Value Chain (pp. 267–278). Cham : Springer.
  • Grall, A. , Dieulle, L. , Bérenguer, C. , & Roussignol, M. (2002). Continuous-time predictive-maintenance scheduling for a deteriorating system. IEEE Transactions on Reliability , 51 (2), 141–150. doi: 10.1109/TR.2002.1011518
  • Jafari, L. , & Makis, V. (2016). Joint optimization of lot-sizing and maintenance policy for a partially observable two-unit system. The International Journal of Advanced Manufacturing Technology , 87 (5-8), 1621–1639. doi: 10.1007/s00170-016-8556-x
  • Khanna, A. , Kishore, A. , & Jaggi, C. (2017). Strategic production modeling for defective items with imperfect inspection process, rework, and sales return under two-level trade credit. International Journal of Industrial Engineering Computations , 8 (1), 85–118. doi: 10.5267/j.ijiec.2016.7.001
  • Lasi, H. , Fettke, P. , Kemper, H.-G. , Feld, T. , & Hoffmann, M. (2014). Industry 4.0. Business & Information Systems Engineering , 6 (4), 239–242. doi: 10.1007/s12599-014-0334-4
  • Lee, J. , Kao, H.-A. , & Yang, S. (2014). Service innovation and smart analytics for industry 4.0 and big data environment. Procedia Cirp , 16 , 3–8. doi: 10.1016/j.procir.2014.02.001
  • Li, N. , Chan, F. T. S. , Chung, S. H. , & Tai, A. H. (2015). An EPQ model for deteriorating production system and items with rework. Mathematical Problems in Engineering , 2015 . doi:10.1155/2015/957970
  • Li, N. , Chan, F. T. S. , Chung, S. H. , & Tai, A. H. (2017). A stochastic production-inventory model in a two-state production system with inventory deterioration, rework process, and backordering. IEEE Transactions on Systems, Man, and Cybernetics: Systems , 47 (6), 916–926. doi: 10.1109/TSMC.2016.2523802
  • Liao, G. L. (2016). Production and maintenance Policies for an EPQ model With perfect repair, rework, free-repair warranty, and preventive maintenance. IEEE Transactions on Systems, Man, and Cybernetics: Systems , 46 (8), 1129–1139. doi: 10.1109/TSMC.2015.2465961
  • Liao, G. L. , Chen, Y. H. , & Sheu, S. H. (2009). Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance. European Journal of Operational Research , 195 (2), 348–357. doi: 10.1016/j.ejor.2008.01.004
  • Liao, H. , Elsayed, E. A. , & Chan, L. Y. (2006). Maintenance of continuously monitored degrading systems. European Journal of Operational Research , 175 (2), 821–835. doi: 10.1016/j.ejor.2005.05.017
  • Lu, S. , Tu, Y. C. , & Lu, H. (2007). Predictive condition-based maintenance for continuously deteriorating systems. Quality and Reliability Engineering International , 23 (1), 71–81. doi: 10.1002/qre.823
  • Nobil, A. H. , & Taleizadeh, A. A. (2016). A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction. International Journal of Advanced Logistics , 5 , 141–152. doi: 10.1080/2287108X.2016.1207975
  • Peng, H. , & van Houtum, G. J. (2016). Joint optimization of condition-based maintenance and production lot-sizing. European Journal of Operational Research , 253 (1), 94–107. doi: 10.1016/j.ejor.2016.02.027
  • Rosenblatt, M. J. , & Lee, H. L. (1986). Economic production cycles with imperfect production processes. IIE Transactions , 18 (1), 48–55. doi: 10.1080/07408178608975329
  • Taft, E. (1918). The most economical production lot. Iron Age , 101 (18), 1410–1412.
  • Taleizadeh, A. A. , Sari-Khanbaglo, M. P. , & Cárdenas-Barrón, L. E. (2017). Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Transactions on Systems, Man, and Cybernetics: Systems , 99 , 1–12.
  • Tsang, A. H. (1995). Condition-based maintenance: Tools and decision making. Journal of Quality in Maintenance Engineering , 1 (3), 3–17. doi: 10.1108/13552519510096350
  • Tsao, Y. C. , Zhang, Q. , Chang, F. C. , & Vu, T. L. (2017). An imperfect production model under radio frequency identification adoption and trade credit. Applied Mathematical Modelling , 42 , 493–508. doi: 10.1016/j.apm.2016.10.009
  • Wang, J. , Zhang, L. , Duan, L. , & Gao, R. X. (2017). A new paradigm of cloud-based predictive maintenance for intelligent manufacturing. Journal of Intelligent Manufacturing , 28 (5), 1125–1137. doi: 10.1007/s10845-015-1066-0
  • Wen, D. , Ershun, P. , Ying, W. , & Wenzhu, L. (2016). An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy. Journal of Intelligent Manufacturing , 27 (6), 1323–1333. doi: 10.1007/s10845-014-0954-z
  • Yedes, Y. , Chelbi, A. , & Rezg, N. (2012). Quasi-optimal integrated production, inventory and maintenance policies for a single-vendor single-buyer system with imperfect production process. Journal of Intelligent Manufacturing , 23 (4), 1245–1256. doi: 10.1007/s10845-010-0423-2
  • Zhao, Z. , Wang, F. L. , Jia, M. X. , & Wang, S. (2010). Predictive maintenance policy based on process data. Chemometrics and Intelligent Laboratory Systems , 103 (2), 137–143. doi: 10.1016/j.chemolab.2010.06.009

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.